Cabinet doors and carcases are usually finished long before anyone thinks about how they travel. For matte pvc cabinets, though, packaging is part of the product specification. A wrapped panel that arrives with a scuffed edge or a pressure dent cannot be put back on a site schedule, and the finish in question shows handling marks far more readily than a high-gloss surface does. The questions below are the ones worth putting to your supplier before the cabinets leave the factory, not after.

Packaging details change between collections and projects. Treat every item here as something to confirm in writing against your own order — carton build, protection method, panel schedule and replacement terms — rather than as a fixed specification.

Why a matte PVC surface behaves differently in transit

A wrapped foil or laminated surface is thin, hard and unforgiving. Abrasion across the face — the kind produced when two panels slide against each other inside a carton during ocean handling — leaves a patch that catches light differently from the surrounding area. Indentation is the second failure mode: a corner resting on a pallet stringer, or a strap tightened directly onto a door face, can print a mark into the panel that no amount of steaming or polishing removes.

Direction matters as well. On a wood-grain PVC wrap, a scuff running with the grain is easy to miss; the same scuff across the grain reads as a streak. That is why the direction panels are stacked and interleaved inside each carton is a specification point, not a packing-house habit.

Ask for the packing method in writing

Before production starts, request the packing plan for your specific order and check that it covers the following. If the supplier cannot describe it, that is useful information in itself.

  • Panel-level protection. What separates each door and carcase panel — foam sheet, corrugated board, corner protectors, edge strips — and is it applied to both faces?
  • Carton build. Board grade and thickness, whether cartons are flat-packed or partly assembled, and how glass-front or heavy drawer units are separated from doors.
  • Stacking inside the carton. Panel orientation, interleaving, and whether wrapped edges face each other.
  • Container loading. Who loads, whether straps contact finished faces, and whether cartons are braced against shifting on a multi-week sea leg.
  • Marking. Carton numbers that match the panel schedule, so the site team can find a specific unit without opening everything.

SANTERSON's logistics and door-to-door delivery service covers packaging and container loading alongside freight forwarding and customs paperwork, so the packing plan can be agreed as part of the same order rather than arranged with a third party.

Match the carton numbering to the panel schedule

Custom cabinetry arrives as a set of parts, not as a shopping list. A made-to-measure kitchen is only complete when every carcase, door, shelf and plinth is present, which means the packing list has to speak the same language as the shop drawings.

Confirm that each carton carries a number tied to a panel schedule that references your drawing item numbers, and that the schedule states quantities per carton. On site this converts into a five-minute check at offloading instead of an afternoon of opened boxes — and if one carton is damaged in transit, you know exactly which panels are inside it.

Decide who inspects, and when

Photograph cartons before they leave the container and again at your door, note any damaged carton numbers on the delivery paperwork, and open panels in a dry, clean area rather than beside an unfinished wall. Matte surfaces reveal damage under raking light, so inspect with a lamp held low across the face instead of straight on.

Then agree the reporting route before you need it. The order should state who to contact, what evidence to send, and what happens next — replacement panel, replacement carton, or credit. Installation and after-sales support includes inspection and snags alongside on-site fitting; the practical point is that warranty terms, response times and exclusions should be read in your own contract rather than assumed from marketing copy.

What to put in the purchase order

Point to confirmWhy it matters for a matte PVC finish
Packing plan and materialsFixes how faces and edges are protected before production, not after
Panel schedule with carton numbersLets you verify completeness at offloading and identify a damaged carton's contents
Loading method and bracingPrevents shifting and strap marks on a long sea leg
Cargo insurance optionDecides who carries the loss if cartons arrive damaged — confirm the cover you are buying
Replacement terms for finish damageA replacement panel has to match the batch, so timing matters
Storage guidance at destinationCartons stored flat, dry and off the ground avoid damage that never came from the factory

Two of these are easy to overlook. Insurance is a choice you make when ordering, not a given; and a replacement panel for a matte PVC wrap has to come from the same batch, so an undocumented claim can turn a cosmetic problem into a schedule problem.

If your project includes outdoor or wet-area cabinetry

Cabinetry specified for a terrace, poolside bar or laundry area is packed and handled under the same rules but inspected more carefully, because it will be assembled in an environment where moisture and dust are present. Outdoor ready PVC cabinets and other designs in the same collection are made to project dimensions with selectable finishes, so confirm both the packing plan and the storage instructions for your site conditions.

Where a whole apartment or villa fit-out is involved, coordinating cabinetry with interior fixtures in one shipment reduces the number of separate consignments to inspect — and reduces the number of suppliers pointing at each other when something arrives damaged.

Before you order: a short checklist

  • Request the packing plan for your order and read it against the finish you have specified.
  • Ask how faces, edges and corners are protected, and whether glass or heavy units travel separately.
  • Require a panel schedule whose carton numbers tie to your drawing item numbers.
  • Confirm loading method, bracing and whether straps touch finished faces.
  • Decide on cargo insurance at the point of ordering and record what is covered.
  • Agree in writing who inspects, what evidence is required, and how finish damage is replaced.
  • Check destination storage: flat, dry, off the ground, cartons unopened until fitting.

Packaging is not a detail to settle after the cabinets are built. For matte pvc cabinets it decides whether the finish you specified is the finish that arrives, and settling it in writing costs nothing while production has not started.