A swim spa submittal is the package a buyer, consultant or contractor reviews before approving an outdoor swim spa for a villa, resort or clubhouse project. For the Outdoor Swim Spa WS-S12, that means more than a brochure page: the file has to show what is being supplied, how it fits on site, what services it needs, and who handles delivery, installation and after-sales. Below is the checklist we use when preparing submittals for this model, together with the points that most often cause an approval to be returned.
1. Cover sheet: project identity and scope of supply
Start with one page that lets a reviewer identify the package without opening the rest of the file. It should state the project name and location, the buyer or main contractor, the consultant reviewing the submittal, the model reference (WS-S12), the quantity, and an explicit scope-of-supply list separating what is included from what is supplied by others.
For this model the catalogue lists a control system (1 set), water pumps (2 pcs), a filter pump (1 pc) and jet total (73 pcs). A swim training system is not listed for WS-S12 in the catalogue specifications we work from; it appears on the related WS-S12-T variant. If a project requires swim contra-flow training, that difference has to be settled before the submittal is issued, not after order confirmation.
2. Dimensioned drawings and site clearance
The catalog dimensions for WS-S12 are 11740 × 2200 × 1470 mm. The submittal should repeat those figures on a dimensioned drawing rather than in marketing text, and show the reviewer three things that product photos never answer:
- Clearance around the shell for access, maintenance and any steps or seating;
- The relationship between the water line, the coping or deck finish, and the surrounding paving level;
- Access route and lifting/positioning space for delivery to the prepared slab or plinth.
Where the spa sits on a terrace, podium or partially sunken deck, ask for a section drawing that shows the support arrangement. We can prepare drawings to the project's setting as part of interior design and project coordination.
3. Equipment schedule and options actually selected
A common reason for a returned submittal is an equipment list that does not match the quotation. Attach a schedule with one line per item — quantity, whether it is standard or optional, and the reference to the catalogue entry it came from — then cross-check every line against the purchase order before issue.
For WS-S12 the catalogue entries to carry across are: control system (1 set), water pump (2 pcs), filter pump (1 pc), jet total (73 pcs), LED lighting (1 with 50 small LED lights) and a total power figure of 7.65 kW, with the features shown as water jets, LED lighting and ozone. Write them out in the buyer's own table format rather than pasting our specification block, so that each line can be initialled by the consultant.
Catalog-listed options for this range include control systems, UV sterilization, water pumps, heat pumps, sand filtration, insulation and steps. Availability and compatibility vary by model, so the submittal should show only the options confirmed for the selected configuration, and mark anything excluded in writing.
4. Electrical, water and drainage requirements
The total power figure of 7.65 kW is what the submittal must translate into site services. Provide the electrical requirement for the selected configuration — supply voltage, phase, dedicated circuit sizing, protective device and bonding — so the project electrician can plan the board before the shell arrives. Confirm included equipment and electrical requirements for the selected configuration with the supplier; do not let a reviewer infer them from a standard specification sheet.
Cover water fill and top-up, drainage for emptying and servicing, and where plant such as the filter pump and heat pump (if selected) will be located and how it will be reached. For resort and clubhouse installations, this is also where maintenance access and spare-parts access get designed in rather than improvised later.
5. Materials, finishes and visual approval
Include the shell and cabinet finishes, jet and trim colours, lighting appearance, and any steps or cover options, with photographs or finish samples referenced by code. Hospitality buyers usually approve visuals before they approve technical data, so a submittal that pairs finish references with the equipment schedule avoids a second review cycle.
Because swim spas are frequently procured alongside other outdoor and wellness products on the same package, cross-reference related items in the file — for example the Swimming Pools and Swim Spas range, or poolside pieces such as the Modern Aluminum Outdoor Dining Set & Sun Lounger — so that finishes and materials are consistent across the outdoor area.
6. Packaging, logistics and delivery plan
Attach the packing method, container loading plan, shipping terms and expected delivery point. Our logistics and door-to-door delivery service covers freight forwarding by sea, air and rail, customs paperwork, packaging and container loading, shipment tracking and delivery to site. Import terms, duties, insurance and transit time are quoted case by case for each destination, so the submittal should state the agreed Incoterms and delivery point rather than a generic promise.
7. Installation method statement and after-sales terms
Close the file with an installation method statement: positioning, levelling and support, connection of power, water and drainage, commissioning of pumps, jets, ozone and lighting, and a snag/inspection list for handover. Then state what happens after handover — warranty coverage, spare parts and replacement, and ongoing maintenance — as set out under installation and after-sales support. Warranty terms, response times and exclusions should be written into the submittal for the specific order; site marketing copy is not a substitute.
8. Approvals, sign-off sheet and revision record
End with a one-page sign-off block: consultant comments, revision number, date, and who issued each version. Submittals that carry a clear revision history get approved faster because the reviewer can see which comment was answered in which revision.
Frequently asked questions
What is the difference between WS-S12 and WS-S12-T?
Both share the same catalogue dimensions of 11740 × 2200 × 1470 mm and the same listed pump, jet, lighting and power figures. The WS-S12-T listing additionally shows a swim training system (1 set) among its features; the WS-S12 listing does not. Confirm which variant is being quoted.
Can options be added after the submittal is approved?
Options such as heat pumps, UV sterilization, sand filtration, insulation and steps should be fixed before approval, because they change electrical load, plant location and clearance. Adding them later normally means re-issuing the equipment schedule and the electrical requirement.
Who prepares the drawings?
We prepare dimensioned drawings and coordinate them with the project's setting as part of the turnkey project solution workflow, which runs from consultation and design through production, logistics, installation and after-sales.
Send us the model reference, quantity, delivery point and destination country, and we will return a WS-S12 submittal pack with the equipment schedule for the selected configuration, dimensioned drawings, electrical requirements and a delivery plan. As a one-stop furniture and building materials supplier, SANTERSON also packages swim spas with the surrounding outdoor furniture, paving-adjacent finishes, lighting and interior fixtures for villa and hospitality projects.