Freestanding pedestal basin 1003S, modern round ceramic stand basin for bathroom
Model 1003S freestanding pedestal basin — tapered round body on a floor-standing pedestal, restrained by back-panel wall fixing.

A freestanding pedestal basin looks simple on a specification schedule, yet it is one of the few bathroom fixtures where the architectural drawing, the plumbing rough-in and the floor finish all have to agree before anything is ordered. On villa and boutique hotel work we supply, the submittal package is what turns a catalogue image into an approved, installable item. Below is the document set we prepare for the 1003S round ceramic stand basin, and what your architect, MEP consultant or contractor should check on each sheet.

Why the Submittal Matters for a Freestanding Basin

Unlike a vanity-mounted sink, a freestanding basin carries its own pedestal to the floor and relies on a rear wall fixing. That means three separate trades — tiling, plumbing and joinery — read the same document, and any gap between them becomes a site problem after the ceramic has arrived. A complete package answers all three at once.

1. Product Identification Sheet

Start with an unambiguous record of what is being submitted, so the approved item cannot be confused with a similar model in the same range:

  • Model number and full product name as they will appear on the order — 1003S freestanding pedestal basin.
  • Category and series, plus matching items from the same ceramic family (wall-hung basins, one-piece and two-piece WCs, bidets), so a whole guest bathroom can be approved as one package.
  • Finish — white vitreous ceramic with high-gloss glaze in the standard configuration.
  • Country of manufacture and the factory responsible for production.
  • Project name, room or unit schedule reference, and quantity per floor or room type.

2. Dimensional Drawing and Clearances

The 1003S page lists an overall envelope of 490×490×805 mm, with the bowl carried on a tapered pedestal that meets the finished floor. The submittal drawing should show:

Item to dimensionWhy the reviewer needs it
Overall width, depth and height (490×490×805 mm as published)Confirms the fixture fits the allocated bathroom footprint and keeps the door swing clear.
Finished floor to top of basin rimSets user height expectations and supports accessibility review.
Pedestal footprint at floor levelDetermines tile setting lines and whether a sealant joint or cut skirting is required.
Waste outlet centre from finished wallMust match the soil pipe position before screed and waterproofing are laid.
Tap hole position and diameterFixes mixer placement on the tiled wall and spout height over the bowl.
Back panel fixing lineShows where the basin is restrained to the wall and what substrate is needed behind it.

Treat published dimensions as reference values until the technical data sheet for your production batch comes back. We issue the drawing with a tolerance note and ask consultants to confirm final figures before the setting-out drawing is frozen — especially where the basin lands on a tile and adhesive build-up.

3. Installation Detail and Wall Fixing

The 1003S uses back-panel wall fixing to restrain the freestanding body, so the package must show how that restraint works on your specific wall build-up:

  • Fixing detail — bracket or anchor type, spacing and fastener schedule.
  • Substrate requirement: solid brick or block, framed stud with backing ply, or waterproofed substrate — and who provides that backing.
  • Sealant specification at floor and wall junctions, and whether the sealant comes with the basin or from the local finishes schedule.
  • Sequence of works: waste connection, supply connection, wall fixing, sealant, then grouting of adjacent tiles.
  • A note on minimum wall strength where the partition is lightweight, flagged for consultant sign-off.

This section prevents the most common site failure with freestanding basins: the pedestal sits in the right place, but the wall behind it cannot take the rear fixing, so installation stops while backing is retrofitted.

4. Plumbing Rough-In and Drainage Confirmation

Nothing halts a ceramic order faster than an unresolved trap arrangement. For every basin position on the room schedule, record:

  • Waste type — floor or wall outlet, and the S-trap or P-trap arrangement.
  • Rough-in distance from finished wall to waste centre, with the finished-floor level stated.
  • Hot and cold supply offsets and heights, including isolation valve location.
  • Vent and trap provision, and whether the trap ships with the fixture or is provided locally.

Where a project mixes freestanding and wall-mounted basins, we put both on one rough-in schedule so the plumber sets out every bathroom from a single drawing. The same series includes wall-hung options such as the wall-hung ceramic basin 1003B, which frees the floor completely and is often substituted in smaller guest bathrooms while keeping the profile consistent.

