A woven outdoor dining set looks simple from a distance: chairs, a table, an umbrella. Order it for a resort terrace or a villa pool deck and the picture changes quickly. Frame alloy, weave resin, cushion foam, tabletop material, seat count and delivery method all arrive as separate line items, and each one changes both the price and how the set behaves after two wet seasons. This guide walks through the decisions worth putting in writing before you place an order for our Synthetic Wicker Outdoor Dining Sets – Round Teak-Look Table & Square Sintered Stone Table, the tropical woven collection that pairs one open lattice wicker dining chair with two table options: a round teak-effect slat top and a square sintered stone top.
Start With the Layout, Not the Finish
Both versions of this collection share the same chair, so the choice between them is really a choice about how the space will be used. The round teak-look slat table reads casual and natural — it suits a villa terrace, a coastal garden or a low-turnover al fresco corner where the mood matters more than throughput. The square sintered stone top is the one our hospitality buyers usually specify for high-use commercial resort dining, because a hard, non-porous surface is quicker to wipe down between seatings and hides water rings from glasses and cold drinks.
Before you pick a colour or a weave, settle these questions on site:
- Footprint and clearance. Measure the paved or decked area, then allow room for chairs to be pulled out behind seated diners. A set that fits the drawing but not the walkway becomes dead furniture in service.
- Seat count and mix. State the number of seats you need per table and whether any tables must take a wheelchair user or a high chair. Chair spacing at a square top differs from a round one, so seat count drives table size.
- Table shape versus circulation. Round tops keep traffic moving around them and soften tight corners; square tops align neatly against a balustrade or in rows along a colonnade.
- Storage and stacking. If the dining area closes for weather or an event changeover, say so. Stackability and cushion storage affect which chair profile you should request.
The Customisation Points We Need in Writing
We manufacture this family to order rather than ship from stock, so the specification sheet is where your cost and your lead time are actually decided. For each project we ask buyers to confirm the following.
1. Wicker shade and weave profile
The lattice pattern on this chair is fixed as a design feature, but the wicker shade is not. Send us a physical sample or a named colour reference rather than a photograph taken in sunlight — phone pictures of woven material shift hue by a surprising margin, and a shade approved from a photo is the most common cause of a rejected delivery. If your project already has woven lounge pieces on site, send a swatch of those so we can match or deliberately contrast them.
2. Frame construction
Chairs in this collection are built on aluminium frames wrapped in all-weather rattan. Aluminium is the right call for poolside and coastal settings because it does not rust the way untreated steel does. What still needs agreeing is the tube specification and joint detail used for your volume. Commercial dining chairs take far more abuse than residential ones — staff stacking, guests leaning back, daily cleaning — so tell us the venue type up front and we will build to that duty level rather than to a domestic one.
3. Cushion fabric, foam and storage
The set ships with thick cushions, and cushion comfort is subjective, so specify it: foam density for the seat, cover colour from a named outdoor fabric range, and whether covers are to be removable for laundering. Then decide the operational question your housekeeping team will ask on day one — where do cushions go overnight or during rain? If the answer is a store room, budget for that space; if it is not available, we can discuss tighter cushion profiles and a faster-drying fill instead.
4. Tabletop material and dimensions
Two tabletops are offered: teak-effect slat in the round layout, sintered stone in the square one. Both can be made to project dimensions rather than a catalogue size, which matters when tables must line up with an existing pergola bay, a shade sail span or a fixed paving grid. Confirm the finished height you want as well — dining height versus a slightly lower terrace height changes chair proportions too.
5. Table base and surface protection
Ask what sits under the top and how the base meets the floor. On a sloped deck or an outdoor rug, adjustable levelling feet keep a table steady; on a hard paved poolside, you want feet that will not mark or trap moisture. These details are cheap to agree in the sample stage and awkward to fix after containers arrive.
6. Mix-and-match across the wider terrace
Most projects do not stop at dining. Because this chair design is shared across both table options, it pairs naturally with other woven and aluminium pieces in our range — for example a matching all-weather wicker conversation set for the lounge zone, or an aluminium and teak-look slat dining set with sun lounger by the pool. Ordering these together lets us match wicker shades, cushion fabrics and table heights across zones in one production run.
