A wardrobe enquiry that arrives with dimensions, a finish direction and a delivery location moves far faster than one that only says "I need wardrobes". If you are specifying Wood Tone Open Wardrobes for a bedroom, dressing room or villa project, the information you bring to the first conversation decides how quickly you get an accurate quotation — and how few revisions you need later.
Here is what to have ready before you contact us, written from the point of view of the people who actually build and ship these pieces.
1. The room dimensions, measured the way an installer measures
Open wardrobes are made-to-measure, so rough floor plans cause most of the rework. Give us:
- Width and height of the wall run, plus the depth you want the carcass to occupy.
- Floor-to-ceiling height at several points, not just one — slab levels vary, and a wardrobe that meets a ceiling needs that detail agreed early.
- Position of skirting boards, architraves, radiators, light switches, power outlets and any recessed niches.
- Door and window swing paths, and whether the wardrobe butts into them or stops short.
A simple sketch with measurements marked, plus two or three photographs of the wall from different angles, is usually enough for us to start. If your drawings are in CAD or PDF, send them; if they are hand-drawn on paper, that works too.
2. How the wardrobe will be installed
The same run of open shelving can be built three different ways, and each one changes price and lead time:
| Approach | What we need from you |
|---|---|
| Built-in / fitted to the structure | Wall construction type, finished floor levels, whether walls are straight or need scribing, and who prepares the space. |
| Freestanding unit | Clearance needed for plinths or skirting, and whether the unit should be anchored to the wall. |
| Wall-mounted open wardrobe | Substrate behind the plasterboard or finish, so we specify the correct fixings and load rating. |
Tell us who is on site — your builder, your joiner, or our own installation team. That single answer determines whether we produce a single assembled unit or a flat-pack set sized to pass through doors and lifts.
3. The wood tone you actually want
"Wood tone" means different things to different buyers, so it is worth being specific before we quote:
- Species or look. Oak, walnut and cherry are common directions for residential wardrobes. Our catalogue also covers Walnut Veneer Wardrobes and Wood Grain Melamine Wardrobes if you want a consistent grain at a different specification.
- Surface finish. Matte or high-gloss lacquer changes how the same tone reads under bedroom lighting and how fingerprints and dust show up.
- Reference samples. A paint colour code, a photograph of an existing floor or door, or a physical sample you already hold all narrow the range quickly. Screens vary; a physical sample does not.
- What it must match. If the wardrobe has to sit alongside existing flooring, doors or kitchen cabinetry, send us those product names as well as photos.
Ask for finish samples before you commit to a full set. We can discuss material and finish options at quotation stage, and confirming the tone on paper is far cheaper than confirming it on site.
4. The internal layout, based on how you store things
Open wardrobes put everything on display, so the hanging-to-shelf ratio matters more than it does behind doors. Think through:
- Short-hang versus long-hang sections, and roughly how many of each.
- Drawer count and depth — under-trouser drawers, jewellery trays, or deep storage for linens.
- Shelf spacing for folded stacks, boxes and bags, and whether any shelf should be adjustable.
- Lighting. Integrated LED strips need a power feed and a driver location decided before the carcass is built.
- Open-storage housekeeping: dust protection for pieces you wear rarely, which often means keeping one closed section nearby.
If you are furnishing several bedrooms at once, note which layout repeats and which is a one-off. Repeating a layout across units keeps specification simple and usually helps the price.
5. Quantities, site location and delivery logistics
For a single bedroom, this is straightforward. For a villa, apartment block or hospitality project, have these ready:
- Number of wardrobe runs per room, and whether rooms repeat.
- Project address and the delivery point — kerbside, loading dock, or a specific floor.
- Lift dimensions, stair widths and turning radii for upper-floor apartments.
- Your target installation date, working backwards from practical completion.
- Who handles import clearance on your side, and which Incoterms you intend to trade on.
We handle freight by sea, air and rail with customs paperwork and door-to-door delivery as part of our logistics service. Tell us the destination city and required on-site date in the first message and we will tell you which shipping option realistically fits.
6. Budget range and decision authority
A budget band, not a precise figure, lets us specify sensibly the first time. Material choice, door-free detailing, integrated lighting and drawer hardware all move cost, and knowing your range means we propose something you can actually approve rather than something that needs three revisions.
Also tell us who signs off the quotation: you, a designer, a builder or a procurement manager. When an interior designer is involved, copying them into the thread lets us coordinate drawings and production directly — our design and project coordination service covers exactly that handoff.
7. What we will send back
Once we have the above, expect a quotation with specification detail, followed by drawings or 3D visualisations for your approval before production starts. Our cooperation steps run from project brief and design proposal to quotation and detail confirmation, then production, shipment and follow-up — nothing goes into manufacturing until you have confirmed dimensions and selected specifications in writing.
If your project also needs cabinetry, doors, flooring or bathroom fixtures from the same supplier, mention it at the start. Coordinating built-in furniture with building and finishing materials in one programme avoids two trades working to different drawings on the same wall.
A quick pre-enquiry checklist
- Wall width, height at multiple points, and required depth
- Obstacles: skirting, switches, outlets, doors, windows, ceilings
- Installation method and who prepares the space
- Wood tone direction, finish sheen, and any product to match
- Internal layout: hanging, drawers, shelves, lighting
- Quantity of runs and whether layouts repeat
- Delivery address, access route, target installation date
- Budget band and who approves the quotation
Bring the measurements and the finish direction, and the rest of the conversation is quick. Send your sketch, photographs and target date to the Wood Tone Open Wardrobes product page enquiry form or through our contact page, and we will come back with a specification you can approve.