Why the Specification Matters More Than the Model Number

The Outdoor Swim Spa WS-PC03 is listed in our catalogue at 3000 × 3000 × 1000 mm, with a control system, one water pump, one filter pump, a jet package of 50 jets including four water columns, LED lighting and ozone sanitation, on a stated total power of 2.75 kW. Those figures are the starting point of a quotation, not the finished specification. Because our swim and hydrotherapy range is configurable, two buyers asking for "a WS-PC03" can receive very different prices depending on what sits inside the shell: heat pump or no heat pump, UV sterilisation, sand filtration, insulation, steps, and how the unit is delivered to site.

A request for quote that states these variables up front lets us return one comparable number instead of a placeholder followed by three rounds of clarifying emails. It also protects you: when the quotation lists exactly what is included, you can compare it line by line against other offers without discovering later that a heat pump or a set of steps was priced separately.

1. Site Dimensions and Access Route

Give us the clear internal dimensions of the prepared pad or recess, not just the room, and say whether the spa is above ground, semi-recessed or fully recessed. State the finished water level you want relative to the surrounding deck. Then describe access: gate width, turning radius, stair runs, overhead obstructions such as pergola beams or power lines, and whether a crane or forklift is available at the property. A 3000 × 3000 mm shell that fits on a plan can still be a difficult lift over a boundary wall, and access problems change both the packing method and the freight cost.

2. Electrical Supply Available at Site

Total power is the figure most buyers quote, and it is the one that needs confirming against your supply. The catalogue lists 2.75 kW for this model; adding a heat pump or changing pumps changes the load. Tell us your available service — single phase or three phase, voltage, frequency, the rating of the circuit you intend to use, and the distance from the breaker panel to the spa. Also state who is responsible for the dedicated circuit, isolator and residual-current protection at site. We will confirm the electrical requirements for the exact configuration we quote, because these vary between configurations.

3. Equipment Inclusions and Options, Item by Item

Ask for the quotation to separate standard inclusions from options, so nothing is assumed on either side. For this range the catalogue-listed options include control systems, UV sterilisation, water pumps, heat pumps, sand filtration, insulation and steps. State which of these you want priced, and which you want excluded, and ask us to price any accessory you expect to need later — an additional step set or a spare jet, for example — so you know the cost before the container is loaded.

Two points are worth raising in writing. First, the catalogue entry for WS-PC03 leaves the swim training system unlisted, while other models in the same range — such as Outdoor Swim Spa WS-PC05ST-L at 5490 × 2400 × 1470 mm — are listed with one. If counter-current swimming is part of your brief, say so in the RFQ: the answer may be a different model rather than an add-on to this shell. Second, jet count and jet type change the pump duty, so ask us to show which jets are water jets, which are the four water columns, and what pumps drive them.

4. Intended Use and Duty Cycle

A private villa terrace and a hotel, resort or clubhouse pool deck place different demands on the same shell. Tell us the expected daily running hours, whether the water is heated year-round or seasonally, the number of simultaneous bathers, and whether the space is publicly accessible. That information drives the filtration and sanitation package you should be quoted — ozone is listed as a feature for this model, with UV sterilisation available as an option across the range — and it shapes the insulation specification, which is where running cost is won or lost.

If your project also needs the rest of the outdoor area furnished, poolside loungers, cabana daybeds and pergolas can be quoted together with the spa. As a one-stop furniture and building materials supplier, we coordinate those items on one production and shipping schedule rather than as separate shipments from separate vendors.

5. Quantity, Phasing and Site Programme

State the quantity you need and whether the units are for a single site or several. For multi-unit or staged handovers, give the required on-site date for each batch. Our Custom & OEM Service covers flexible minimum order quantities and bespoke finishes, so if you need a different shell finish, matching deck furniture in the same palette, or your own branding on the packaging, include that in the RFQ instead of raising it after the order is confirmed.

6. Delivery Terms and Documentation

Tell us the delivery address, whether you want port-to-port or door-to-door, and which Incoterms you expect to be quoted. Our Logistics & Door-to-Door Delivery service covers freight forwarding by sea, air and rail, packaging and container loading, shipment tracking and customs paperwork such as commercial invoices, packing lists and certificates of origin. Import duties, local permit requirements and final-mile arrangements are confirmed case by case for each destination, so name the country and port in the request rather than leaving them open.

7. Installation, Handover and After-Sales Expectations

Say who will install and commission the unit. If you want our team involved on site, we can quote that under our Installation & After-sales Support service, which covers on-site installation, inspection and snag lists, warranty coverage, spare parts and ongoing maintenance. If a local contractor will install the spa, ask us for the setting-out drawing, connection schedule and commissioning instructions in writing, and confirm what support you get during commissioning.

A Simple Structure for the Request

Write the RFQ as a short list under these headings: project location and access; pad or recess dimensions and installation type; available electrical supply; required equipment inclusions and exclusions; intended use and daily running pattern; quantity and delivery programme; delivery terms, destination port or address and documents required; installation responsibility. Attach drawings or photographs of the site where they save a question.

Send us that information and you will receive a quotation with the configuration stated line by line, a specification sheet for the exact build, and a clear note of what is excluded — which is exactly what you need in order to compare offers on equal terms.