Why a Written Specification Matters Before Production Starts

Two tone matte cabinets look simple on a mood board: one matte colour here, another there, flat fronts, clean lines. The difficulty appears when that image has to become a quotation, a shop drawing and a set of panels that arrive on site fitting the room. Most disputes over two tone kitchens are not about taste. They are about specification gaps — a missing dimension, an undefined edge, a door finish assumed rather than written down.

A product specification is the document that closes those gaps. It records what you are buying in terms a factory can price and build without guessing: sizes, finishes, panel construction, hardware, layout and the tolerances that apply on site. When it is complete, the quotation you approve and the cabinets you receive describe the same thing. When it is thin, changes surface as variations after production has started.

Our Two Tone Matte Cabinets are made-to-measure and sit within our matte finish kitchen cabinet collection, so dimensions, layout and finish combinations are set per project rather than chosen from a fixed size list. That flexibility is exactly why the specification has to be precise: every variable you leave open is a variable somebody else will decide for you.

The Six Blocks Every Two Tone Cabinet Specification Needs

Work through the six blocks below in order. Each one answers a question the factory would otherwise have to ask, and each one is where two tone projects most often go wrong.

1. Layout and measured dimensions

Start with a drawing of the wall elevations, not a floor plan alone. Cabinets are built against vertical surfaces, so the drawing should show each run with its overall width and height, the position of windows, sockets, switches, extract ducting, radiators and any pipework that passes behind the carcass. Note floor levels if the slab is uneven — a 15 mm fall across a run changes scribe widths and door alignment.

  • Overall run lengths and heights, taken at several points along each wall rather than one.
  • Ceiling height at both ends of any tall unit, since ceilings are rarely level.
  • Appliance schedule with published dimensions for every built-in oven, hob, dishwasher, fridge and wine cooler you intend to house.
  • Clearances needed for door swing, drawer pull-out and adjacent traffic routes.

2. Which surfaces get which colour

"Two tone" describes a combination, not a rule. State the pairing by name or reference for each element, and say explicitly what is excluded. A specification line that reads "base units in finish A, wall units and tall housing in finish B, no colour change on internal surfaces" removes three questions at once.

  • Name both finishes and give a physical sample reference or supplier code for each.
  • Identify which elements take which finish: base doors, drawer fronts, wall doors, tall housing panels, open shelving, end panels.
  • Decide the return. Do side panels matching the door finish wrap to visible ends, or do they stop at the reveal?
  • Confirm internal colour and whether it matches the exterior, is a standard neutral, or is specified separately.

3. Door panel construction and edge detail

Matte fronts read as flat and uninterrupted, so the small details carry the look. Specify the panel profile — a plain flat slab, a shallow shaker rebate, or a routed groove — and how edges are finished. Edge banding colour, seam visibility and radius all affect how the two tones meet at a corner or where a tall unit butts into a run of base units.

4. Hardware and opening method

Hardware is part of the appearance, not an afterthought. If you want a handleless look, say how the door opens: a routed pull channel, a profile rail, or a push mechanism. Each has different finger clearance and different reveal dimensions, and the reveal should be consistent across both colour zones. Then list hinges, soft-close runners, drawer boxes and any integrated lighting by type and quantity.

Where a handleless detail is central to the design, Handleless Matte Cabinets in the same collection use the same matte door family with a different opening detail, which keeps one specification consistent across two appearance requirements.

5. Interior configuration and storage

Fix the inside before drawings are signed off. Specify shelf positions and load ratings for anything heavy, drawer counts by width, tall-unit pull-out larder sets, corner solutions, bin housings and any cutlery or utensil organisation. Interior decisions drive carcass depths and back panel fixings, so changing them after production begins is expensive.

6. Site interface and installation sequence

Record what the cabinets meet: worktop material and thickness, splashback or tiling zone, skirting to be removed, plaster completion levels, flooring laid before or after installation, and who sets out the services. Then state the delivery sequence — when carcasses, doors, worktops and appliances each need to be on site. A two tone kitchen ordered as one package but installed in three stages still needs those dates written down.

Specification Table You Can Copy Into an Enquiry

Fill this table out and send it with your drawings. Any cell you leave blank is a cell the supplier will fill for you.

ItemWhat to write
Project and roomAddress, room name, contact, required site date
ElevationsEach run with widths and heights; ceiling levels at both ends; obstructions noted
Finish A / Finish BNamed finish or sample code for each tone, plus which elements take each
Panel profileFlat slab, shaker, routed detail; edge treatment and reveal width
CarcassDepth and height per unit type; back panel type; internal colour
HardwareHinges, runners, handle method, integrated lighting — by type and quantity
InteriorShelves, drawers, larder sets, corner units, waste separation
AppliancesModel list with published dimensions and required ventilation
Site conditionsFloor level tolerance, plaster and tiling levels, worktop thickness, services position
Delivery and installPackage breakdown, on-site dates, who performs installation

How a Made-to-Measure Supplier Uses Your Specification

With non-standard sizing there is no catalogue to fall back on, so the specification becomes the production brief. At SANTERSON, enquiries move from your drawings and requirement list into design and planning, then into production with confirmed details before shipment. Our custom and OEM service covers bespoke finishes, textures and panel details, which is where a two tone scheme with an unusual pairing or a specific reveal width is resolved.

For projects that need more than one trade coordinated — cabinetry alongside wall panels, flooring, doors or joinery elsewhere in the property — Turnkey Solutions describes how design, production, logistics and site coordination are handled as a single package. That matters on villa and hospitality work, where the same two tones reappear in wardrobes, media units and vanities, and inconsistency between rooms becomes visible immediately.

One practical note: order physical samples of both tones before you sign drawings. Matte surfaces shift noticeably under warm and cool lighting, and two finishes that read well side by side on a screen can compete once they are next to each other on the same wall.

Related Finishes in the Same Collection

If you are comparing tones rather than committing to one pairing, these pages show how matte fronts behave in single-colour applications, which makes it easier to judge where the second tone should sit:

Before You Send the Enquiry: A Short Check

  • Every elevation is drawn with dimensions taken at multiple points, not one measurement per wall.
  • Both tones are named or sample-referenced, and each element is assigned to one of them.
  • Panel profile, edge treatment and reveal width are stated once and applied consistently.
  • The opening method is fixed, including how handleless doors are pulled at both colour zones.
  • Appliance models are listed with published dimensions and ventilation needs.
  • Site interface responsibilities — plaster, tiling, flooring, worktops, services — are named.
  • Delivery stages and required on-site dates are written into the enquiry.

A specification that answers these points up front is what allows a made-to-measure quotation to be compared honestly between suppliers, because each one prices the same product. If you have drawings ready, send them with the completed table and we will confirm dimensions and selected specifications for your project before production.