Why This Finish Needs Its Own Specification Sheet

A matte acrylic door panel is one of the easiest surfaces in a bedroom fit-out to get wrong, and one of the hardest to argue about afterwards. Two identical-looking units can differ in sheen, edge treatment and how the surface behaves under bedside lighting, and by the time the cabinetry is on site the conversation becomes commercial rather than technical. That is why matte acrylic wardrobes deserve a dedicated documentation pack in any project that specifies them, whether the order covers one villa bedroom or a repeatable guest-room type.

The good news is that the record you need is not complicated. It is mostly plain language, photographs and sign-offs captured early, while changes are still cheap. Below is the documentation checklist we use at SANTERSON when a project team asks us to price and build these wardrobes, organised in the order the information actually becomes available.

1. Confirm the Substrate Before You Argue About Colour

On our catalogue the product sits in the acrylic wardrobe family, and the entry states what can be specified: made-to-measure sizing, material and finish options, and a layout tailored to the project. It does not fix a board thickness, a core material or a hardware brand, because those are decided per project. Procurement teams should therefore treat the catalogue page as a starting point and record the actual build-up in their own document.

For each wardrobe type on the project, note:

  • the door panel construction being quoted, including the core board and how the acrylic face is applied;
  • the carcass material and its thickness, and whether it matches or differs from the doors;
  • edge treatment on all four sides, since a visible joint line is the most common source of complaint on matte fronts;
  • the interior finish of the carcass panels that face outward in an open layout.

Where a project mixes families — for example matte acrylic doors in the bedrooms and matte acrylic cabinets in the kitchen — record them as separate line items. Different rooms invite different build-ups, and a single combined note is how mismatched edges appear at handover.

2. Lock the Sheen and Colour With Physical Samples

"Matte" is a range, not a value. Two suppliers can both deliver a matte surface and produce noticeably different light reflection, and the difference becomes obvious once panels are installed side by side under the room's own lighting.

Do not close a colour decision on a screen, a PDF or a small corner offcut. Approve a full-size door sample, viewed in the actual room, before production release.

What to keep in the file for each approved colour:

  • a dated reference number for the sample, plus the name both sides used in correspondence;
  • photographs of the sample at an angle, so the light behaviour is on record and not just the hue;
  • a written note of which side signed it off, and on what date;
  • the retained physical sample itself, stored on site or with the consultant, because a replacement order will be matched against it.

If the project uses several rooms with different orientations, ask for the sample to be checked in more than one of them. A soft grey that reads warm in a north-facing bedroom can read flat and cold in a corridor.

3. Document the Layout, Not Just the Elevation

A wardrobe elevation shows what the client sees; it does not tell the factory how the unit behaves. Because these wardrobes are made to measure, the internal arrangement is part of the price and part of the performance.

Item to recordWhy procurement needs it in writing
Overall width, height and depth for every unit, with clear and rough opening dimensions stated separatelySite openings change. Written clear-opening figures let you check a revised measurement without re-reading the whole drawing set.
Door type per unit: hinged, sliding or openDoor hardware drives cost, clearance and delivery lead time, and it is often value-engineered late in the programme.
Internal configuration — hanging rails, shelves, drawers, pull-out accessories, lightingAccessories are frequently quoted as options; listing them prevents a quiet downgrade between order and invoice.
Skirting, cornice, architrave and floor finish allowancesCabinetry that has to scribe around an existing skirting needs a different build than a new-build opening.
Handling and access notes: lift size, stair width, delivery windowFull-height panels are constrained by the building, not the factory. This belongs in the order file, not a site conversation.

Where the design intent is closer to an open or display arrangement than a closed built-in, cross-check it against the wider wardrobe range rather than assuming one family covers both. The catalogue lists hinged, sliding, corner, walk-in and open configurations as separate families, each with its own build logic.

4. Record the Care and Handling Assumptions

Matte acrylic fronts are forgiving in daily use but they are not indifferent to how they are cleaned and protected. Put the handling instructions in the project documentation before handover, so the maintenance team is not improvising.

  • state what cleaning materials are acceptable, and name what must be avoided — abrasive pads and solvent-based cleaners are the usual culprits;
  • agree who protects the fronts during the remaining site trades, and when that protection comes off;
  • note how fingerprints, scuffs and any on-site damage will be assessed, photographed and reported;
  • record which party inspects the units at handover, and against which approved sample.

This section is short, but it is the one that saves an argument eighteen months later when a maintenance contractor has cleaned a panel with the wrong product.

5. Keep the Commercial Terms Attached to the Technical File

Technical and commercial records drift apart in most projects, and the gap is where disputes grow. For each wardrobe type, keep the following in the same folder as the drawings and sample approvals:

  • the quotation reference, with what is included and what was excluded;
  • which options were confirmed at order — finish, hardware, interior accessories — and which were declined;
  • how variations to size or layout will be priced after release;
  • packing specification and container or shipment grouping, particularly where wardrobes travel alongside other joinery and one-stop furniture and building materials for the same project;
  • the inspection point before dispatch, and who signs it off.

If the order sits inside a wider package — bedroom joinery, kitchen cabinets, doors, wall panelling — then the wardrobe documentation should say so. A single consolidated procurement schedule is easier to defend than several separate trade files.

6. How This Fits Our Own Process

We manufacture and supply for villa, hospitality and office projects, and the wardrobe file above mirrors the stages we run on any package: brief and design, quotation and detail confirmation, then production, logistics and installation support. For custom work, our custom and OEM service covers bespoke finishes and dimensions, which is exactly where the documentation matters most — a non-standard finish has no catalogue image to fall back on.

Project references we have published include villa work in Willoughby, Perth, North Turramurra, Melbourne and Sydney. Scope details are on each case page rather than summarised here, so read them for the kind of joinery we handle, not as a promise about your particular programme.

A Practical Starting Point

If you are preparing an enquiry and want the matte acrylic wardrobe conversation to start at the right level, send three things: the room elevations with clear-opening dimensions, the door type you expect for each unit, and your intended interior configuration. We will come back with a build-up, a sample request and a priced specification you can drop straight into your own schedule — no need to translate it first.

Figures, board thicknesses and hardware selections are confirmed per project; the product page lists made-to-measure sizing, material and finish options and a project-specific layout, so treat any number in a quotation as the controlling record for your order.