A set of classic folding doors can travel a long way before it reaches the opening it was made for — factory floor, container, port, warehouse, and finally the site where the installer unpacks it. Buyers who order made-to-measure joinery from overseas often find that the doors themselves are correct, while the way they arrived causes the trouble: a warped leaf, a chipped edge on a panel, hardware loose in the same carton as a door, or no way to tell which bundle belongs to which opening. The questions below are the ones worth putting to your supplier before production starts, not after the container lands.

Start With What Is Actually Being Shipped

Our Classic Folding Doors are made to measure for each project, with the finish, layout and dimensions specified per opening. That same flexibility applies to how the order is packed and delivered: Furniture Logistics and Door-to-door Delivery covers freight forwarding by sea, air and rail, customs paperwork, packaging and container loading, shipment tracking and door-to-door delivery. What a given order needs depends on the site, so confirm the details rather than assuming a standard box.

Ask your supplier to state, in writing, how the doors will be separated for transport. Folding doors are usually shipped as individual leaves or as pre-assembled panels with their hinges and pivot hardware attached, and the two approaches protect the product differently. Loose hardware travelling against a finished face is one of the most common sources of visible damage, so it should be boxed or bagged separately and fixed inside the carton.

Confirm the Protection Details, Not Just "Export Packing"

"Export packing" means nothing on its own. Ask what each layer is, and ask for photographs of a packed set before the goods are loaded. Useful specifics include:

  • Face protection. Whether finished faces are separated by protective sheeting, and whether edges and corners get additional protection — panel edges and any glass are where damage shows first.
  • Rigidity. Whether doors ride flat on a pallet or stand upright in a crate, and whether the crate is strong enough to be stacked. Ask what may be stacked on top of your crates if they share a container with other goods.
  • Moisture. Sea freight moves through temperature swings that produce condensation inside a container. Confirm how the packing guards against moisture on timber and board components, and ask whether the leaves are kept off the container floor.
  • Marking. Each bundle should carry an identifier that matches your opening schedule or drawing numbers, so the site team knows which set goes where without unpacking everything.
  • Paperwork. The packing list should itemise contents by crate, including where hardware, tracks and thresholds are packed. Commercial invoices, packing lists, certificates of origin and import permits form part of the documentation handled with the shipment.

Ask for the packing method to be described on the quotation itself. A line item that says only "packing" gives you nothing to compare against when goods arrive damaged.

Agree How Shared Containers Are Handled

Project buyers rarely order doors alone. A villa or apartment fit-out typically combines joinery, wall panel systems, vanities and lighting in one consignment, which is where consolidated container loading becomes a real decision rather than a formality. Confirm who is planning the load, and how fragile items are positioned relative to heavy cabinetry. If you are consolidating with other suppliers' goods, ask whether your crates are loaded last and unloaded first.

If part of the order is time-critical — for example, doors needed before a wet-trade package — say so when confirming packing, because it changes how the load is arranged and sometimes whether part of the shipment moves by air instead of sea.

Set the Inspection Point Before Unloading

Decide in advance who inspects, and where. Photograph crates before they are opened, and check external damage on each one while the container is still at the delivery point. If a crate arrives crushed, note it on the delivery paperwork at that moment; a claim raised days later, after the packing has been discarded, is much harder to pursue. Keep the outer packing of any damaged set until the supplier has seen photographs.

Then check contents against the packing list crate by crate, and confirm each set against its marked opening before the installer commits to fitting it. Made-to-measure folding doors should be checked for square and for smooth folding while still on the ground, where they can be handled by two people rather than in an opening.

What to Put in Writing Before Production

A short list to send with your purchase order

Packing method per item type, described on the quotation. Photographs of packed goods before loading. Hardware packed separately and secured. Crate marking that matches your opening schedule. A packing list itemised by crate. Load plan for shared containers. Named contact for logistics questions during transit. Your inspection procedure at the delivery point, agreed with everyone receiving the goods.

SANTERSON works as a furniture and building materials supplier covering design consultation, manufacturing, project coordination, logistics and on-site support, so packing questions can be settled with the same team that produced the doors rather than through a separate freight agent. As always, confirm dimensions and selected specifications for each project before production begins, and keep the confirmed packing details attached to the order.

Send your opening schedule and the destination site, and ask for the packing method and delivery terms to be quoted together — that single document is what you will refer back to if something arrives wrong.