A sliding panel TV system looks simple on a rendering and complicated on site. Panels have to slide smoothly, conceal a screen and its wiring, sit flush with surrounding joinery, and still allow access for maintenance. That is exactly why specifiers and buyers ask for a product submittal before an order is released. A submittal is the pack of drawings, schedules and confirmations that turns a design intent into something a factory can build and an installer can fix to the wall. Below is what we recommend you require from any supplier of these systems, using Santerson Sliding Panel TV Systems as the reference product.

Practical point: sliding panel TV systems and related wall systems are made to measure. Finish, layout and dimensions are specified per project, so a submittal is never a generic datasheet download — it has to be generated from your drawings and confirmed by you before production starts.

1. Dimensioned elevations and plans

The core of the submittal is a set of dimensioned drawings, not a photograph. Ask for:

  • Front elevation of the whole wall, with overall width and height, panel widths, and the finished floor level as a datum;
  • Plan section showing wall build-up, projection from the finished wall face, and clearance for panel travel;
  • Opening position for the screen: centre line, rough opening size, and the depth available behind the finish face;
  • Panel stack positions in both the closed and open state, so you can check sightlines and circulation;
  • Setting-out dimensions from at least two fixed reference points on site.

If the system sits next to full height media walls, storage or closet sliding panels, request a combined elevation rather than separate sheets. Junctions between systems are where tolerances show up.

2. Panel material and finish schedule

State the make-up of each panel face in a table the purchasing team can price and the site team can check on delivery. A workable schedule lists, per panel type:

ItemWhat to confirm
SubstrateBoard type and thickness, moisture resistance where the wall backs onto a wet area
FinishWood veneer, lacquer, matte or high gloss laminate, glass, textured surface, stone or marble look — matched to the project finish schedule by name and code
Edge and profileEdge treatment, shadow gaps, any decorative aluminium or stainless steel trim
Grain directionVertical or horizontal grain, and which panels mirror each other
Sample referencePhysical sample or swatch number approved before production

Where the design continues the same language across the room, note the matching items — textured panels, matte lacquer panels or acoustic sliding panels — in the same schedule so one batch covers all of them.

3. Sliding mechanism and hardware specification

This is the section most often left blank, and it causes the most rework. The submittal should name:

  • Track type and mounting method — top-hung or floor-guided, and whether the track is structural, timber-borne or set into a prepared steel header;
  • Roller and hanger specification, including the rated load per panel and the maximum panel weight the hardware supports;
  • Panel thickness and hanging detail, plus how the panels locate vertically (floor guide, ceiling guide or both);
  • Stop positions, soft-close or catch details, and the handle or recessed pull arrangement;
  • Whether the mechanism is supplied by the same vendor as the panels. Split supply is a common source of warranty disputes.

Give the supplier the panel weight you expect, not an assumption. If the finish is stone or thick glass, say so at this stage — it changes both hardware and subframe design.

4. Screen, services and access provisions

A media wall is an electrical assembly as much as a joinery item. Include in the submittal:

  • Screen type, size and mounting solution (fixed bracket, tilt or full-motion arm), plus the load path into the wall;
  • Cable routes, trunking or conduit positions, and where back boxes sit relative to panel travel;
  • Power, data and device locations behind the panels, with a note on how devices are reached when panels are closed;
  • Ventilation requirement for any equipment housed in the cavity, and the position of vents or grilles;
  • Any integrated lighting — LED strips, display niches or backlit feature walls — with driver location and access for replacement.

Confirm who supplies the low-voltage work and who terminates it. On villa and apartment packages this is often a separate trade, and the interface needs to be recorded in writing.

5. Substrate, tolerance and site conditions

Sliding systems fail on site for boring reasons: walls out of plumb, floor levels off, blocking missing. The submittal should state what the supplier needs from the builder:

  • Wall flatness and plumb tolerance across the run, and the packing allowance;
  • Timber or steel blocking / nailing zones shown on the drawings at fixing points;
  • Floor finish build-up, so the threshold and floor guide are set to the correct level;
  • Room humidity and whether the wall backs onto a bathroom, pool or external envelope;
  • Access route for delivery — panel length and weight against lift, stair and door sizes.

Ask the supplier to confirm they will site-survey before releasing production, or to state their setting-out responsibility clearly in the quotation. On a coordinated package, design coordination and on-site guidance are where these checks get closed out rather than discovered on installation day.

6. Packaging, shipping and delivery documentation

For imported fit-out, the submittal should be joined by logistics paperwork so goods arrive complete and identifiable:

  • Packing list keyed to panel marks on the drawings, not just "10 crates";
  • Packaging method for glass or high-gloss faces, and corner protection for long panels;
  • Commercial invoice, packing list and certificate of origin as required for import clearance;
  • Container loading plan if the wall system ships with other joinery, flooring or interior fixtures in one consignment;
  • Delivery address, dock conditions and the receiving contact.

Where a project needs several wall systems delivered in stages, say so in the submittal cover sheet. Phased despatch avoids panels arriving before the substrate is ready.

7. Installation, handover and after-sales record

Close the submittal with what happens after delivery:

  • Installation method statement and fixing sequence;
  • Snag and inspection list to be signed off at handover;
  • Warranty terms, what they cover and what voids them, including hardware;
  • Spare parts availability for rollers, tracks and handles, with lead times stated in writing;
  • Maintenance guidance for the selected finish.

Keep the approved submittal as a project record. It is the document you refer back to when a hardware part needs replacing years later, or when a second apartment in the same development repeats the detail.

A short checklist before you release the order

CheckStatus to confirm
Drawings signed by the designer or clientRevision number and date recorded on the submittal
Finish samples approvedSample codes match the production order
Panel weights knownHardware rated above actual weight
Screen and devices confirmedModel, size, bracket and access route agreed
Builder responsibilities listedBlocking, levels and tolerances accepted in writing
Delivery and install sequence agreedDates, marks and site access confirmed

Anything left open in the submittal becomes a variation on site. Closing these six items before release is far cheaper than re-manufacturing a panel that no longer fits.

Send us your drawings

As a China-based furniture and building materials manufacturer, SANTERSON produces sliding panel TV systems, media walls, storage walls and matching joinery to project dimensions. Send the room elevation, your finish schedule and the screen you intend to mount, and we will return a submittal pack covering dimensions, materials, hardware and services for your review before production begins.