An L shaped corner wardrobe is one of the most space-efficient ways to dress a bedroom corner, and one of the easiest items to get wrong when it is made by a factory you have never met in person. The unit has to work with walls that are rarely square, a door swing that has to clear the bed, and an interior layout decided by how the household actually dresses. Most of the rework on these projects traces back to the first conversation, not the workshop. The brief below is what we ask buyers, designers and builders to send us at SANTERSON, and it is just as useful if you are vetting another supplier.

Start with the corner itself, not the look

Send a dimensioned sketch of the wall run on both sides of the corner, plus the total height available from finished floor to finished ceiling. Height matters more than people expect: a wardrobe that stops short of the ceiling leaves a dust-catching gap, while a full-height unit needs clearance above the door for the hinge or sliding track.

  • Length of each wall run, measured at floor level and again at head height.
  • Room depth at the corner, so we can confirm carcass depth rather than assume it.
  • Floor finish and skirting detail, because a built-in unit usually scribes around or removes the skirting.
  • Position of switches, sockets, radiators, radiator pipes, lights and air-conditioning outlets.
  • Whether walls are square — most are not, and out-of-square walls change how the corner carcass is built and packed out.

If the wardrobe shares a wall run with L shaped corner cabinetry in an open-plan suite, send that elevation too. We can align door profiles and finishes across both fit-outs so they read as one joinery package instead of two separate purchases.

State the door type before anything else

Door choice drives the internal layout, the clearance in front of the unit and the price. Tell us which you want, and tell us what is in front of the wardrobe that could block it.

Door typeWhat the manufacturer needs to know
Hinged doorsClear swing space in front of the unit, handle or integrated pull preference, and whether the door on the return leg can open without hitting the bed or a chest of drawers. See hinged door corner wardrobes.
Sliding doorsWall length available for the panels to stack, floor levelness, and whether a track recess is acceptable. See sliding door corner wardrobes.
Glass or mirrored frontsGlass type and tint, frame colour, and whether the mirror is on the door face or a separate panel.
Open or handlelessDust exposure in the room, profile of the recessed pull, and how the open bays sit relative to the closed ones.

Describe how the wardrobe will be used, not just how much hangs

"We need hanging space" is not a specification. A working brief lists what actually lives inside:

  • Long hanging for coats and dresses, and where the corner of the L should carry it.
  • Double-height hanging for one side, short hanging for the other, or a single rail across both legs.
  • Drawer count and whether drawers sit above or below the hanging rails — pull-out hampers are worth calling out early because they need their own carcass width.
  • Shelving for folded knitwear, plus shelf spacing you can actually keep tidy.
  • Lighting inside the unit: door-activated, motion-sensor or always on, and where the transformer can be reached for service.
  • Anything that has to be accommodated by name: an ironing board, a safe, a suitcase, a vacuum cleaner.

The corner of an L is the hardest bay to use well. Say plainly whether you want it as deep hanging, as open shelving that stays visible, or as a blind carcass fronted by drawers — and accept that the manufacturer may propose something different once they see the dimensions.

Name the finish, then ask for a sample

Finish language is where remote projects go sideways. "Grey" and "oak effect" mean different things to every factory. Specify the finish family and confirm the surface in person before production:

  • Matte acrylic fronts for a soft, low-glare door in rooms with strong daylight.
  • Wood grain melamine where you want a timber look that stands up to daily handling at a lower cost than veneer.
  • High gloss lacquer or two-tone combinations when the wardrobe is doing the decorative work in a minimal room.

Always ask for a physical sample of the door face and the carcass edge before you sign off. Screen colour, sheen level and how light catches the edge banding only read properly in your own room, at your own window.

Agree who measures, who installs and what arrives

This is the part of the brief that protects your programme. Settle it in writing:

  • Measurement. Confirm who takes the final on-site dimensions and when — after plastering and flooring are complete, not before.
  • Approval drawings. Ask for shop drawings showing elevations, internal layout and door clearances, and treat that sign-off as binding.
  • Packaging and delivery. For a unit crossing an ocean, ask how panels are protected, how the crate list is organised by room, and who handles customs clearance and last-mile delivery. SANTERSON's logistics and door-to-door delivery service covers freight forwarding, paperwork and container loading as part of the project scope.
  • Installation. State whether your own fitter installs from the drawings or whether site guidance is required from us. Our installation and after-sales support page describes on-site installation, inspection and snagging as part of the handover.
  • Spares. Order spare hinges, drawer runners and one replacement door panel with the original order. Matching a finish years later is far harder than holding a spare.

A good manufacturer will push back on at least one item in your brief — the corner bay layout, a door swing that clashes, or a finish that will not hold up where you have put it. Silence in reply is a warning sign, not efficiency.

Questions to answer before you request a quotation

Should the wardrobe be built to fit or made as standard modules?

Our corner wardrobes are made-to-measure: dimensions, layout and finish are specified per project. Standard modules are cheaper but leave gaps at an out-of-square corner. If your walls are old and uneven, made-to-measure with scribing is the safer route.

What drawings should I send?

A floor plan of the room, both elevations either side of the corner, and a note of every obstruction. If you have a 3D model or a designer's rendering, send it — but the dimensioned elevations are what we price from.

Can the wardrobe match my kitchen or vanity joinery?

Yes, if you tell us early. As a one-stop furniture and building materials supplier, we produce cabinetry, doors, wall panelling and wardrobes in the same workshop, so door profiles, veneers and lacquer colours can be carried across rooms on one project.

When should the wardrobe be ordered on site?

Order after first fix is complete and floor levels are confirmed, then have final dimensions taken. Build the wardrobe's lead time into your programme rather than treating it as the last item on the list.

Send us the wall elevations, a door preference and a short note on how the wardrobe will be used, and we will come back with a layout proposal and shop drawings you can approve before anything is cut. Talk to us through the contact page.