A furniture and building materials quotation is not one number. It is the sum of sizes, materials, hardware, packaging and freight terms, and every one of those lines depends on information only you can supply. Send a rough enquiry and you get a rough price, usually followed by weeks of email exchanges. Send a complete brief and you get comparable prices from several factories in one round.
Below is the checklist we work from when a project team asks us to price furniture, cabinetry or interior fixtures for a villa, hotel or office build. It applies whether you are dealing with us or comparing three other manufacturers — the data points are the same, and so are the gaps that cause re-quoting.
Start With the Project Frame, Not the Product
Before any item is priced, a supplier needs to know what kind of job it is. The same three-seater sofa is built differently for a private villa terrace and for a hotel pool deck that sees hundreds of sit-downs a season. Tell us:
- The project type — residential villa, boutique hotel, apartment block, office fit-out, resort or mixed-use.
- The destination country and city, plus whether the goods go to a single site or several.
- Whether the building is new construction or a renovation, because existing slab levels, wall finishes and door openings change what can be delivered through them.
- Your target handover date, working backwards from installation rather than from the enquiry date.
- Who signs off the specification — the architect, the interior designer, the builder or the owner. That determines how many revision rounds you should budget for.
The Drawing Package Is What Makes a Price Real
For loose furniture, photographs and reference dimensions are often enough to start. For anything built-in — kitchen cabinetry, wardrobes, vanities, wall panelling, media walls — a price without drawings is a guess. A useful package contains:
- Floor plans with room dimensions and clear heights, in millimetres.
- Elevations for every wall where cabinetry or panelling will sit, showing the position of skirting, cornices, architraves, switches, power points and downlights.
- Reflected ceiling plans where wardrobes or storage walls run floor to ceiling, so the supplier knows whether the ceiling is level.
- Wet-area layouts for bathrooms and kitchens: waste and water outlet positions, trap type and rough-in distance, countertop thickness and splashback extent.
- A room-by-room schedule listing each item, quantity and the finish code you expect.
If those drawings do not exist yet, say so in your enquiry. Our Interior Design Services team works from space layout planning through furniture layouts and 3D renderings, then carries the same package into production coordination — which removes the handover gap between a designer's drawing and a factory's cutting list.
Materials, Finishes and Hardware: Be Specific or Expect Substitutions
"Oak wardrobe" means nothing on its own. Specify the construction and the surface separately:
| Item type | What to state | Why it changes the price |
|---|---|---|
| Kitchen cabinets | Panel substrate, door material (acrylic, lacquer, melamine, PVC, veneer, solid wood), finish sheen, handle or handleless, countertop material and thickness | Hardware grade and door construction drive cost more than cabinet size does |
| Wardrobes and storage walls | Door type (hinged, sliding, open), internal layout of hanging zones, drawers and shelves, glass type where used, frame profile colour | Internal fittings are quoted per zone; a layout change after order is a re-cut, not an adjustment |
| Outdoor furniture | Frame metal, weave material (rope, wicker), timber accents, cushion fabric and foam, table top (teak-look slat, sintered stone, marble) | Coastal and poolside settings need different frame and fastener choices from a covered terrace |
| Bathroom fixtures | Ceramic item model or dimensions, trap type and rough-in, wall-hung or floor-standing, vanity size and basin integration | Drain geometry decides whether an item physically fits the outlet already on site |
| Flooring and cladding | Species or material, top-layer thickness, board format and pattern, grade tolerance for knots and colour variation | Pattern formats such as herringbone and parquet carry different yield loss than straight planks |
| Ceilings and screens | Panel system type, perforation or solid, surface treatment, panel module size, support grid details | Module coordination with services above the ceiling determines how much cutting is needed on site |
Where you have a physical sample or an existing specification sheet from a previous project, send it. A tangible reference removes more ambiguity than ten paragraphs of description.
Quantities, Phasing and Order Minimums
Give quantities per item and per room, and state whether the order is one release or several. Repeat types matter: 40 identical guest-room wardrobes priced on a shared cutting list is a different exercise from 40 unique ones. Also confirm:
- Total quantity per line item, plus any spares you want held for future maintenance.
