A seven-metre swim spa is not a parcel. When the order is Outdoor Swim Spa WS-PC07A-T, the shell, the plant room equipment and the site preparation all have to arrive in the right sequence, at the right address, with paperwork that clears customs without sitting in a bond. Below is how we structure a project order for this model from enquiry to handover, so your site team knows what to expect at each stage.
Start with the configuration, not the freight booking
The catalog specification for WS-PC07A-T is the starting point for both production and transport planning:
Jet total: 56 pcs · Water pump: 1 pcs · Filter pump: 1 pc
Swim training system: 1 set · Control system: 1 set
LED lights: 4 · Total power: 11.55 kW
Features shown: water jets, LED lighting, ozone
Options from the same catalog list — UV sterilization, additional water pumps, heat pumps, sand filtration, insulation and steps — change both the electrical load and the number of packages in the shipment. Heat pumps and sand filters are bulkier items that need their own crating alongside the shell, and insulation affects how the spa is wrapped for a long sea leg. Confirm the option list before we quote freight, because a revised option list after booking usually means re-packing and a second leg.
Total power is also a site question rather than a factory one. An 11.55 kW connected load needs a dedicated supply, correctly sized protection and an electrician on site who works to the wiring rules of your country. Send us your available supply — single or three phase, voltage, breaker rating — with the enquiry, and we will confirm what the selected configuration requires before production starts.
Site preparation has to run in parallel with production
The most common delay on a swim spa project is not the vessel; it is a slab that is not ready. A 7000 × 3000 mm shell needs a level, properly reinforced base sized to the finished footprint, plus space around it for the plant access and for the steps if ordered. Drainage, an overflow route and a location with crane or forklift access all need decisions while the spa is still in production.
- Confirm the finished external dimensions against your approved drawings, including cladding, coping and any deck edge that overlaps the shell.
- Keep the delivery route clear: gate width, turning radius, overhead cables and the ground bearing capacity of the access road.
- Decide early whether the spa is above ground, semi-recessed or recessed — this changes both the packing sequence and the crane requirement.
- Name one decision-maker on your side. Split responsibility between builder, landscape contractor and pool subcontractor is where specifications get lost.
Packing and container loading for a spa of this size
A shell at 7000 mm long does not fit standard pallet racking, so the load plan is drawn per order. We prepare packaging and container loading as part of furniture logistics and door-to-door delivery: crating sized to the shell, protection for the acrylic surface, separate crates for the control system, pumps, jets and lighting, and a packing list that your receiving team can check item by item against the order.
Sea freight is the normal choice for this category. Air freight is rarely practical for a seven-metre shell, and rail may suit some inland destinations in parts of Asia and Europe. Tell us the delivery address and we will propose the port of discharge, the inland leg and whether the last mile needs an oversize-permit vehicle.
Customs paperwork you should expect to receive
Import problems are usually document problems. For each shipment we prepare commercial invoices, packing lists and certificates of origin, and we support the import permits your country requires. Your side still owns the local obligations: import classification, duty and GST or VAT, Incoterms on the quotation, and cargo insurance if you want cover beyond our liability.
- Read the Incoterms on the quotation carefully — EXW, FOB and CIF place responsibility for freight and insurance in different hands.
- Appoint a customs broker before the vessel sails, not after it arrives.
- Check that the consignee name on the documents matches your registration exactly.
- Keep the packing list with the goods at the delivery address; unloading a spa against an incomplete list causes claims you cannot substantiate later.
Unloading, installation and commissioning
Once the container lands, the sequence is position the shell, set the plant, connect power and water, then commission the jets, filtration, ozone and lighting together. Our installation and after-sales support covers on-site installation, inspection with a snag list, warranty coverage, spare parts and ongoing maintenance. For overseas projects we agree in advance which tasks your local contractors handle and which we cover, so nobody arrives on site expecting someone else to do the electrical work.
Book the commissioning date at the same time as the delivery date. A spa sitting positioned but uncommissioned is a safety hazard and an open item on your project programme.
Where this model sits in a wider project order
Swim spas are frequently part of a larger villa or resort package — outdoor lounge sets, pergolas and loungers for the surrounding deck, bathroom fixtures and wall finishes for the changing area. Ordering them together under one turnkey interior project solution means one production schedule, consolidated shipments and a single point of contact from design through handover, instead of five suppliers each chasing their own delivery window.
If the standard footprint does not suit the site — a terrace with an irregular plan, or a spa well integrated into a landscape feature — our customizable shape outdoor spa covers square, round, oval and curved configurations in an acrylic shell.
- Site address, and whether the site is residential, resort or a new build still under construction
- Above ground, semi-recessed or recessed installation
- Available electrical supply: phase, voltage, breaker rating
- Option list from the catalog accessories, confirmed internally
- Your preferred port of discharge and delivery address for the final leg
- The name of your customs broker and, if applicable, your main contractor
Specifications quoted above are transcribed from the published catalog entry for WS-PC07A-T. Included equipment, electrical requirements and option compatibility are confirmed against the selected configuration at quotation stage.
Share the site drawings, your electrical supply and the option list you want, and we will return a configuration confirmation, a packing and freight plan and a delivery schedule for Outdoor Swim Spa WS-PC07A-T. Contact PHILLIP on WhatsApp +86 13928214007 or email santerson@qq.com, or use the contact page.