How the Two Tabletops Compare in Service
| Decision factor | Round teak-look slat top | Square sintered stone top |
|---|---|---|
| Best fit | Villa terrace, coastal garden, café patio, low-turnover al fresco | Resort and hotel dining with high daily seat turnover |
| Daily cleaning | Slat gaps need brushing or rinsing so crumbs and sand do not collect | Wipe-flat surface, quick between seatings |
| Look and feel | Warm, casual, natural-wood appearance without the upkeep of solid teak | Crisp, architectural, stone-look surface |
| Siting notes | Reads softer under planting and timber decking | Sits well against balustrades, tiled decks and colonnades |
| Ask us about | Slat direction relative to drainage fall; overall diameter | Edge profile, table size, protective feet for the paving you have |
Whichever top you choose, check the material choice against your own site conditions before signing off. Salt spray, seasonal heavy wetting, strong sun and airborne sand all age outdoor furniture differently, so tell us the actual exposure your terrace gets and we will advise on finish and detailing accordingly rather than assume a generic climate.
Sample Stage: What to Approve and in What Order
For any project volume we recommend a short, written sample sequence. It costs little and prevents the expensive version of the same mistake.
- Round one — materials pack. Wicker swatch, cushion fabric card, tabletop sample or offcut, frame finish detail. Approve by physical item, signed and dated.
- Round two — one complete setting. Chair plus table with approved cushions, checked for seat height, armrest clearance, table stability and how the chair stacks or tucks.
- Round three — sign-off pack. Approved sample photographed against your reference images, specification sheet countersigned by both sides, quantities and per-venue allocation locked.
Commercial Terms That Change the Price
When you request a quotation for this collection, the number depends on a short list of variables. Give us these and the quote comes back comparable line to line:
- Total quantity, split by venue or zone rather than one lump figure.
- Which tabletop option each zone uses — mixing round and square within one order is normal and often the right answer.
- Custom dimensions versus standard sizes, and any non-standard cushion colour count. Every extra fabric colour adds a production break.
- Branding or private labelling if you want it; we support customisation on this range as part of our custom and OEM service.
- Delivery terms. Our logistics and door-to-door delivery covers freight arrangements, but you should still confirm Incoterms, duties and who handles the last leg on site for your address.
Delivery, Installation and the After-Sales Conversation
Ask how the set will arrive: assembled or part-assembled, how many cartons per pallet, and whether cushion bags ship separately. That determines whether your team needs a lift, a trolley and how many people on delivery day. Our installation and after-sales support covers site installation and inspection, and the same page lists warranty coverage, spare parts and ongoing maintenance — but confirm in writing what applies to your order, including which replaceable items such as cushion covers are stocked as spares and how a claim is raised.
It is also worth naming the cleaning regime you intend to run. Woven material collects dust and sand in its lattice; a pressure washer on the wrong setting will fray it. Ask us for a care routine that matches how your staff actually clean, not an ideal one.
Quick Answers
Can I order both tabletop options on one purchase order?
Yes. Both versions use the same lattice wicker chair on an aluminium frame, so they coordinate visually and can be produced in one run with per-zone quantities.
Is the teak-look top real teak?
No. It is a teak-effect slat surface, chosen for the warm look of teak with lower upkeep. If solid timber is required for a specific scheme, raise it at the sample stage as a separate specification.
Which top suits a beachfront restaurant?
For high seat turnover we normally steer buyers to the square sintered stone top for its simple daily wipe-down. Frame and finish details still need checking against your exposure, so send us the site conditions before committing.
Can cushion colours be matched to our brand palette?
Yes, from named outdoor fabric ranges. Each additional colour adds a production break, so keep the palette tight across zones where you can.
Send Us the Specification, Not Just a Photo
The projects that go smoothly are the ones where the buyer sends layout drawings, seat counts, exposure notes and approved material samples before an order is placed. If you are furnishing a resort terrace, a villa pool deck or a café patio, send us your plan and your shortlist of finishes and we will come back with a specification sheet and a comparable quotation for this woven dining family — and for the matching lounge and sun-lounger zones around it.
SANTERSON has been manufacturing furniture and building materials since 2008, supplying villa, hospitality and office projects worldwide. Talk to us about your outdoor dining specification through our contact page.
Specify your woven dining set today
Send drawings, seat counts and finish references for the Synthetic Wicker Outdoor Dining Sets – Round Teak-Look Table & Square Sintered Stone Table, and we will return a project specification and quotation.
Phone / WhatsApp: +86-13928214007 (PHILLIP) · Email: santerson@qq.com