An open wardrobe that looks right in a rendering can still fail on site if the drawing never said how it is fixed to the wall, what the carcass is made of, or where the load line runs. A written specification is what closes that gap. Below is the field-by-field structure we use when preparing wall mounted open wardrobes for villa and apartment bedrooms, so that quotation, production and installation all read from the same document.
Why Open Wardrobes Need a More Detailed Specification Than Closed Ones
A closed wardrobe hides its internals behind doors. An open wardrobe does not: the frame, shelf edges, hanging rail and back panel are all visible from the bed side of the room, and there is no door to stiffen the carcass. That changes what has to be agreed before production.
Three things move to the top of the list:
- Dust and display. Everything stored is on show, so the mix of open shelf, hanging space and drawer has to be decided by habit, not left to a standard module.
- Edge quality. Every shelf edge is a visible line in the room. The material and edge treatment belong in the specification, not in a footnote.
- Wall support. With no floor cabinet taking the weight, the wall carries the load. Wall type, fixing method and allowable load must be stated in writing.
The Six Blocks Every Specification Should Contain
Our open wardrobe range is built to project-specific dimensions, with material and finish options and a layout tailored to each space. That flexibility only works if the following blocks are filled in.
1. Room context and access
Record the wall length and height available, the position of doors, skirting, sockets and light switches, and whether the wall is a party wall or a partition. Note the ceiling height as built, not as drawn on the architectural sheet — floor finishes are often laid after the drawing was issued.
2. Layout and internal zoning
State the number of hanging bays, shelf bays and drawer stacks, and give the hanging rail height for long garments separately from the height for short garments. Add whether any bay is intended for display rather than storage, since that changes shelf depth and lighting.
3. Materials and finish
Name the carcass board, the door-free front surfaces, the back panel thickness and the edge treatment. For bedroom fit-outs we work across laminate, lacquer, veneer and melamine finishes; state which one applies to this unit, and specify the colour or grain reference rather than a general description such as "light oak".
4. Wall fixing and load
This is the block most often left out. Specify the wall substrate, the fixing system, and who confirms that the wall can carry the loaded unit. Where a partition is too light for a fully loaded run, say so in the document and record the alternative — a reinforced backing panel, a stud-line batten, or a change of layout.
5. Tolerances and site interface
Give the allowable out-of-plumb and out-of-level on the wall, the scribe or filler allowance at each side, and how the unit meets skirting, cornice and floor finish. These are the details that decide whether the finished line reads straight.
6. Documentation and handover
List what is delivered with the unit: shop drawings for sign-off, a packing list keyed to each room or villa unit, installation sequence, and the contact for site queries. For multi-unit projects this list prevents one villa's hardware arriving in another's crate.
Specification Sheet: Fields to Fill In
| Block | Field | What "clear" looks like |
|---|---|---|
| Dimensions | Overall width / height / depth | Finished dimensions, stated as the range the wall allows plus the chosen size |
| Bay widths and shelf depths | Each bay dimensioned individually, not "as standard" | |
| Layout | Hanging rails | Count, length, and height for long and short garments |
| Shelves | Count, depth, spacing, and whether any are adjustable | |
| Drawers / trays | Count, runner type, and load rating where required | |
| Materials | Carcass board | Board type, thickness and surface |
| Fronts and edges | Finish name plus colour or grain reference; edge material and radius | |
| Back panel | Thickness, fixings, and whether it contributes to rigidity | |
| Wall support | Substrate and fixing | Wall type stated; fixing system named; load path described |
| Confirmation responsibility | Named party confirms wall capacity before production release | |
| Site interface | Tolerances | Permitted deviation on the wall; scribe allowance |
| Finishes meeting points | Skirting, cornice, floor finish and paint line | |
| Handover | Documents | Shop drawings, packing list, installation sequence, site contact |
Confirm dimensions and selected specifications for each project before production release. The sheet above is a structure, not a substitute for your own structural or building-code checks.
Reading the Same Sheet Against Other Open Configurations
The six blocks stay the same whichever open configuration you choose; only the entries change. A metal frame open wardrobe moves attention to the frame profile and how shelves seat into it. A glass open wardrobe adds glazing thickness, handling and fixing detail. A freestanding open wardrobe returns the load to the floor, so the wall block becomes an anchoring note instead of a structural question.
Where bedroom storage is combined with cabinetry elsewhere in the same project, it is worth specifying wardrobes, built-in kitchen cabinets and other built-in joinery on one schedule. One board list, one finish schedule and one set of shop drawings keeps the grain and edge detail consistent through the building.
How a Supplier Reads Your Specification Back
When a specification reaches us with those blocks complete, the next step is a drawing set rather than a guess. We return shop drawings for your sign-off, then move to production with the confirmed board, finish and fixing detail. Where a project needs bespoke finishes, prototyping or OEM arrangements, that work is agreed at the same stage, before tooling and long-lead boards are committed.
For projects abroad we handle packing, container loading and freight documentation for each villa unit or floor, so the on-site team can match crates to rooms. Assembled runs ship in sections sized to the site access route recorded in block one — a point that costs nothing to note early and is expensive to discover at a stairwell.
Before you send an enquiry: have the wall length and height, the substrate type, the number of hanging bays required, and the finish reference ready. Those four items turn a first reply from an estimate into a priced, buildable proposal.
Common Gaps We See in Received Specifications
- Height given as architectural, not as built. The unit arrives 15 mm short because the floor finish was added after the drawing.
- "Open shelving" with no bay breakdown. Production quotes a standard module; the client expected long-garment hanging across the full run.
- Finish named by look, not reference. Two projects specify "grey oak" and receive different boards.
- No wall substrate stated. The fixing detail cannot be designed, and installation stops on site pending a structural answer.
- Edge treatment omitted. Visible shelf edges are produced in the default detail, which does not match the design intent for a bedroom seen from the bed.
Each gap costs one round of questions at best and a re-made panel at worst. Filling the sheet once is cheaper than resolving them after release.
Send us your wardrobe schedule. Share the wall dimensions, substrate, layout requirements and finish reference for your villa or apartment project, and we will return shop drawings and a specification-based quotation. Contact SANTERSON to start the review.