A closed bookshelf looks simple on a drawing: a run of cabinetry with doors, shelves inside, and a finish that matches the rest of the joinery. In production it is anything but simple. Door style, carcass material, shelf span, fixing method and how the unit meets the floor and ceiling all change the price, the lead time and how the piece performs after handover. This guide walks through the specification fields we need for Santerson Closed Bookshelves, so that your enquiry comes back with a firm quotation instead of another round of questions.
What a closed bookshelf specification must answer
Our closed bookshelves belong to the Bookshelves collection for residential living projects, and every unit is made to measure: sizing, material and finish options and a layout tailored to the project. That flexibility is the point, but it also means there is no standard catalogue item to fall back on. A workable specification answers six questions:
- Where does it sit? Wall length, wall height, obstructions (skirting, cornices, switchboards, air conditioning returns), and whether the wall is plasterboard, brick or timber framing.
- What goes inside? Books, display objects, glassware, files, or a mix. This drives shelf depth, shelf spacing and load requirements.
- Open or concealed? How much of the contents should be visible, which decides between solid doors, glass-fronted units or a combination.
- How is it built? Carcass board, door substrate, edge treatment, backing and hardware grade.
- How does it meet the room? Floor-to-ceiling or a defined height, scribe to wall, plinth or recessed base, and how uneven floors are handled on site.
- How is it delivered and installed? Loose or assembled crates, container share, who fixes it to the wall, and the sequence relative to painting and flooring.
The specification fields, one by one
1. Overall dimensions and setting-out
Send overall width, height and depth in millimetres, plus a dimensioned wall elevation with the finished floor level marked. For a run that crosses a doorway, column or corner, mark each segment separately. If the unit is designed to sit flush with a plasterboard wall, say so early — a recessed carcass needs the set-out confirmed before the wall is closed up, not after.
Tell us whether the height stops at a fixed dimension or runs to the ceiling. A floor to ceiling bookshelf is specified differently from a waist-height unit: ceilings are rarely level, so a full-height run needs a scribe or top filler decided on the drawing, and internal shelf counts are set from the actual site height rather than a nominal one.
2. Internal layout and shelf loading
Mark which bays are adjustable and which are fixed, and give the shelf depth you need for the intended contents. A deep bay sized for storage boxes behaves differently from a shallow display bay. Where long spans carry heavy books, tell us the load you expect; that decides whether the span needs a mid-support, a thicker shelf board or a rail-backed system. Specify drawer banks, cable management for any media bay, and integrated lighting separately — power points, driver location and the switching method all need to appear on the drawing.
3. Door type and how much you want on show
Closed does not have to mean fully hidden. Choose per bay:
| Door / front option | Best suited to | What to specify |
|---|---|---|
| Solid panel doors | Storage, files, clutter you want out of sight; classic and shaker profiles as well as handleless fronts | Panel profile, grain direction, door thickness, hinge side, handle or push-open |
| Glass fronts | Display shelving, chinaware, collections — see Santerson Glass Front Bookshelves | Glass type and tint, frame or frameless, door size, shelf visibility behind glass |
| Mixed open and closed bays | Living rooms and studies that need display plus concealed storage in one run — see Santerson Mixed Open & Closed Storage | Which bays stay open, the ratio of open to closed, and how the transition is detailed |
| Modular systems | Runs that may be extended later, or layouts still under review — see Santerson Modular Bookshelf Systems | Module width and height grid, future extension direction, fixed versus reconfigurable shelves |
Where a room needs both display and concealed storage but not inside one carcass, pairing closed units with open bookshelves keeps the drawing honest: open bays are specified for what they show, closed bays for what they hide.
4. Materials and finish
Name the carcass board, the door substrate and the surface — veneer, laminate, lacquer or paint — and give the colour or grain reference with a physical sample where the finish has to match existing joinery. Veneer needs the grain pattern and matching sequence agreed before panels are cut; painted doors need the sheen level stated. Note the environment as well: a study off a bathroom or a coastal villa is not the same service condition as an internal hallway, and that affects board choice and edge sealing.
5. Hardware
Specify hinges (soft-close or standard), handles or a handleless profile, drawer runners and their rating, shelf-pin material, and any door catch or push-open mechanism. Where integrated lighting is involved, state the profile, colour temperature and dimming method. If your project already has an approved hardware schedule, send it — matching an existing hinge brand is far cheaper than substituting after production.
6. Tolerances, fixing and installation interface
Confirm who prepares the walls and floor, and to what level. Tell us whether scribes are allowed on visible faces, whether the unit must be anchored to framing or to a solid substrate, and whether on-site fixing is done by your trades or by our installation team. Built-in joinery that arrives before the painting trade has finished will be damaged on site; that sequencing decision belongs in the specification, not in a message after the crates land.
A short template you can copy
| Field | What to send |
|---|---|
| Project and room | Project name, room, contact, required site date |
| Setting-out drawing | Wall elevation with overall W × H × D in mm, segments marked, FFL noted, obstructions dimensioned |
| Internal layout | Adjustable/fixed shelves, shelf depths, drawer banks, media or lighting bays |
| Fronts | Solid / glass / mixed per bay; profile and handle detail |
| Finish | Carcass board, door substrate, surface, colour or grain reference, sample number |
| Hardware | Hinges, runners, handles, lighting profile — brand and model where an approval exists |
| Delivery & install | Port of delivery, crate preference, who fixes to wall, trade sequence |
Ordering built-in joinery as part of a wider fit-out
Bookshelves rarely stand alone. When the same run has to match kitchen cabinetry, wardrobes and doors, ordering them together keeps carcass board, edge banding and paint batch consistent across the house, and puts one production schedule behind the whole joinery package. Our custom furniture design and prototyping service covers bespoke material finishes and textures alongside OEM work, which is useful when a project has its own detailing standard. For villa and apartment fit-outs delivered end to end, our turnkey solutions run from consultation and design through production, logistics, installation and after-sales support.
Freight is part of the specification. Freight forwarding by sea, air and rail, with customs paperwork, packaging and container loading plans, and door-to-door delivery is arranged as part of the project — and a bookshelf run shipped loose-packed for on-site assembly needs a different crate schedule from one delivered assembled. Confirm your port of delivery and site access early so the packing plan is set before production starts.
Before you send the enquiry
- Dimensions in millimetres, taken on site, with finished floor level marked.
- One drawing per wall, not one sketch for the whole floor.
- Front type decided bay by bay, with glass or solid stated.
- Finish reference and, where matching matters, a physical sample.
- Hardware schedule if your project already has approved ironmongery.
- Delivery location, required site date and who installs.
Send that and the quotation comes back against a defined product. Start from the closed bookshelves product page, attach your elevation drawing, and we will confirm dimensions, materials, finishes and hardware for the configuration you need.