A wardrobe submittal is the document pack a contractor, designer or developer reviews before a joinery item is released to production. For Bronze Glass Aluminum Frame Wardrobes, the pack has to do more than show a picture of a tinted glass door. It has to prove that the aluminium frame, the bronze-tinted glass, the internal layout and the site dimensions all line up with what was priced, and that nothing in the run-up to installation is being guessed at.

What follows is the checklist we work to on residential wardrobe packages: the drawings, schedules, finish records and sign-off points that let a bronze glass and aluminium frame wardrobe be approved the first time instead of sent back for a second round of questions.

What the submittal has to settle before production starts

Most rework on made-to-measure joinery traces back to three open items: the opening was measured before finishes were accounted for, the glass and frame finishes were described in words rather than samples, and the internal layout was never drawn against the client's storage requirements. A complete submittal closes all three.

Our bronze glass wardrobe sits in the Glass & Aluminum Frame Wardrobes collection, and like the rest of that range it is made to measure, with material and finish options selected per project and a layout tailored to the room. That flexibility is the reason the submittal matters: nothing about the item is standard, so every variable needs a written answer.

1. Dimensioned elevations taken from site-verified openings

Provide an elevation for each wardrobe run, dimensioned in the same units the site drawings use, and show overall height, width and depth against the finished floor and finished ceiling levels rather than the slab and soffit. Note explicitly which dimensions include floor build-up, skirting, cornice, cornicing or a plasterboard set-down.

  • Plan and elevation for every run, including returns and corners.
  • Clear opening sizes plus the tolerance band you are working to.
  • Position of any services, downlights, air-conditioning grilles or switch plates that the frame has to avoid.
  • Ceiling height at each end of a run, since level rarely holds across a room.

Where a wardrobe abuts an interior wall panel system or a concealed door, show the junction detail in the same pack. Those interfaces are where dimension conflicts surface late.

2. Frame profile and finish record

The aluminium frame carries the visual character of this product, so describe it precisely: section shape, visible face width, corner joint method, and the surface treatment with a named finish reference rather than a colour word alone. "Bronze" means different things between anodising, powder coating and film wrapping, and a reviewer cannot compare two quotations from colour names.

  • Frame section drawing at the door stile and the fixed surround.
  • Finish reference, application method and sheen level.
  • Glass-to-frame rebate detail, including gasket or setting block type.
  • Hardware schedule: hinges, slides, handles or profile pulls, with cycle-rated hardware where the doors see daily use.

For projects that want a darker frame line in the same family, Minimalist Black Frame Wardrobes is a useful comparison point when the frame colour is being resolved against nearby cabinetry.

3. Glass schedule: tint, safety build and glazing method

List every glass panel in the pack on one schedule: location, size, tint, thickness, edge treatment and surface finish. Bronze-tinted glass reads warm against timber veneer and pale melamine, and it hides fingerprints better than a clear pane in a bedroom that gets used daily — but the effect depends entirely on what sits behind it.

  • Tint name and the backing condition: mirror, lacquered back, laminate or open view into the interior.
  • Glass type and build, including tempered or laminated construction where the specification calls for safety glazing.
  • Whether bronze, smoked, clear or frosted glass is specified at each position, and why.
  • Glazing method and who carries the risk of breakage between delivery and handover on site.

Ask for a physical sample board of the tint over the actual interior backing before sign-off. A bronze tint over a light carcass and the same tint over a dark carcass are two different rooms.

4. Internal layout matched to how the space is used

Attach the internal fit-out drawing: hanging zones, shelf heights, drawer banks, and any dedicated provisions for luggage, an ironing station or a vanity approach. Then state the carcass material, edge banding and panel thickness behind the glass, because a glazed door invites inspection of the interior finish.

Item to showWhy the reviewer needs it
Hanging heights and shelf spansConfirms long garments clear the shelf above and shelves are not spanning further than the board allows
Drawer bank position and pull-out clearanceShows drawers clear the door reveal and any adjacent wall
Carcass board, edge treatment and colour referenceInterior becomes visible through bronze glass
Integrated lighting and cable routesFixes the transformer location and access point before closing panels
Door swing or slide envelopeProves circulation space is retained once doors are in use

Where a bedroom storage package extends beyond a single run, the same submittal discipline applies to walk-in wardrobe layouts and to modular units that mix open shelving with closed storage.

5. Samples, mock-up and approval record

State what has been approved physically and when: frame sample, glass sample over the correct backing, board sample for the carcass, and hardware sample. Record the approval date and who signed it. A submittal without an approval trail is how a project ends up arguing about a colour six weeks after installation.

For larger villa or hospitality packages, request one full-height mock-up bay before the batch is released. It exposes frame proportion, glass reflectivity under the room's lighting and door operation — three things no drawing settles convincingly.

6. Packaging, delivery sequence and installation method

Glazed joinery is damaged in transit and on site more often than in production, so the pack should describe how panels are crated, separated and labelled to room, and which delivery window the glass elements arrive in relative to painting, flooring and ceiling works. Include the installation method statement: fixing substrate for the frame, levelling approach where floors fall, sequence of glazing, and the snag and handover list the site team will sign against.

We handle this as one scope from manufacturing through freight to on-site installation, which keeps the submittal, the packing list and the install crew working from the same revision. If your programme needs the wardrobe package coordinated with other joinery, custom and OEM service covers bespoke finishes and prototyping, and installation and after-sales support covers inspection, snagging and spare parts.

7. Commercial terms that belong in the same pack

  • Unit rates by wardrobe run, with what is included in each rate and what is a site variation.
  • Quantities and lead time per run, stated against the production release date rather than the purchase order date.
  • Freight basis and delivery address, including who handles customs clearance on the receiving end.
  • Validity period of the quotation, since glass and aluminium pricing moves with raw material costs.
  • What voids the warranty — usually site damage after handover or on-site modification of glazed panels.

Confirm every figure for your own project. Specifications, finishes and lead times on this product are set per project, and the numbers in a submittal should be the ones your contract carries.

A short pre-production sign-off list

  • Openings re-measured on site after wet trades and floor finishes are complete.
  • Frame finish reference matched to an approved physical sample.
  • Glass tint confirmed over the real interior backing, not a loose offcut.
  • Internal layout signed by the end user or their representative.
  • Services, lighting and cable routes located on the drawing.
  • Delivery window agreed so glass arrives after painting and flooring.
  • Snag list format and handover sign-off agreed before the crew mobilises.

Assemble those seven items with the elevations, finishes and schedules above and the submittal stops being paperwork. It becomes the single document that lets a bronze glass and aluminium frame wardrobe be released to production without a second round of queries.

Send us your wardrobe drawings

Share room dimensions, the finish direction and how the storage is intended to be used, and we will return dimensioned elevations, a frame and glass schedule and a quotation for review before anything enters production. Enquire through our contact page or review the wider furniture range.