A double vanity has to satisfy two people, a fixed wall length, a waste position and a handover date at the same time. On villa and hospitality projects we supply from China, it also travels in a container and has to coordinate with tiling, stone and joinery trades on site. This guide sets out when a made-to-measure Santerson Double Vanity is the right call for your project, and when an off-the-shelf unit is simply the better buy.
What "custom" actually covers on this product
The Santerson Double Vanity sits in our Vanities range and is configured per project rather than ordered from a fixed size list. Three things are set to your drawing: overall width, height and depth; the material and finish of the carcass, doors and drawer fronts; and the layout — basin positions, storage mix, and whether the unit stands on a plinth or fixes to the wall as a Santerson Floating Vanity. Where the countertop and basins are integrated into one unit, the matching specification is our Santerson Integrated Countertop Vanity.
Because sizing is made to measure, the same design can be repeated across guest rooms or villa bathrooms with consistent reveals and finish codes, which is exactly what a snag list on handover day wants.
Five moments when a custom double vanity earns its place
- The wall run does not match standard widths. Recesses between brick returns, niche depths and skirting offsets rarely land on catalogue increments. If your clear opening is 1480 mm rather than the 1500 mm width a stock unit assumes, a made-to-measure carcass removes the filler piece and the silicone joint that goes with it.
- Two basins have to share one short run. On narrow runs, two separate basins start fighting each other for elbow room and the countertop overhang at each end becomes awkward. Specifying the Santerson Double Basin Countertop as part of the same order lets us set basin centres and tap holes to the unit instead of forcing the stone fabricator to cut around a purchased cabinet.
- The waste and isolation valves are already in the slab or wall. On refurbished villas, plumbing is fixed long before joinery is specified — the sequence we work to on our own renovation projects. A custom carcass lets drawer runs, false fronts and access panels clear the valve positions on your as-built drawing.
- Finish has to match other joinery in the build. When bathroom vanities need to read as one set with wardrobes and kitchen cabinetry, finish and edge detailing are specified together. We manufacture cabinetry alongside sanitary fixtures, so the same door profile and colour reference can carry through the whole fit-out under a single purchase order.
- You are buying several bathrooms at once. Repeating one specification across the bathrooms on a floor or wing is where a single custom drawing pays back: identical dimensions, identical hardware, one production batch, one container.
When to keep it simple instead
Custom sizing adds lead time and a drawing approval step. Choose a standard single unit when the room is a guest powder room, when one user is the norm, or when the wall length already fits a stock width and the waste is centred. In those cases our Single Vanity specification covers the same finish choices without the extra coordination.
What we need from you before production starts
| Item to confirm | Why it matters |
|---|---|
| Clear wall length, plus depth of any skirting or tile build-up | Sets the carcass size and whether a scribe is needed at all |
| Waste, supply and isolation valve positions on site | Determines drawer layout and access cut-outs |
| Basin type — undermount, vessel or integrated countertop | Changes countertop thickness, tap hole positions and overflow detail |
| Mirror cabinet and vanity lighting plan | Cable routes and bracket positions are fixed before the carcass ships |
| Finish reference for surrounding joinery | Keeps bathroom, wardrobe and kitchen cabinetry visually consistent |
| Delivery address and access route | Determines packaging, crate size and container loading plan |
How the order moves through our process
The workflow is the one we run for every fitted item, as set out on our one-stop solution page: you send the bathroom layout and dimensions, design returns a proposal with the specification drawn out, we quote once details are confirmed, then production and quality control run alongside the rest of your joinery. Project management and site coordination continue through to installation and handover, so vanities, mirror cabinets and the surrounding cabinetry arrive as one coordinated package rather than three separate purchases.
Dimensions, countertop fit, basin spacing, materials, hardware and electrical details are set per configuration. We confirm them against your drawings in writing before production begins, so the specification you approve is the specification that ships.
A quick pre-specification check
- Measure clear opening, not the tiled face — record tile and waterproofing build-up separately.
- Mark finished floor level; a floating vanity needs its fixing height set against it.
- Photograph existing plumbing and note trap type before drawing the carcass.
- List every other joinery item that must match the finish, so colour references are approved once.
- Agree who sets out on site: our installation guidance or your tiling contractor.
Talk to us about your bathroom package
If your project needs vanities, worktops and the rest of the joinery produced as one set, send us the drawings. As a China furniture and building materials manufacturer working on villa and hospitality projects, we quote the double vanity together with matching storage, mirror cabinets and vanity lighting, so one order covers the room.
Send your bathroom layout for a made-to-measure quotation.
Contact: PHILLIP | Phone / WhatsApp: +86-13928214007 | Email: santerson@qq.com
Enquire through our contact page and we will respond with a specification proposal.