A folding door quotation is only as accurate as the opening information behind it. Here is the practical checklist we work from when a project asks us to price Santerson Glass Folding Doors — and what happens when each item is missing.
Glass folding doors sit at an awkward point in most project schedules. They are specified early, because they shape the whole idea of an open living space or a flexible meeting room, yet they are measured late, after flooring, wall finishes and ceiling levels are settled. That gap is where quotation errors come from.
As a one-stop furniture and building materials supplier working on villa, hospitality and office projects, we quote these doors as made-to-measure items: finish, layout and dimensions are set per project. Two enquiries with the same "6 m wide opening" note can produce very different prices depending on panel count, glass choice, frame finish and where in the world the doors have to arrive.
The list below is what we actually need from you. Send it in one message and a first quotation usually comes back without a long round of follow-up questions.
1. The opening, measured at finished level
This is the item that causes the most rework, so it is worth getting right before you write to us.
- Width and height of the structural opening, plus whether those dimensions are taken to the structural shell or to the finished floor, wall and ceiling surfaces. Finished-level dimensions are what we need.
- Headroom and floor build-up. Tell us the ceiling level above the opening and whether a screed, tile bed, underfloor heating or raised floor is still to come.
- Threshold situation. Flush floor, low threshold, or an existing upstand. This affects track selection and how the leaves fold back.
- Squareness and plumb. If walls are known to be out of square, say so now rather than at installation.
- What sits either side of the opening. Blockwork, timber stud, steel frame or an existing aluminium curtain wall determines how the frame is fixed and what fixing detail we draw.
If a site survey is not yet possible, send us the architectural elevation and plan at the current design stage. We can quote from drawings with a stated tolerance band, and then confirm dimensions once the openings are actually formed.
2. The layout you want, in plain language
"Folding door" covers several quite different arrangements, and price follows the arrangement more than the area.
- Number of leaves and leaf width. A 6 m span can be four wide leaves or six narrower ones, with different hardware loads.
- Folding direction and parking. Which side do the leaves stack to — inside or outside, one stack or split two-and-two?
- Master leaf. Do you want a single pedestrian door within the set, so the wall can be opened without folding the whole run back?
- Top-hung or bottom-rolling. This interacts with your threshold decision above and with what is below the floor.
- Panel-to-panel alignment. Flush meeting stiles versus a visible mullion profile changes the look when the doors are closed.
A sketch on the plan, even a rough one photographed from paper, removes most of the guesswork. If you have already looked at classic folding doors or wood veneer folding doors as an alternative to glass, mention that too — the same opening information applies, and we can price both options against each other.
3. Glass and frame specification
For a configurable product like this, "glass" is not one line item. Specify what you want and we will confirm feasibility for the leaf sizes you have chosen.
| Item | What to tell us |
|---|---|
| Glass build | Toughened, laminated toughened, or insulated double glazing; and any solar-control or low-emissivity coating if the design calls for one. |
| Tint and appearance | Clear, low-iron, bronze, grey or frosted. If you are matching existing glazing elsewhere on the project, send a sample reference or a photograph of the target glass. |
| Safety requirements | Where the doors are in a location that your design code or client brief treats as critical, and who is signing off that requirement. |
| Frame material and finish | Aluminium frame colour (anodised, powder-coated, wood-effect), and whether internal and external faces should differ. |
| Hardware | Handle style and lock provision, restrictor or flush bolt preference, and any access-control interface the doors must connect to. |
Where you are not yet settled on these, write "to be advised" rather than leaving the line out. A provisional specification keeps the quotation moving; a blank line stops it.
4. Quantity, programme and delivery terms
Commercial terms change the number as much as the product does, so we ask for them at the same time.
- Quantity — how many openings, and whether the sizes repeat. Repeating sizes cost less to produce and to check.
- Required on site date, not just the order date. Production scheduling follows the site programme.
- Destination and delivery terms — port or site address, and your preferred Incoterms. We arrange freight forwarding by sea, air and rail with customs paperwork and door-to-door delivery, so tell us whether you want delivery to port or all the way to the building.
- Packaging preference — crate type matters for glass on long transits and for site storage conditions.
- Package structure — if doors from the same set must ship together, say so; if you would rather split a delivery to suit site phasing, that is also workable.
A note on scope. Santerson Glass Folding Doors are made-to-measure, with material and finish options set per project. We do not quote a standard catalogue size for this item, and we will always ask you to confirm dimensions and selected specifications before production starts. Any figure in an early quotation is based on the information you supplied at that moment.
5. Installation and who does what
The last block of information decides whether your quotation includes support on site or not.
- Who installs. Your local contractor, or do you want installation support from us? We provide on-site installation, inspection and snagging on projects where that has been agreed in scope.
- Site access. Floor level of the apartment or villa, lift dimensions, crane or hoist availability, and whether glass panels can be carried into the opening at all. Large glazed leaves frequently cannot go through a stairwell.
- Sequence with other trades. When flooring, render and ceiling are due to complete around the opening.
- After-sales expectations — spare parts such as rollers, tracks and handles you would like held with the order.
If installation is not in scope, we send fixing drawings with the quotation so your contractor can price the opening correctly. That single drawing usually prevents a variation later.
A compact enquiry template you can copy
Send these eight lines and we can normally return a first price without going back for basics:
- Project name, location, and the type of building (villa, hotel, resort, office).
- Opening count, with width and height at finished level for each.
- Layout: leaf count, folding direction, parking side, master leaf yes or no.
- Glass build and tint; frame material and finish.
- Threshold type and floor build-up still outstanding.
- Required on-site date and preferred delivery terms.
- Installation: yours or ours.
- Drawings attached — plan plus elevation of the opening.
Common gaps that delay a quotation
In practice, most delays come from four places. Dimensions given to the structural shell when finishes are still to be applied. A layout described in words but not drawn, so leaf count and parking direction stay ambiguous. Glass specified as "double glazed" with no coating or tint decision, which we cannot resolve for you without knowing the climate and the client's brief. And a required date given as "as soon as possible", which leaves production scheduling to compete with other jobs in the same period.
None of these are difficult to fix — they simply need to be settled before the enquiry rather than during it.
Related products on the same opening
Where a folding arrangement proves awkward for a particular span, the same opening information supports a comparison with glass sliding doors, glass sliding panels for internal division, or modern slim frame French doors. Ask for two or three options priced against the same opening and it becomes much easier to defend the choice in a cost review.
Send us your openings
Forward the eight-line summary above with your drawings, and we will come back with a made-to-measure quotation for glass folding doors, including frame finish options, packing and delivery to your agreed terms. As part of our custom and OEM service, non-standard sizes and finishes are handled as project work rather than treated as exceptions.