- Whether the order will be released in phases tied to site readiness.
- Your tolerance on minimum order quantities — some product families have them, and a supplier who knows your flexibility can group items into one production run instead of three.
Delivery Terms Decide the Real Landed Cost
A unit price quoted ex-works is not comparable to a delivered price. State clearly:
- The delivery address and whether it is a port, a warehouse or the final site.
- Site access constraints: lift dimensions, stair widths, crane or hoist availability, parking for a container truck, and any restriction on working hours.
- Whether you want door-to-door delivery handled for you, or you have your own freight forwarder who needs packing lists and container loading plans from the factory.
- Your preferred Incoterms, and who is handling import clearance and duty in the destination country.
Our logistics and door-to-door delivery service covers freight by sea, air and rail, along with commercial invoices, packing lists and certificates of origin. Tell us which documents your customs broker requires at the enquiry stage — assembling them late holds a container at port.
Installation and After-sales Expectations
Quote requests often stop at delivery, then the project discovers that built-in joinery needs fitting. Include in your brief:
- Who installs — your trades, or a service you want arranged.
- The trade sequence on site: when flooring, painting and electrical rough-ins will be complete relative to delivery.
- What you expect to be covered after handover, and how spare parts for hardware are supplied later.
We list installation, snag inspection, warranty coverage, spare parts and ongoing maintenance under installation and after-sales support. Ask for the written terms in the quotation round rather than after the order is placed.
The five questions a supplier will ask you first. What is the destination site? What drawings exist? Which materials and finishes are fixed, and which are still open? How many of each item? Who delivers and who installs? Answer those five in your opening email and most quotations come back usable on the first pass.
How This Works With a Single-Source Package
When one supplier carries furniture, cabinetry, flooring, wall finishes and bathroom fixtures for the same project, the information you supply once feeds every category. That is the practical argument for turnkey interior project solutions: one drawing set, one specification sheet, one production schedule and one delivery window instead of six vendors reconciling their own documents.
It also means one place where conflicts surface early — a wardrobe depth that clashes with a floor outlet, a flooring thickness that changes a door swing, a ceiling module that no longer aligns with a light line. Those are the collisions that cost weeks when categories are bought separately.
A Short Example From a Villa Package
Take a villa where the brief covers bedroom storage, an open-plan kitchen and a terrace. A workable enquiry would name the wardrobe run per bedroom with elevations and internal layout; the kitchen as a schedule of runs with door material, sheen and handle detail plus appliance models for cut-outs; and the terrace as a furniture set with frame, weave, cushion fabric and table-top material specified. Each line then prices cleanly, and each revision is a change to a known specification rather than a restart.
What This Checklist Looks Like in Practice
The published project cases show the categories that get bundled into one enquiry: villa joinery and cabinetry at North Turramurra, whole-villa furniture packages at Willoughby, and completed renovations in Melbourne and Sydney. Each of those needed the same inputs — drawings, finish schedule, quantities and delivery terms — before a usable price existed.
Frequently Asked Questions
Can I get a price before the drawings are finished?
You can get a budget range for loose furniture from reference images and dimensions. Built-in items priced without elevations will move once the drawings land, so treat that figure as indicative only.
What if my site levels are not yet confirmed?
Tell us which levels are provisional and mark those walls on the drawings. Floor-to-ceiling joinery is normally measured after the final floor and ceiling finishes are in, so a second measurement pass is part of the process rather than a problem.
Do I need to specify hardware myself?
No, but you do need to say what the hardware has to do — soft-close doors, pull-out corners, drawer zones, integrated lighting. Hardware is matched to that function, and matching it late changes both price and lead time.
Can finishes be changed after production starts?
Not without cost. Finish confirmation is a gate in the workflow: brief and proposal first, then quotation and detail confirmation, then production. Changes after that gate are re-orders of the affected parts.
Putting It Together
A good enquiry is not long — it is complete. Project type and destination, drawings or an honest statement that they do not exist yet, materials separated into construction and surface, quantities with phasing, delivery terms with site access, and the installation assumption. Send that and you can compare quotations line by line instead of comparing promises.
Send your drawings, room schedule and destination to SANTERSON for a specification review before the quotation round closes.