A toilet that arrives on site without a confirmed rough-in is the most expensive line item in a bathroom bill of quantities. Below is how we ask buyers, contractors and designers to specify our Washdown One Piece Toilet 1004A so that the fixture, the plumbing and the finish schedule all agree before production starts.

Why the specification has to be written down

In villa, hotel and apartment projects, sanitary ware is usually ordered months before the waste pipes are laid. If the requisition only says "one-piece close-coupled WC", three different things can be delivered against that line: a floor-standing unit with a wall outlet, a floor-standing unit with a floor outlet, or a wall-hung pan on a concealed frame. Each needs a different trap and a different rough-in distance.

A written specification removes that guesswork. It also lets us quote the right carton quantity, plan the mixed container load, and flag any finish deviation early rather than after the mould run has been scheduled.

Section 1 — Model and form factor

State the model code exactly as it appears on the drawing: 1004A. Then record the construction type. The 1004A is a one-piece unit, meaning the cistern and pan are cast as a single body rather than bolted together in two sections.

That single-body structure matters on site. There is no joint between tank and bowl for dirt, limescale or bacteria to collect in, which is why one-piece pans are often specified for guest bathrooms and commercial restrooms where housekeeping turns over a large number of rooms on a fixed schedule.

For comparison, if the drawing calls for a wall-hung pan with the floor left clear, that is a different product family — see Wall Hung Toilet 1038W, which uses a concealed tank and P-trap wall drainage. If the budget line requires a two-piece construction, Two Piece Washdown Toilet 1038A covers S-trap and P-trap options as well.

Section 2 — Drainage type and rough-in dimension

This is the field that cannot be left blank. The 1004A supports two plumbing arrangements:

Drainage typeRough-inPipe location
P-trap180 mmWaste outlet in the wall behind the pan
S-trap250 mmWaste outlet through the floor

Write down which one applies, and write it against the setting-out drawing rather than a generic note. On renovation jobs the existing outlet is already fixed; on new builds the choice should be made together with the plumber, because the trap type changes the wall build-up, the boxing and in some cases the position of the vanity.

Before you sign off: measure the finished-wall-to-centre distance on the setting-out drawing, not the structural wall. Tile thickness and waterproofing change the number.

Section 3 — Flush type

The 1004A uses a washdown flushing action: the flush sweeps water across the pan surface into the trapway. When you record the flush type on the requisition, also note whether the project requires a single-flush or dual-flush cistern arrangement for that particular market, and confirm the water pressure range of the supply at the fixture.

If your project has a defined water-efficiency target, put that target in the specification text and ask us to confirm the matching configuration. We would rather answer that question at quotation stage than during a site inspection.

Section 4 — Material and surface

The body is vitreous ceramic with a dense, glossy glaze. In specification language this translates into three practical requirements worth stating:

  • Glaze coverage. Specify that the glaze runs inside the trapway as well as on visible surfaces, since an unglazed trapway is where staining begins.
  • Colour and sheen. Most orders are white gloss. If the finish schedule calls for a colour or a matt surface, list it per room type so we know where the deviation applies.
  • Cleaning regime. Note the detergents housekeeping intends to use. Abrasive powders and strong acid cleaners damage glaze over time, and that damage shows up as grey tracking within a year of handover.

Section 5 — Shape and how it sits in the room

The 1004A has a square silhouette with softened corners, which suits contemporary bathrooms where the vanity, basin and shower enclosure all run on straight lines. Two practical points when you place it on a layout:

  • Check clearance from the pan to the nearest vanity or partition — tight clearances are the most common complaint at handover in small guest WCs.
  • Confirm the cistern does not clash with a niche, a towel rail or a wall-hung basin's supply pipework.

Section 6 — Quantity, packaging and site handling

Give quantities by room type rather than one lump figure: for example, "1004A, P-trap, white gloss — guest bathrooms" as its own line. That way a substitution on one floor does not silently change the whole order.

Ask for the carton dimensions and gross weight with the quotation. On upper-floor installations this determines whether the cartons can go through the service lift or need to be carried, and it lets the builder plan storage without stacking pans in the yard.

Section 7 — What we confirm back

Once your specification reaches us, our quotation should return the following in writing. If any of these are missing from a supplier's offer, ask for them:

  • Model code and drainage type with the rough-in figure restated
  • Unit price, carton quantity and total carton count
  • Packaging specification and container loading plan
  • Lead time from deposit to shipment
  • Spare-parts availability for flush mechanisms on the same model

The 1004A listing on our site carries the description above, but dimensions and plumbing rough-in should always be checked against the current technical data sheet for your order. We send that sheet with the quotation — request it before you issue the purchase order.

Ordering as part of a wider bathroom package

Most projects do not buy WCs on their own. If the same fit-out also needs basins, shower systems and vanity units, group them in one requisition so the ceramics, the tapware heights and the tiling set-out are decided together. Our Bathroom Sanitary Fixtures range covers wall-hung and freestanding basins, bidets and WCs in matching ceramic bodies, and we support bulk wholesale and project customisation across the range.

For projects that combine sanitary ware with cabinetry, flooring and lighting under one procurement package, our Custom & OEM Service covers bespoke finishes and flexible order quantities, and Logistics & Door-to-Door Delivery handles the freight documentation to site.

A short specification template you can copy

FieldEntry for 1004A
ModelWashdown One Piece Toilet 1004A
ConstructionOne-piece vitreous ceramic, integrated cistern and pan
Flush typeWashdown — confirm single or dual flush per market
DrainageP-trap 180 mm wall outlet or S-trap 250 mm floor outlet (select one)
FinishWhite gloss glaze, glazed trapway (state deviation if any)
ApplicationResidential, villa, hotel, commercial restroom refurbishment
Quantity by room type_________________________
Delivery terms and destination_________________________
Send the completed line list, the setting-out drawing and the target delivery port to our project team, and we will return a quotation with the technical data sheet attached. Contact: https://www.santerson.com/contact/