An outdoor swim spa is one of the highest-value amenities a hotel, resort or serviced-apartment project can add — and one of the easiest to get wrong. It arrives as a fully engineered vessel with pumps, jets, controls and an electrical load, so it touches structural, mechanical, electrical and landscape packages at once. This guide walks through how procurement teams specify, price and sequence the Outdoor Swim Spa WS-PC06ST on a hospitality project, from first site survey to handover.

Why This Swim Spa Size Suits Hospitality Sites Better Than a Pool

Guests increasingly look for water features they can use in a short session and outside peak pool hours, not only a large pool they may never enter. A swim spa provides a continuous current for lap-style exercise at one end and a jetted hydrotherapy zone at the other, in a footprint far smaller than a swimming pool. For a hotel with limited terrace, rooftop or garden area, that trade-off is decisive: you gain an amenity that photographs well, supports wellness programming, and arrives as a factory-built vessel rather than a civil pool structure.

For operators, the smaller water volume also means lower heat-up demand than a full pool and a more contained maintenance routine — factors that show up in the annual operating budget rather than only at opening. Exact running costs depend on insulation level, heat pump selection and local tariffs, so ask for those figures against your chosen configuration.

Reading the Specification Sheet Before You Request a Quotation

The most common procurement failure on swim spa projects is a request-for-quotation that quotes only the model name. Suppliers then price different equipment sets, and comparison becomes impossible. Start by fixing the dimensions and the equipment list in your RFQ document.

The catalogue data for WS-PC06ST lists the vessel at 5900 × 2400 × 1470 mm, with one control system, one swim training system, one filter pump, six jets and four LED lights, at a total power figure of 6.55 kW. Treat these catalogue values as a starting point for coordination, not as final: included equipment and electrical requirements vary with the configuration you select, so every number must be reconfirmed in writing against your chosen build before any concrete is poured or any sub-base is built.

Specification itemCatalogue valueProcurement action
Vessel dimensions5900 × 2400 × 1470 mmConfirm against site survey; check clearance for access, plant and maintenance reach
Control system1 setSpecify control location and weather protection with the electrical contractor
Swim training system1 setConfirm current output and mounting detail for guest-use programming
Filter pump1 pcAgree filtration run hours and access panel location
Jets6 pcsConfirm jet layout against seating positions in the design intent drawing
LED lights4Agree colour mode and control grouping with lighting designer
Total power6.55 kWHand to the electrical engineer early; confirm supply, protection and earthing locally
Listed featuresWater jets, LED lighting, Ozone, Swim training systemState clearly which are standard and which are optional in the quotation
Verification note: catalogue accessories for this range can include control systems, UV sterilisation, water pumps, heat pumps, sand filtration, insulation and steps. Availability and compatibility vary by model. Require the supplier to confirm each option for your configuration before you lock the price.

Confirming Site Conditions Before the Order Is Placed

Once dimensions are fixed, three site questions decide whether the project runs on schedule:

  • Structure and loading. A filled vessel of this size is a heavy point load. On rooftops, podium decks and upper terraces, hand the dimension sheet to the structural engineer before the layout is frozen, not after.
  • Electrical provision. The power figure drives cable sizing, distribution board space and protection devices. If your local supply differs from the configuration the equipment was built for, that has to be resolved at quotation stage.
  • Access and lifting. A 5.9 m shell needs a delivery route, a crane or a lift path, and a working area. Confirm this with the contractor before the vessel arrives, because retrofitting access after the landscape package is installed is expensive.

A practical rule for hospitality teams: do not release the purchase order until the structural engineer, electrical engineer and landscape contractor have all signed the same dimension sheet. That single step removes most of the coordination delays seen on swim spa installations.

Specifying Within a Larger Project Package

On hospitality projects, the swim spa is rarely bought alone. It sits beside poolside loungers, cabana daybeds, outdoor dining sets and shade structures, all exposed to the same sun, chlorine and salt air, and it shares a programme with the guest-room and spa fit-out behind it. Buying these as one package with a single accountable supplier reduces finish mismatches and consolidates shipping, inspections and warranty handling.

SANTERSON works as a one-stop furniture and building materials supplier, covering the water feature alongside swimming pools and swim spas and the surrounding hospitality project furnishing package, from poolside loungers to guest-room fit-out. For a hospitality owner, that means one specification document set, one production schedule and one delivery window instead of a dozen uncoordinated vendors.

Where customisation actually matters

Cabinet cladding, step configuration and insulation level are the items most often changed for hospitality installations, because they determine how the vessel reads against the architecture and how much heat it holds overnight. Where a project needs bespoke finishes or branded detailing elsewhere in the package, custom furniture design and prototyping services cover material and finish selection before production begins — worth using rather than accepting standard cabinetry in visible guest-facing areas.

Logistics, Installation and Handover

For international projects, the supplier's logistics scope should be written into the same contract as the product. Freight by sea, air or rail, customs paperwork, packaging and container loading, shipment tracking and door-to-door delivery are all services SANTERSON lists; confirm Incoterms, insurance and the exact delivery point for your site case by case, since import terms and duties differ by country.

At the site end, ask for a defined commissioning sequence: positioning and levelling, connection to power and filtration, jet and control testing, water chemistry briefing for the operations team, and a snag list signed at handover. Installation and after-sales support, including inspection and spare parts, should be agreed in the contract with named deliverables — not left as a verbal promise.

A Procurement Checklist for Your RFQ

  • Confirmed model and dimension sheet, signed by your structural engineer
  • Explicit list of standard versus optional equipment for the selected configuration
  • Electrical requirements stated in writing and checked against local supply
  • Cabinet finish, insulation level and step configuration specified
  • Delivery point, Incoterms and insurance agreed
  • Commissioning steps and snag process written into the contract
  • Spare parts and warranty terms listed with named scope and exclusions

Send that checklist to two or three suppliers and you will get comparable quotations. Send only a model name, and you will get three different products at three different prices.

Planning a swim spa for a hotel, resort or villa project?

Send SANTERSON your site dimensions, target configuration and delivery location, and we will confirm the equipment set, power requirements and logistics plan for WS-PC06ST as part of a single project package. Contact us to start the specification.