A floating vanity rarely fails on its own. It fails where it meets the wall, the basin, the mirror, the lighting and the delivery schedule. If you are specifying the Santerson Floating Vanity for a villa, serviced apartment or hospitality fit-out, the work that decides the outcome happens before any panel is cut: counting the units properly and locking down how every related product lines up with them. This guide walks through both, in the order a buyer actually needs them.
Start With a Room-by-Room Count, Not a Total
The most common ordering mistake is a single total for the whole project — "40 vanities" — handed over without a breakdown. Bathroom types differ, and so do the wall conditions behind them. Build the quantity list per room type first, then group identical rooms into one specification.
- Guest and powder rooms: usually the shortest runs, but the tightest clearances. Count each separately even if the layout repeats, because wall finishes and door swings differ.
- Master and ensuite bathrooms: these drive the long vanities and the mirror, lighting and storage decisions that cascade into other trades.
- Staff, utility and laundry bathrooms: often specified last and then ordered in a rush. Include them in the first count or they arrive on a second, more expensive shipment.
- Duplicated layouts across floors or wings: list them as one line item with a quantity, but confirm that floor levels and finished wall lines are actually identical before you assume it.
For each line, record the room number, the clear wall length available, the height of the finished floor, and whether the wall behind the unit is solid, framed or clad. A floating vanity carries its load back into that wall, so the substrate decides the fixing method — and a late discovery here means site modifications after delivery.
What You Need to Lock Down Before Production
Santerson's vanities are made-to-measure: sizing, material and finish options, and layout are specified per project rather than chosen from a fixed catalogue width. That flexibility is the advantage and the risk. Every open decision becomes a change order later, so close these items on paper before the order is released.
| Decision | What to confirm | Why it matters downstream |
|---|---|---|
| Unit width and projection | Finished clear wall length, plus allowance for adjacent doors, niches and skirting | Determines cut-out positions for the basin and the tap tail locations in the wall |
| Mounting height | Top-of-counter height relative to the finished floor level, not the structural slab | Fixes the drain and supply outlet heights your plumber needs on site |
| Material and finish | Board substrate, surface finish and edge detail for each room type | Bathrooms with showers or high humidity need a different build specification than powder rooms |
| Storage layout | Drawer stack, open shelf or closed cabinet behind each basin position | Avoids drawers fouling the pipework and the wall-mounted WC frame |
| Wall substrate and fixings | Solid, framed or clad wall; blocking or reinforcement where needed | Decides whether on-site carpentry must be scheduled before delivery |
Keep one master schedule for the whole project — a single sheet listing every vanity line with its room, size, finish and status. When three people are approving finishes, colour and dimension changes will otherwise travel by email and arrive at the factory in different versions.
Coordinate the Products That Touch the Vanity
The vanity unit is only one line on the purchase order. The items that meet it — basin, countertop, mirror, lighting, storage — have to be specified together, because each one inherits dimensions from the unit above.
Basin and countertop
Choose the basin type before finalising the counter. An undermount basin needs a cut-out in the counter and clear access below it; a vessel basin sits above the counter and changes both the deck height and where the tap lands. Where the counter and vanity are ordered as one package, as with the Santerson Integrated Countertop Vanity, the cut-out is resolved in production rather than on site — which removes a wet-trade step but means the basin choice must be fixed earlier.
Mirror and storage above the unit
A mirror cabinet does double duty as lighting and storage, so its width should relate to the vanity below rather than sit independently on the wall. The Santerson LED Mirror Cabinet carries an electrical supply, which means the cable outlet has to be set before the wall is closed up — after the vanity width and mounting height are confirmed, not before.
Vanity lighting
Where a mirror cabinet is not used, vanity lighting should be scheduled with the same dimensions and finish references as the unit itself. Fix the fitting type before the electrical drawings are issued so first-fix cabling lands in the right place.
Storage beside the unit
A floating vanity gives up floor storage, so plan for it next door. A tall linen cabinet or wall-mounted cabinet in the matching finish recovers that capacity and keeps the bathroom reading as one designed set instead of a mix of unrelated items.
Ordering Sequence: One Release, Not Four
Coordinating quantities means ordering related products together rather than in whatever order each department finishes its selection. A practical sequence:
- Stage 1 — envelope first. Confirm wall substrates, finished floor levels and the positions of all sanitary outlets. Nothing else can be fixed until these are stable.
- Stage 2 — vanity lines. Release sizes, finishes and internal layouts for every room type as one batch, so identical rooms share one production run.
- Stage 3 — what touches the vanities. Basins, countertops, mirror cabinets and lighting in a single release against the same schedule, using the confirmed unit widths and heights.
- Stage 4 — complementary storage and finishes. Tall cabinets, wall cabinets and matching panelling, specified to the same finish references.
Grouping releases this way also improves how the shipment arrives. Santerson handles freight forwarding by sea, air and rail with customs paperwork, packaging and container loading arranged as part of logistics and door-to-door delivery. When related items ship together on one packing list, site teams unpack by room instead of chasing components across three deliveries — and short or damaged items surface while there is still time to act.
Build the Quantity Sheet So Installation Is Not Guesswork
A quantity sheet that only lists unit counts leaves installation teams to work out the rest. Add these columns and the handover becomes straightforward:
- Room reference and line number — so every crate can be matched to a room on site without re-reading the drawings.
- Finished width, projection and mounting height — measured from the finished floor level.
- Finish code and material note — one reference used consistently across cabinets, mirrors and panelling.
- Basin and counter pairing — which basin type each unit is cut for.
- Electrical note — which lines carry an LED mirror cabinet or vanity light, and where the outlet sits.
- Fixing note — wall type and required reinforcement per line.
Issue that sheet to the factory, the plumber, the electrician and the installer. Four trades working from one document is what keeps a made-to-measure programme on schedule; four trades each holding their own version is where the delays come from.
What to Confirm Before You Sign Off
- Every vanity line has a room reference, and no duplicated layout was assumed identical without checking levels and wall lines.
- Wall substrates and reinforcement are confirmed for each mounting position.
- Basin type, counter cut-out and tap outlet heights are agreed on one drawing per room type.
- Mirror cabinets and vanity lighting appear on the electrical first-fix set at the confirmed heights.
- Matching storage is included where a floating unit removes floor capacity.
- Related products are released in coordinated batches, with one master schedule as the single source of truth.
If you want a single supplier to carry the vanities and everything coordinated around them — cabinetry, basins and countertops, mirror cabinets, lighting, wall panelling and flooring — turnkey project solutions cover design coordination through production, delivery and installation. That is where careful quantity planning pays for itself: one schedule, one production programme, one delivery.