A black high gloss kitchen is easy to specify badly. The finish you approve on a sample and the finish that arrives on site are often not the same panel, because the colour sits in a surface layer rather than through the board. That is also why this category takes longer to price than a plain melamine door: size, substrate, surface system, edge treatment and hardware all have to be settled before a number means anything. Here is the information we need from a project buyer to quote black high gloss cabinets, and what each item changes in the price.

1. The room itself: drawings, not photographs

A photograph shows the look you want. It does not show where the walls are. For made-to-measure cabinetry we need a scaled plan and two elevations, or a site survey covering:

  • Overall run lengths for base units, wall units and tall units, measured at three heights per wall because floors and ceilings are seldom level.
  • Floor-to-ceiling height, plus the position of any beam, soffit or duct that reduces cabinet height.
  • Window sill height and head height, door swing direction, and the location of radiators and pipework.
  • Positions of existing soil, water and gas lines, and whether they can be moved.
  • Appliance schedule with model numbers: oven, hob, extractor, refrigerator, dishwasher, wine cooler. Integrated appliances decide carcass widths before door sizes do.

If your drawings are still at concept stage, send them and mark what is provisional. We work from architectural and interior drawings on villa and apartment projects, and can return a layout proposal with 3D renderings before anything is cut.

2. Layout and storage plan

Tell us how the kitchen is used, not only how it looks. The working triangle — washing, preparing, cooking — sets the order of units, and internal fittings are priced per unit, so a drawer bank and a hinged cupboard with shelves carry different prices behind the same door.

  • Which walls carry worktop appliances, and whether you want an island or peninsula, including its dimensions and whether it houses seating.
  • Where tall units go for ovens and refrigeration. Our integrated appliance tall cabinets are configured around the appliance dimensions you provide, together with ventilation and electrical requirements.
  • Corner handling: lazy Susan, pull-out carousel or open shelving. Corners are where a quotation gets rewritten if this is left undecided.
  • Drawer counts and sizes, cutlery organisation, pantry racking, laundry or utility integration.
  • Whether display cabinets with internal lighting are required, and on which runs.

3. Substrate and surface system

"Black high gloss" describes a look, not a product. Different doors achieve it, at different prices and with different behaviour on site. Name the one you want, or send the sample and we will confirm what we make:

Surface systemWhat the supplier needs from you
High gloss lacquerBuilt up in coats and polished. Deep, mirror-like black; a slower process with a longer lead time.Colour reference (RAL or NCS code, or a physical sample), plus the sheen range you will accept for the batch.
High gloss acrylicA solid acrylic sheet laminated to the panel. Colour stays consistent across a long run; see high gloss acrylic cabinets.Panel size per door, since sheet sizes drive nesting and waste.
High gloss PVC or melamine foilWrapped film over a routed MDF core. Economical for repetitive apartment units; see high gloss PVC cabinets.Door thickness and profile — flat, or with a routed edge line.
High gloss veneer or wood effectGloss over a figured substrate, for projects that mix timber grain with black.Grain direction rule across the run: uniform or book-matched.

Also state the substrate you require or will accept: MDF, particleboard, plywood, or moisture-resistant board for wet zones such as under-sink units. Gloss black shows fingerprints and dust in every cut-out, so tell us whether the reverse of the door should match the front or stay a light standard colour — matching interiors cost more and are not always wanted.

4. Door style, edge detail and handle strategy

Gloss black exposes poor edge work, so the edge detail belongs in the enquiry rather than in a later email.

  • Flat slab or handleless profile. Handleless doors need routed pulls or a rail system, and the reveal at worktops and ceilings has to be dimensioned on the drawing — our handleless high gloss cabinets are built around that detail.
  • Edge banding colour and material, or a lacquered edge, and whether edges are square or slightly eased.
  • Door dimensions and weight. A tall gloss door on a fridge column may need adjusted hinges or a different carrier.
  • Whether a second finish appears in the same kitchen — a two tone high gloss scheme, or black gloss on the base run paired with black matte cabinets on the tall run. Both finishes have to appear in one bill of materials.
Ask for a physical door sample before you release a production order. Gloss black photographed on a phone usually reads lighter and bluer than the real panel, and swatch books from different surface systems do not match each other.

5. Hardware, worktops and lighting

Our custom built-in kitchen cabinets can be supplied with matching furniture hardware — cabinet hinges, drawer slide rails, support legs and connecting brackets. To price this part we need:

  • Hinge type, and whether soft-close applies to doors, drawers or both; give the brand or load rating if your specifier has already chosen one.
  • Drawer system: side-mount runners or undermount slides, box heights, and whether tall drawers carry internal dividers.
  • Worktop material and thickness, edge profile, sink cut-out type, hob cut-out and any upstand. Worktop thickness changes the scribe and plinth detail above the base units.
  • Integrated lighting: cabinet interiors, under-wall-unit strips, glass display lighting, and where transformers and switches sit. Specify voltage and whether dimming is required.
  • Backsplash or wall panel material, because it fixes wall unit depth in elevation.

6. Quantities, tolerances and site conditions

For multi-unit work — apartments, serviced apartments, hotel suites, villa groups — send the unit schedule with repeat counts. Repeat doors are nested together, so a schedule built on consistent sizes gives a better price than twelve one-off kitchens.

  • How many of each kitchen type, and which types repeat.
  • Tolerance allowed for on-site adjustment: fully adjustable scribes and plinths, or fixed trim cut to site dimensions.
  • Storage and delivery conditions at the site — lift dimensions, stair widths, and whether panels arrive flat-packed or as assembled carcasses.
  • Who installs. We supply installation guidance and on-site coordination where the project needs it; a local joinery team needs different packing and clearer setting-out drawings.

7. Commercial and logistics information

This is the block buyers leave out, and it delays firm quotations more than any technical gap:

  • Destination port or site address, and your preferred Incoterms.
  • Required delivery window, and whether the order arrives in one shipment or staged by floor or phase.
  • Import documents you need: commercial invoice, packing list, certificate of origin.
  • Payment terms and the approval sequence — sample door first, then drawings, then production release.
  • A budget band per kitchen. It lets us propose a surface system that fits the budget instead of quoting one option and losing the project on price.

As a China-based furniture and building materials manufacturer working on villa, apartment and hospitality projects, we supply this category as part of a wider fit-out — cabinetry alongside interior fixtures, flooring, wall panels, doors and lighting. Putting those trades with one supplier reduces the interface problems that appear when gloss doors arrive before the walls are finished.

Before you send the enquiry

Check that one message carries: scaled plan and elevations with levels; appliance schedule with model numbers; chosen surface system and colour reference; door style and handle strategy; hardware specification; worktop and lighting details; unit quantities and repeat pattern; site access conditions; destination and Incoterms; and your target delivery window. With those items together, a supplier can return a priced layout proposal instead of a list of questions.

Send us your drawings for a quotation

Share your kitchen plan, appliance schedule and finish reference, and we will return a made-to-measure proposal for black high gloss cabinetry — doors, carcasses, hardware and matching interior fixtures in one package.

Contact us to start the enquiry.