5. Material and Glaze Specification

This sheet gives the specifier what they need to defend the product choice on performance grounds:

  • Vitreous ceramic body with a dense structure for load and impact resistance.
  • Dense high-gloss glaze specified to resist water staining, limescale adhesion and discolouration — the main reason a white basin looks tired in a hotel room after a few seasons of use.
  • Cleaning regime: recommended daily cleaners, plus the products to avoid (abrasive powders, strong acid descalers) so housekeeping practice matches the warranty position.
  • A colour and gloss consistency note, useful when basins are delivered in staged batches across different room types.

6. Faucet and Waste Compatibility

The basin is submitted with a pre-reserved tap hole for single-faucet installation, so the faucet decision belongs in the package rather than being left open:

DecisionWhat to record
Faucet typeDeck-mounted single mixer or wall-mounted spout, with model reference.
Spout reach and heightSplash zone over the bowl and hand-washing clearance.
Waste setPop-up or click-clack waste, and whether it is included with the basin.
Supply methodRigid connector or flexible hose, plus the operating pressure range from the faucet supplier.

If the faucet comes from another supplier, request their data sheet early so both documents clear one approval cycle instead of two.

7. Series Matching for Whole-Bathroom Consistency

A single basin submittal is easier to approve when the rest of the sanitary suite sits beside it. On projects where consistency across rooms matters, we submit the 1003S alongside the matching wall-hung WC from the same family, such as the rimless wall-hung toilet 1038W, plus the bidet and basin options in that series. The reviewer approves a bathroom concept once, instead of reopening the discussion at every fixture type.

8. Packaging, Handling and Delivery Condition

Ceramics are inspected on arrival, so packaging detail belongs in the submittal, not only in the shipping file:

  • Packaging construction — moulded protective packing with corner protection inside a carton or crate.
  • Carton dimensions and gross weight per unit, needed for lift and service-lift planning on upper floors.
  • Carton marking: model number, quantity and room or unit reference, so fixtures go straight to the correct bathroom.
  • Inspection procedure on delivery, including how damaged units are photographed before anyone signs.

9. Quality Control, Testing and Certification Documents

Which certificates accompany a package depends on the destination market and the consultant's requirement list, so we handle this as a project-specific item rather than a blanket claim:

  • The checks run on the production batch — visual and dimensional inspection, glaze appearance, and confirmation of waste and tap-hole positions.
  • Any certificates or test reports the consultant requires, marked "provided" or "to be confirmed", with the issuing body named.
  • Where a market requires local certification or water-fixture registration, that requirement is raised at submittal stage so it does not surface after production has started.
Do not assume a certificate applies to your project just because it appears on a catalogue page. Ask for the report covering the actual batch, and check that its model reference matches the number on your order and delivery note.

10. Sample Approval, Spares and After-Sales

The closing pages protect the project after handover:

  • A pre-production sample or first-article approval step for large room counts, so glaze tone and shape are signed off before bulk output.
  • Spare-parts provision — waste sets, tap-hole trims and wall-fixing hardware available as replacements.
  • Warranty scope stated in writing, together with the exclusions that follow from using unsuitable cleaners.
  • A named project contact, so snag lists after installation route to one person rather than a general inbox.

Review Checklist Before You Return the Package as Approved

  • Does the dimension drawing match the reflected plan including tile build-up?
  • Is trap type and rough-in confirmed against the actual soil position, not a typical detail?
  • Can the wall substrate take the back-panel fixing, and is that shown on the structural or joinery drawing?
  • Are faucet and waste settled, with supplier data attached?
  • Does the certificate list match the destination market requirement?
  • Is the delivery sequence compatible with wet-trade and finishing programmes for each unit?

How This Fits a One-Stop Bathroom Fit-Out

Because we supply fixtures alongside the rest of the interior package, one submittal can carry the shower set, cabinetry, wall and floor finishes and lighting for the same room. A single approval cycle removes the mismatches that appear when each trade submits separately — a basin ordered to one height while the joinery and mirror were drawn to another. Our custom and OEM service covers bespoke dimensions and finishes where a catalogue item does not suit the design, and logistics and door-to-door delivery brings the approved package to site with the paperwork already prepared for inspection.

Preparing a submittal for your project?

Send us the room schedule and the plumbing set-out, and we will return the 1003S dimension drawing, fixing detail and specification sheet in a format your consultant can review and stamp — with matching basins, WCs and bidets from the same series listed on one package.

Contact PHILLIP · Phone / WhatsApp: +86-13928214007 · Email: santerson@qq.com · Contact page

Dimensions and technical values above are taken from the published product page. Confirm them against the current technical data sheet for your production batch before setting-out drawings are issued.