A stacked laundry unit looks simple on a drawing: one machine over another, a cabinet around them, done. On site it is rarely that tidy. The stack changes the floor loading conversation, moves access points upward, and ties cabinetry dimensions to appliance dimensions that were chosen by somebody else weeks earlier. An installation plan is what keeps those three things from colliding. Below is what we ask project teams to settle before a single panel is cut.
What the plan has to decide first: layout and clearances
Start with the machine, not the cabinet. Front-load washers and dryers have door swings and service zones that set the minimum room size, and a stack raises the loading height of the upper appliance well above counter level. Decide early who uses this laundry — a family, a housekeeping team, a short-stay guest — because that determines whether the upper drum should sit at a comfortable reach or simply out of the way.
Then fix the clearances: space behind the units for hoses and ducting, room beside them for ventilation, and an opening wide enough to walk the appliances in before the enclosure is closed. It sounds obvious, but the most common site problem we see is a joinery box built to internal appliance dimensions with no allowance for the actual machine feet, handles or vibration gap.
Our Stacked Laundry Units are made to measure, so the enclosure is drawn around the appliances and the room rather than the other way round. That only works if the plan records the appliance selection before production starts.
Services: water, waste, power and ventilation
A stacked arrangement shifts services vertically. Taps and waste outlets that would sit behind a side-by-side pair now need to be reachable through the cabinet, usually above the lower machine, and still accessible after the enclosure is fitted. Power points should not sit directly behind either appliance; they need to be clear of heat and vibration and reachable for disconnection.
For the plan, record for each unit:
- hot and cold tap positions and heights, relative to finished floor level and to the finished wall face
- waste connection position, and whether a standpipe or an in-cabinet trap is used
- power outlet location, circuit arrangement and disconnection point
- for a vented dryer, where the exhaust duct runs and how it exits the building
- floor level and floor finish — a stack transmits more vibration through one footprint than two machines spread apart
These are coordination items with the plumber, electrician and flooring contractor. Whoever writes them into the plan, with dimensions off a fixed reference line, saves the joiner from guessing on site.
Appliance compatibility and access
Not every washer pairs with every dryer, and not every pair can be stacked without the manufacturer's stacking kit. The plan should name the exact models, confirm that they are stackable together, and state who supplies the kit — the appliance supplier, the builder, or us as part of the joinery package. Also decide the door handing of the cabinet and whether the appliances' own doors open freely against it.
Access matters twice: once when the machines are carried into the room, and again years later when a service technician needs to pull one out. If the enclosure is fixed and non-demountable, future servicing becomes a demolition job. We prefer an enclosure that can be opened or lifted off.
Storage, bench and the things that surround the stack
The appliances are only part of a working laundry. The plan should account for where detergent lives, where washing goes in and out of the cabinet, whether there is a folding or sorting surface, and whether an ironing or hanging zone sits nearby. A stack frees floor area; that gain disappears if nothing else is planned for it.
This is why we usually design the stack as part of a wider set rather than on its own. Laundry & Storage Combo arrangements put cabinetry, hampers and a work surface around the machines, and where the room is too narrow for a full run, Compact Laundry Solutions keep the same functions in a smaller footprint. Pull-out hampers and tall storage cabinets are worth pricing at this stage, not as later additions.
Materials and finishes for a damp room
Laundries are humid, splashed and frequently cleaned. Specify cabinet materials and edge treatments that suit that environment, and say so in the plan rather than leaving it to whatever is in stock. Pay attention to the plinth and lower panels, which take mop water, and to any timber-look finish near the shower or bath if the laundry shares a bathroom.
Where the laundry opens into a living area or a guest suite, the finish also has to match surrounding joinery. We produce finishes and materials to project specification, so samples should be signed off with the same reference used for the bathrooms and kitchen.
Delivery, sequence and site readiness
Custom joinery arrives on a lead time that starts after drawings are approved. Work backwards from your handover date: drawing approval, production, shipping, then installation. The room itself has to be ready — tiled floor laid and set, services tested and pressure-tested, walls straight and finished levels confirmed. Installing cabinetry against an unconfirmed floor level is how a stack ends up out of plumb.
Decide the sequence too: appliances are usually delivered after the enclosure, but the enclosure cannot be fixed until the services are in their final positions. Write that order into the programme and name who does each step.
What we need from you to draw the plan
| Item to confirm | Why it matters |
|---|---|
| Appliance make and model, or target dimensions | Sets internal cabinet size, stacking method and loading heights |
| Room sketch with finished floor levels and wall faces | Fixes enclosure size, door swing and access route |
| Service positions: taps, waste, power, ducting | Determines panel cut-outs and what stays accessible later |
| Storage and work-surface requirements | Decides whether the stack stands alone or sits in a run |
| Finish reference from the wider project | Keeps the laundry consistent with adjacent joinery |
| Delivery address and installation responsibility | Sets packaging, freight mode and who fixes the units on site |
Anything left blank in that table becomes a query during production, and queries stop the clock. Fill them in before drawings are issued.
Before you sign off: a short checklist
- Appliances named, confirmed stackable, stacking kit assigned to a supplier
- Loading height of the upper machine reviewed against who uses the room
- Rear and side clearances shown on the drawing, including hose and duct space
- Taps, waste, power and exhaust positions dimensioned off a fixed reference line
- Ancillary storage, hamper and folding surface included in the same drawing set
- Cabinet materials specified for damp and frequent cleaning
- Future appliance removal route kept clear
- Site readiness dates agreed with trades before production starts
If you are specifying laundry joinery for a villa, apartment or hospitality fit-out, send us the room dimensions and the appliances you intend to use. As a one-stop furniture and building materials supplier, we can draw the enclosure to those appliances, build it to your finish schedule, ship it to site and support installation — one package rather than three separate trades reconciling their own drawings.
Send your layout and appliance details and we will return a dimensioned proposal for review before anything goes into production.