A floating TV unit looks simple from across the room: a clean slab of cabinetry hovering above the floor, no legs, no plinth, no visual clutter. That simplicity is exactly why it punishes careless specification. Nothing hides behind a base or a leg, so every dimension, cable route, door type and finish decision sits in plain view. Before we quote a wall unit for an apartment, villa or hotel guest room, we ask buyers to work through the decisions below with us — and the sooner those decisions land on paper, the fewer surprises at handover.
Start With the Wall, Not the Cabinet
A wall-hung unit carries its own weight plus the television, soundbar and hardware into the wall behind it. Solid masonry and timber stud walls behave very differently from light-gauge partitions or tiled bathroom-adjacent walls, and a cavity wall needs different fixings again. Tell us what is behind the plasterboard — substrate type, stud spacing, whether the wall has already been lined or packed — before we talk about cabinet depth.
Then confirm three numbers on site: overall run length available, the height you want the underside of the unit to sit at, and the exact centre line for the screen. If the television position is already decided by a bed layout or seating axis, the cabinet should follow it rather than the other way around. Our floating TV units are made to measure, so there is no standard module to force the wall into — but we need the measurement, not a guess from a floor plan.
Decide How You Will Actually Use It
Storage layout is where most buyers over-order or under-order. Walk through the room and count what has to live in this unit: consoles and set-top boxes, a games library, board games, blankets, documents, glassware, ornaments. Then split that list into three groups — items you want on display, items you use weekly and want easy access to, and items you would rather never see.
- Display zone: open shelves and open display niches, sized around the objects you already own rather than generic shelf heights.
- Daily-access zone: drawers, drop-down doors or open and closed combo units within comfortable reach of the seated position.
- Hidden zone: full-height or flush-front cupboards that read as wall panelling once closed, using hidden cabinets when you want the joinery to disappear.
A useful rule: keep the busiest 400–600mm band around the screen free of heavy doors, and push deeper storage to the ends of the run. If the wall also has to hold books or a media collection, we usually move from a single floating unit toward a full height media wall that carries the screen, storage and display in one composition.
Agree the Cable and Equipment Plan Early
This is the item most buyers leave too late. Cables need a route, not an afterthought: where the power and data outlets land relative to the unit, whether the screen sits on a fixed mount or an articulating arm, and how much slack an arm needs to swing without pressing cables against a cabinet carcass.
- Confirm outlet positions before the unit is manufactured; we can then build in cable cut-outs, trunking channels or a service void behind the carcass.
- Decide whether equipment sits inside the unit. Ventilation and door material matter for anything that generates heat — a closed compartment changes how consoles and amplifiers run.
- If you want remote control through a closed door, tell us at specification stage; the door material affects signal transmission.
- Plan lighting wiring with the joinery, not after it. Our integrated LED media units and backlit feature walls need the driver, switch and dimming arrangement settled before production.
A practical test worth doing: sketch the screen size, soundbar position and one shelf of objects at full scale on the wall with masking tape. Most buyers change their minds about proportions once they see them at 1:1 — and changing a drawing costs nothing compared with changing a manufactured carcass.
Choose Materials and Finishes as a Set
A floating unit reads as part of the wall, so its panel material and edge treatment should match what surrounds it. We supply custom furniture and interior products manufactured to project specification, which means the same board substrate and finish used on your wardrobes, media storage or kitchen cabinetry can carry across into this unit — an easy way to keep a whole apartment or guest-room floor visually consistent.
Points to settle together:
- Panel and edge detail: square edge, rounded profile or a shadow gap between the unit and wall. The shadow gap is a design decision, not a construction default — it changes how the unit reads against the plaster.
- Handle strategy: handleless fronts, integrated pulls or touch-to-open. On a floating unit hardware is very visible, so this choice drives the whole look.
- Glass where you want light through: glass front media units open up a heavy run and let interior lighting work, but they also show what is inside, so pair them with the display zone rather than the clutter zone.
- Finish continuity: if flooring, wall panelling and joinery come from one supplier, tone matching across timber veneer, lacquer or melamine is far easier to control. Our whole-house custom cabinetry projects are built on exactly this logic.
Move Mechanisms and Doors Onto the Agenda
Doors, hinges and runners are usually quoted as an afterthought and should not be. Sliding panels need a track allowance and clearance for the panel to travel; drop-down (bi-fold or lift-up) doors need headroom in front of the unit; soft-close hardware on deep drawers needs floor loading that will not flex under weight. If you want the screen concealed behind joinery, discuss sliding panel TV systems early — the travel distance and track detail change the carcass dimensions.
Coordinate With the Rest of the Fit-Out
On project work, a media wall rarely stands alone. It meets skirting lines, architraves, light switches, air diffusers, curtain tracks and sometimes a fireplace or a stone-clad surround. Each of those interfaces needs an agreed order of works: who sets out first, where the tolerance is absorbed, which trades are on site when the unit arrives.
For apartment blocks, villas and hotel guest rooms, we treat these units as interior fixtures rather than loose furniture — repeated details, consistent finishes, and one production run instead of many separate purchases. That is where buying from a single manufacturer pays back: the same tolerances, edge banding and finish batch across every unit on the floor.
What to Send Us for an Accurate Quotation
- Photographs of the wall plus a simple dimensioned sketch: run length, height, depth you have in mind, and where outlets and switches currently sit.
- Screen size and mounting type (fixed, tilt or articulating arm), plus equipment list with approximate dimensions.
- Your storage split — display, daily access, hidden — and any objects that must fit as-is.
- Finish references from the wider project: flooring, wall panelling, other cabinetry.
- Installation constraints: floor level, lift access, site dates, and whether the wall is finished or still open.
Send those details and we will come back with a layout proposal and drawings before anything goes into production. If you are furnishing several rooms or units at once, ask about bundling the media wall with wardrobes, kitchen cabinetry and custom built-in kitchen cabinets on one project order — coordinated joinery is easier to control when it is manufactured together.
Talk to us about your media wall
SANTERSON manufactures custom built-in furniture and interior fixtures for residential, villa and hospitality projects. Email santerson@qq.com or contact PHILLIP on WhatsApp +86-13928214007 with your wall dimensions and equipment list, and we will prepare a layout proposal and quotation.
All dimensions, materials and hardware arrangements are confirmed per project before production.