A glass paneled wardrobe sits at the meeting point of joinery, glazing and interior finish. When the drawing set is thin, that combination is where rework appears: a door that will not clear a bed, a glazed panel ordered to the wrong module, or a carcass depth that no longer suits the hanging layout. Because our glass paneled wardrobes are made to measure for each project, the quality of the finished piece depends almost entirely on the measurements and decisions you send us at the enquiry stage. The checklist below is the same one our project team works from when a bedroom or villa wardrobe moves from concept into production.

Start With the Room Envelope, Not the Wardrobe

Send the wall-to-wall and floor-to-ceiling dimensions of the space before you commit to a wardrobe size. In most bedrooms the finished ceiling height varies across the room because of bulkheads, curtain boxes, skirting and floor build-up, so record each of these separately rather than quoting one figure.

  • Width: the clear wall run at three heights — near the floor, mid-height and near the ceiling. Out-of-plumb walls are common, and a 10 mm difference across a four-metre run changes the panel layout.
  • Depth: the available depth at the deepest and shallowest point, including skirting boards, radiators, door reveals and any piped or boxed-in services.
  • Height: finished floor level to soffit, with the thickness of the floor build-up noted if the screed or flooring is not yet laid.
  • Obstructions: switch plates, sockets, AC returns, sprinkler heads, wall lights and window reveals, each measured from a fixed corner.

Where the wardrobe will be built into a recess or alcove, photograph the recess with a tape measure in shot. A drawing plus two photographs resolves most questions before we open the enquiry file.

Confirm the Structural and Floor Conditions Early

Glass paneled doors carry more weight per door leaf than a plain timber panel, so the fixing condition matters as much as the size. Tell us what the walls and floor are made of before we design the hanging system.

  • Wall build-up: masonry, blockwork, steel stud with plasterboard, or timber frame. Fixing details differ for each, and a light-gauge partition may need nogging or a backing batten that has to be drawn before the walls are closed up.
  • Floor finish and level tolerance: whether the wardrobe sits on a finished floor or on a screed, and how flat that surface is. A full-height carcass transfers any out-of-level condition straight into the door line.
  • Ceiling allowance: if the unit runs to the ceiling, confirm whether the ceiling is fixed or has an access panel above it.

These details are worth settling while the site is still open. They rarely cost anything at drawing stage and almost always cost something later.

Define the Door Layout Before the Carcass

The door schedule drives the carcass, not the other way round. For a paneled wardrobe with glazed inserts, decide how many doors you want and what each one does, then let the panel widths follow from that.

InputWhat to specifyWhy it matters
Door typeHinged, sliding or walk-in configuration for the room in questionDetermines the clearance envelope and hardware set
Circulation clearanceDistance from the front face of the wardrobe to the nearest fixed furniture or wallGoverns whether hinged doors can open past a bed or nightstand
Panel modulePreferred door width and the number of vertical divisionsSets glazed-panel proportions and joint positions
Glazing positionWhich doors are glazed, which are solid, and where the mid-rail falls relative to eye levelAffects privacy, contents visibility and visual balance in the room
Handle detailProfile handles, integrated pulls or a handleless edgeInfluences door-to-door gaps and the shadow line

If the bedroom is tight, compare the hinged option against glass sliding door wardrobes, which remove the swing arc but ask for a track zone and an overhead headrail. Where the room has a dedicated dressing area, glass walk in wardrobes change the question again: access becomes a circulation route rather than a door swing, and panel heights can run taller because there is no bed edge to clear.

Specify the Interior Layout Against Actual Storage Needs

Internal zoning should come from how the wardrobe will be used, not from a standard template. For an apartment or villa handover, tell us who the room serves and what it has to hold.

  • Hanging: short-hang sections for shirts and jackets, long-hang for dresses and coats, and whether double hanging rails are needed to save width.
  • Drawers: number and depth, and whether they sit inside the carcass or in a dedicated drawer bank.
  • Shelving: adjustable shelf positions, plus fixed shelves where the layout needs them.
  • Tall and awkward zones: deep top storage, corner returns, and any space reserved for an ironing station, safe or luggage.
  • Lighting: whether interior or edge lighting is required, since wiring has to be routed before the carcass closes.

Our custom minimalist bedroom wardrobe line follows this same logic — sizes, internal layouts, door styles and surface finishes are set per project, with an optional handleless front for a clean unbroken plane. If you are comparing that approach against the classic paneled look, send both references and we will price the two options on the same basis.

Set the Finish and Glazing Schedule With Samples in Hand

Glass and timber read very differently on a drawing than they do under site lighting, so we recommend settling the finish schedule from physical samples before sign-off.

  • Glass type: clear, bronze, smoked, frosted or ribbed, each of which changes how much of the interior is legible from the room.
  • Frame colour and profile: the metal or timber section around the glazing, including whether it matches the panel stiles or contrasts with them.
  • Panel finish: paint colour and sheen, veneer species and cut, or laminate texture, checked against the flooring, doors and joinery already specified for the project.
  • Edge and joint treatment: how the panel meets the frame and how adjacent units butt together.
Where a project has an existing finish schedule or a sample board travelling with it, send a copy of that document. Matching a specified paint code or veneer is straightforward; matching a remembered colour is not.

Send the Project Context With the Numbers

Beyond dimensions, four pieces of context let us return a quotation that does not need revising:

  • Quantity and unit mix: how many wardrobes across how many bedroom types, and whether the same detail repeats.
  • Programme: the target site-ready date, plus the date the room will be watertight, clean and free of wet trades.
  • Delivery destination and access: port or site address, container or consolidated shipment, and any lift, stair or loading restrictions at the point of delivery.
  • Coordination contacts: the architect, builder or site lead who can confirm openings and set-out dimensions.

As a manufacturer working on villa, apartment and hospitality projects, we handle made-to-measure production, packing and shipment for the wardrobes alongside the rest of the joinery package — wall panel systems, interior doors, matching cabinetry and bathroom fixtures — which keeps one supplier accountable for the timber and glazing work rather than several.

A Short Pre-Enquiry Checklist

  • Wall run measured at three heights, with out-of-plumb noted
  • Available depth recorded at the deepest and shallowest points
  • Floor-to-soffit height, with floor build-up identified
  • Obstructions located from a fixed corner, with photographs
  • Wall build-up and fixing condition confirmed
  • Door type chosen against circulation clearance
  • Panel module, glazing position and handle detail decided
  • Internal zoning set against actual storage needs
  • Finish and glazing schedule selected from samples
  • Quantities, programme, delivery address and site contacts supplied

If most of that list is complete, we can move straight to drawings and a quotation. If parts of it are still open, send what you have and mark the gaps — our project team will flag which items need a site check before production is released.

Send your dimensions, photographs and finish references with an enquiry and we will return shop drawings for review before any panel is cut. Every glass paneled wardrobe we produce is confirmed against your approved drawings, so the measurements above are the single most useful thing you can put in front of us at the start.