A swim spa is rarely a single line item on a purchase order. Around the shell of an Outdoor Swim Spa WS-S12-T sit pumps, filtration, lighting, steps, insulation, electrical supply, paving, and a whole poolside furniture programme. This guide walks project buyers, contractors and villa owners through how we count the quantities and coordinate those related items at production and shipping stage — using the WS-S12-T as the worked example.
Start with the spa itself: what one unit contains
The catalog specification for the WS-S12-T lists an integrated configuration of 1 control system, 1 swim training system, 2 water pumps, 1 filter pump, a jet total of 73 pcs, 1 LED light plus 50 small LED lights, and total power of 7.65 kW, in catalog dimensions of 11740 × 2200 × 1470 mm. Those components ship as part of the unit, so you do not order them separately.
What you do decide line by line is the option set. The catalog options for this range include control systems, UV sterilisation, water pumps, heat pumps, sand filtration, insulation and steps. Availability and compatibility vary by model, so each option is confirmed against the exact configuration before production starts.
Counting quantities across a multi-unit order
Once you move from one spa to several — a resort, an apartment development, or a small cluster of villas under one contract — the counting logic changes. We build the schedule in three layers.
Layer 1: spa units by model and option set
Each unit is listed by model code plus its confirmed options, never as a generic "swim spa x 6". Two identical shells with different heat pump or filtration choices are two separate production lines, with separate packing lists. Where a project mixes sizes, the same approach applies to the shorter models in the range — for example the Outdoor Swim Spa WS-S12, which shares the 11740 × 2200 × 1470 mm shell dimensions with the WS-S12-T but is listed without a swim training system, or the Outdoor Swim Spa WS-S10-T at 10000 × 2200 × 1420 mm. Confirm the specification of each model on its product page before you lock the schedule; do not assume that models with similar names carry identical equipment.
Layer 2: options and spares per unit
Options are quantified per unit, not averaged across the order. In practice we ask for:
- The option list per unit — heat pump, UV sterilisation, sand filtration, insulation, steps — written against each model code.
- A spare-parts allowance agreed at quotation stage rather than after handover: typically nozzle and seal sets for the jet bank, filter media for the filter pump, and standby items for the pumps in the configuration. The exact list depends on your specification and is quoted with the order.
- The control system arrangement, so that identical units are configured identically and site staff only need one operating routine.
Layer 3: poolside furniture and structures
The spa is the anchor, but the surrounding deck is furnished as a set. For poolside schemes we coordinate rust-proof aluminium frames with weather-resistant cushions — the Modern Aluminum Outdoor Dining Set & Sun Lounger covers dining and reclining in one matching family, with adjustable lounger positions for the pool edge. Where a shaded lounge or spa deck needs protection from strong side sun and breeze, the Motorized Louvered Aluminum Pergola with LED Strip & Zip Screens is specified to custom bay dimensions, frame colour and screen transparency, and its built-in LED strips remove the need for separate lighting fixtures over the deck.
Quantities here are counted by seating position and by bay width, then matched to the circulation routes around the spa — clear access to the equipment side of each unit, and enough turning space for delivery and future servicing.
Coordination points that decide whether the schedule works
| Item | What we coordinate | Why it matters for quantities |
|---|---|---|
| Power | Total power of 7.65 kW per unit as listed in the catalog specification, confirmed against the selected option set | Electrical capacity is sized per unit and per installation point; options change the load profile |
| Footprint | Catalog dimensions 11740 × 2200 × 1470 mm, plus working clearance for equipment access | Determines how many units fit a terrace or deck layout and how they are positioned |
| Filtration and water treatment | Filter pump, sand filtration or UV sterilisation options per unit | Consumables and spares are ordered in step with the chosen treatment route |
| Steps and insulation | Step type and insulation option per site | These are site-specific, so quantities follow the location list, not just the model list |
| Packaging and containers | Units grouped by configuration on the packing list; container loading planned before booking | Mixed configurations load differently; freight is arranged by sea, air or rail with the paperwork handled at our end |
| Site sequence | Delivery dates matched to civil works, paving and electrical completion | Spas delivered before the deck and power are ready sit idle and risk damage |
Specification note: the figures above are transcribed from our catalog pages for the WS-S12-T and related models. Equipment included, electrical requirements and available options depend on the configuration you confirm at quotation stage, so we verify them with you before production rather than assuming a standard build.
How the schedule moves through our side of the job
Our cooperation steps run from project brief and design proposal, through quotation and detail confirmation, to production, shipment and follow-up. For a swim spa order that means:
- Brief and layout. Unit count, model mix and locations, checked against the deck drawings you provide.
- Detail confirmation. Every option, spare and poolside furniture item written into one schedule with model codes, so nothing is decided verbally.
- Production. Units built to that schedule; configurations are separated on the packing list so site teams can match each crate to its installation point.
- Logistics. Freight by sea, air or rail, with customs paperwork, container loading and shipment tracking handled through our logistics coordinators, delivered door to door.
- Installation and after-sales. On-site installation support, inspection with a snag list at handover, then warranty cover, spare parts and maintenance for the equipment in the configuration you ordered.
A practical checklist before you place the order
- Confirm model codes and shell dimensions against each deck location, not just the room name on the drawing.
- List options per unit — heat pump, UV sterilisation, sand filtration, insulation, steps — and record what is excluded.
- Agree the spare-parts allowance with your quotation: nozzles, seals, filter media and standby pumps.
- Get written confirmation of electrical requirements for the final configuration before your electrician sizes the supply.
- Order poolside furniture, pergolas and screens on the same schedule so they arrive in one coordinated delivery.
- Fix delivery dates to civil and electrical completion, unit by unit, if the site is phased.
Send us your unit count, model mix and deck layout and we will return an itemised schedule for the Outdoor Swim Spa WS-S12-T with options, spares and poolside furniture listed against each installation point — through our Turnkey Solutions service. Browse the wider range in Swimming Pools and Swim Spas, or talk to us directly on WhatsApp +86-13928214007 (PHILLIP), email santerson@qq.com.