A glass front shaker cabinet enquiry rarely fails over price. It stalls because the drawing, the door schedule and the glazing notes disagree with each other, so the factory has to ask the same questions twice before it can cut a single panel. If you are sourcing glass front shaker cabinets for a villa, apartment or hotel fit-out, the checklist below is the set of details our estimating team works from. Send it in one pass and you get a quotation that actually matches what arrives on site.

1. The room itself: drawings, not photographs

Mood boards tell us the look you want; they do not tell us whether the run clears a door swing. For a made-to-measure quotation we need a dimensioned layout for every wall the cabinetry touches:

  • Overall run lengths, room height and the finished floor level, including any change of level between kitchen and adjoining space.
  • Positions of skirting, cornices, box beams, downstands and pipework that a carcass has to scribe around.
  • Window reveals, sill heights and the distance from the counter line to the underside of the window head — this decides whether an upper glass unit can be full height or has to be cut down.
  • Appliance schedule with published cut-out dimensions for ovens, fridge columns, wine coolers and extraction, not just appliance names.
  • Drawing format: PDF plans plus elevations, or a sketch scanned from site. DWG is welcome but not required.

Where we are also doing the space planning, our interior space planning and layout design service starts from your brief and produces layouts and 3D renderings before anything goes into production. That route suits projects where the kitchen layout is still moving.

2. Door construction: what "shaker" means on your schedule

Shaker is a family, not one product. Two projects with identical drawings can carry very different door costs depending on how the frame and panel are built and how the glass sits in it. Tell us which of these you are specifying:

Detail to confirmWhy it changes the price
Frame material — MDF, plywood, solid timber or a polymer-wrapped substrateSets stability of the frame around a glazed opening and how well the finish edge holds up in a humid kitchen.
Panel construction — recessed centre panel versus a glazed rebate cut through the whole doorA full glass rebate needs a different rail stile section, glazing beads or a structural glazing bead, and it changes how the handle fixings land.
Rail and stile widths, and whether they match the solid doors in the same runMixed glass and solid doors on one wall only look right when the frame profile is consistent across both.
Finish system — painted, lacquered, foil or vinyl wrapped, with a colour referencePainted and lacquered doors need the glazing bead finished separately; RAL or Pantone codes remove guesswork that photographs cannot resolve.
Interior cabinet finish visible through the glassThe inside face of a glazed door and the carcass interior both show. Specify the colour, shelf material and whether LED lighting is required behind the glass.

If you are still choosing between finishes, our grey shaker cabinets and painted shaker cabinets pages show how the same profile reads in different colours, so you can decide the door style before we price it.

3. The glass: type, thickness, tint and safety

This is where quotations drift furthest apart, because "glass front" means almost nothing on its own. Specify:

  • Glass type — clear float, low-iron for a neutral tone without the green edge, frosted or reeded for partial concealment, or tempered/toughened where local rules and door size require safety glass.
  • Thickness, typically 4 mm to 6 mm in a cabinet door; heavier glass needs different hinges and a stronger rebate.
  • Glazing method — loose beads, structural bead, or a silicone-set captive glazing. This affects both appearance and how a broken pane is replaced on site.
  • Edge treatment — polished flat edge, bevelled, or a profiled edge matched to the door.
  • Opening pattern — which doors are fully glazed, which are half-glazed with a solid lower panel, and whether any unit gets internal glazing bars.
Send one reference photograph of the glass you are trying to match, plus the supplier name or product code if you have it. A code is worth ten photographs; without one we will quote a close equivalent and flag it as an assumption on the quotation.

4. Hardware behind the glass

Glazed doors behave differently from solid ones, so the hardware schedule matters more here, not less. Include:

  • Hinge type and load rating, with soft close or a push-open mechanism, and whether concealed hinges are required for glass doors.
  • Handle choice and hole centres — an inline handle mounted through the frame is common on glazed shaker doors because it avoids stressing the panel.
  • Integrated lighting: LED strip in the shelf profile or top of the carcass, driver location, transformer access point and whether a door switch or motion sensor is wanted.
  • Shelf material and span behind the glass, plus any adjustable versus fixed shelving.

Our custom built-in kitchen cabinets are supplied with matching hinges, drawer slides, support legs and connecting brackets, so the hardware list travels with the carcass rather than being sourced separately on site.

5. Scope, quantities and how the order ships

The commercial details shape lead time and packing as much as unit price:

What to stateEffect on the quotation
Quantity of each door type, by size, in a simple scheduleGrouping identical sizes is what makes a batch economical; one-off sizes carry their own setup.
Whether you order cabinets flat-packed, assembled, or as a full kitchen package with worktopsAssembled units ship at lower container density and cost more in freight.
Delivery port or site address, and the Incoterm you want pricedDetermines whether we quote FOB, CIF or door-to-door under our logistics and door-to-door delivery service.
Phasing — one delivery or staged drops across units or floorsStaged shipments need separate packing, labelling and container planning.
Whether other fit-out trades are in the same order: wardrobes, vanities, joinery, wall panellingConsolidating built-in furniture on one production plan keeps finishes and batch colours consistent.

6. The two documents that prevent most disputes

Before we cut, ask for a signed elevation set with dimensions on the drawing itself, and a door-and-glass schedule that lists every door code, size, finish and glazing type. A purchase order that references those two documents is worth far more than a long email thread, because both sides are then pricing and approving the same thing. Where the project needs manufacturing to your own drawings or your own brand, our custom and OEM service covers prototyping, material and finish selection, and private labelling for contractors and developers ordering across multiple units.

Send us your drawings and door schedule

Forward plans, the glass reference and quantities to SANTERSON and we will return an itemised quotation with the assumptions written out, so you can compare it against competing bids line for line. As a one-stop furniture and building materials supplier, we also price the flooring, wall finishes, lighting and loose furniture around the kitchen in the same package.