Wall panels are one of the few finishes you cannot fully judge from a catalogue image. A reflective glass surface and a deep glossy lacquer both photograph beautifully, yet in a real room they behave very differently under lights, fingerprints and daily handling. If your project is considering Santerson Glass & Glossy Panels, the practical question is not whether the finish looks good — it is whether the sample you approve and the proposal you sign describe the same wall. The checklist below shows what to request, what to compare side by side, and where buyers most often get caught out.
Start With the Scope You Are Actually Buying
Paneling in this range is made to measure. Finish, layout and dimensions are specified per project rather than ordered from fixed sizes, so a quotation that omits scope details cannot be compared fairly with another one. Before you ask for pricing, write down the same brief for every supplier you approach:
- Room by room panel areas, with heights and any ceiling-to-floor runs called out.
- Openings and interruptions: doors, switch plates, televisions, mirrors, integrated lighting.
- Substrate condition on site — flatness, moisture, and whether a framing or fixing system is needed.
- Edge details: where panels meet skirting, reveals, cornices, corners and adjacent materials.
- Whether the wall also carries storage or media, which may pull the work into full height storage walls rather than a decorative panel run.
A proposal built on this brief can be compared line by line. A proposal built on "supply and install feature wall" cannot, which is why two quotations for the same room often differ by more than they should.
What a Useful Sample Should Include
Ask for physical samples rather than printed brochures or screen visuals, and request enough of each candidate finish to judge it properly. For glass and glossy panels specifically, a usable sample pack covers the following:
- Full-size or near-full-size pieces. Glossy and reflective surfaces shift dramatically with scale. A 100 mm swatch tells you almost nothing about how a two-metre panel will read against a window.
- The actual edge treatment. Ask for a sample that shows the finished edge, not just a cut face. Edge profile, arris and any frame or trim detail are where cheap and quality installations look different from two metres away.
- The backing and fixing method. Request confirmation of how panels attach to your wall, what tolerance they bridge, and whether the fixing system is included in the price or priced as an extra.
- Every finish option you are being quoted. If a proposal offers two gloss levels or several lacquer colours, each one needs its own sample. Comparing one physical sample against a colour chart for the others invites disputes later.
Then test the samples in the room, not in the office. Site them on the actual wall, view them at night under your designed lighting, and check reflections from windows and downlights. Glossy surfaces amplify light sources; a finish that looks warm and even under showroom lighting can pick up glare and every mark from a hand in a hallway.
Compare the Paneling Systems Collection Side by Side
Most projects that start with "we want a glossy wall" end up choosing between several finishes in the same collection. Put samples of these on the same board and let the client choose with their eyes open:
| Finish | What to look for in the sample | Best suited to |
|---|---|---|
| Glass & Glossy Panels | Depth of reflection, clarity of colour under artificial light, visibility of fingerprints and edge polish. | Feature walls, wardrobes and joinery fronts where light and depth are wanted. |
| Matte Lacquer Panels | Uniformity of the surface under raking light, and how the finish reads next to metal and stone. | Bedrooms, studies and long runs where glare control matters more than shine. |
| Stone & Marble Panels | Vein direction and repeat between sample pieces, surface texture, joint treatment. | Lobby, lounge and bathroom-adjacent walls where a natural look anchors the scheme. |
| Acoustic Panels | How much sound absorption is claimed for the build-up, and how the face finishes with hard surfaces nearby. | Media rooms, boardrooms, open-plan living and office fit-outs. |
| Glass Sliding Panels | Track quality, panel weight in the hand, glass type and any safety specification. | Closet fronts, room dividers and walls that need to open up. |
Product pages in this collection list made-to-measure sizing with material and finish options. Materials, dimensions and technical performance are confirmed for the chosen configuration, so treat any comparison table — including the one above — as a starting point for your specification rather than a substitute for it.
Read the Proposal for What Is Missing
Once samples are approved, compare proposals against a fixed list. The items below are where paneling quotations most often diverge:
- Site verification. Who takes the final dimensions — you, or the supplier's team on site? Made-to-measure work only performs when measurements come from the finished wall, after flooring and plaster are complete.
- Panel build-up. Panel thickness, substrate, and the make-up of any backing battens or framing. Two panels that look identical in a sample can sit on very different build-ups at very different prices.
- Cut allowances. Openings, corners, scribes and site trims are usually charged separately. Ask for these as line items rather than an allowance figure.
- Fixing and finishing hardware. Adhesive, mechanical fixings, trim profiles, silicone or joint cover — confirm what is included.
- Lead time measured from which milestone. Production typically starts after drawings are signed off, not after the order is placed. Ask for the schedule in stages: drawing issue, approval, production, shipment, installation.
- Delivery scope. For cross-border procurement, clarify who handles freight, customs clearance and door-to-door delivery, and which Incoterms apply to your site. The services a supplier lists on their website are not the same as the terms written into your proforma invoice.
- Installation responsibility. Whether panels ship flat-packed for local fitting or arrive with an installation team, plus who rectifies snags afterwards.
- Warranty wording. What is covered, for how long, and what is excluded — especially for reflective surfaces where handling damage is common.
Match the Sample to the Drawing Before You Sign
The single most effective control is a sign-off pack. Ask the supplier to issue shop drawings that show each wall with panel sizes, joint positions, edge details and the approved sample reference printed on the drawing. Then check three things:
- The sample number or finish name on the drawing matches the sample you physically approved.
- Panel joints fall where you expect them, not where cutting is most convenient.
- Reflections and light fittings are drawn, so a glossy panel is not specified opposite a downlight that will glare straight into the eye.
Where the wall carries more than decoration — a television, storage, or a concealed door — bring those elements into the same drawing. Integrated wall panel systems are far easier to coordinate when one set of drawings governs the whole elevation than when three trades each work from their own detail.
A Simple Scoring Method for the Final Decision
When two or three proposals survive the checks above, score them on five points you can verify rather than on impression:
- Sample fidelity — does the delivered sample match the drawing reference exactly?
- Specification completeness — build-up, fixings, edges and cut allowances all priced as line items.
- Scope clarity — measurement, delivery terms and installation each assigned to a named party.
- Schedule credibility — milestones stated from drawing approval through to handover.
- After-sales position — warranty scope, spares availability and who attends site for rectification.
The proposal with the lowest price frequently scores worst on scope clarity, and paneling is expensive to correct once manufactured. A marginally higher quotation with a complete specification usually costs less overall.
Before you enquire
Send the same three documents to every supplier: your room dimensions, a finish shortlist with the sample references you liked, and a note on what each wall must do — decorative, storage, acoustic or sliding. Suppliers quote faster and more accurately when the brief is identical, and your comparison stays honest.
Santerson is a China-based manufacturer and one-stop supplier of furniture and building materials, producing glass, glossy, matte lacquer, stone and acoustic paneling to project dimensions with material and finish options selected per project. Send your wall elevations and finish shortlist, and the team will confirm dimensions, build-up and configuration for each room before production begins.
Enquiries: Contact Santerson