A door schedule tells the site team where each leaf goes. It does not tell anyone what they are buying. The submittal does that, and for made-to-measure interior doors it is the document where mistakes get caught before production starts rather than after installation. Below is the package we ask buyers, contractors and designers to prepare around Santerson Decorative Interior Doors, together with what our own team returns at quotation stage so both sides are working from the same sheet.

A note on scope: decorative interior doors in this range are made to measure, with finish, layout and dimensions specified per project. The product page carries a configurable overview rather than a fixed technical datasheet, which is precisely why the submittal has to be written for the individual order instead of lifted from the last job.

1. Opening sizes and the tolerances behind them

Send finished opening dimensions for every position — width, height and wall build-up depth — taken after the floor screed, plaster and any tiling are complete. A nominal storey height is not a door height.

  • The dimension datum you used, and whether the measurement includes floor finish.
  • Out-of-plumb or out-of-square conditions in the opening, with the measured deviation.
  • Wall construction: masonry, stud and lining, or a steel frame — this determines the frame and fixing detail.
  • Whether you want us to manufacture to the supplied opening or to a lined opening you will prepare.

We return dimension drawings for each leaf and frame and ask you to countersign them. Every door in this collection is made to measure, so the signed drawing becomes the production reference.

2. The door schedule: one line per position

Keep it short enough that the site team actually reads it. A workable schedule carries a position number keyed to the plan, leaf size, single or double leaf, hinge hand and which way the leaf swings, the collection variant, and the finish reference. Position numbers should match the drawing you issue to the site; when submittal numbering and setting-out numbering disagree, leaves end up on the wrong floor.

Within our Windows and Doors range, decorative interior doors sit alongside flush interior doors and standard interior hinged doors. When a project mixes them — decorative leaves in the public areas, plain hinged leaves in back-of-house — record that in the schedule, because frame detail and the architrave decision change with each type.

3. Finish, veneer and lacquer references

"Oak, natural" is not a specification. Give us the decorative surface, the cut, the grain direction where it matters, and the sheen level for the lacquer. Where the door face continues into adjacent joinery, specify that early: doors can be matched to Wood Veneer Panels and to veneer cabinetry in the same order, which keeps grain and colour consistent across the wall. Put this in the submittal rather than leaving it to sample stage.

  • A physical sample reference, or a stated tolerance if you are matching an existing site finish.
  • Which faces of the leaf are visible — both faces on a corridor door, one face where a leaf sits inside a reveal.
  • Edge treatment and whether the leaves are to be lacquered before or after fitting on site.
  • For concealed and handleless variants in the same wall line, how the decorative leaf is meant to read against the paneling around it.

4. Hardware interface and ironmongery schedule

You do not have to buy ironmongery from us, but the submittal must state who is supplying it and what the leaf has to be prepared for. Door leaves are machined to suit the hardware you name, so late changes to lock body backset or hinge pattern mean rework.

Item to specifyWhy it belongs in the submittal
Hinge type, count and finishDetermines leaf thickness, mortice depth and whether the hinge line is visible.
Lock or latch body, backset, and cylinder formatMachining is cut to the named body; substitutions change the bore.
Handle, pull or recessed actionDecides whether through-holes are drilled and what the leaf face looks like.
Door closer and threshold detailAffects frame head strength and floor interface at the opening.
Architrave or shadow gapSets the frame profile and how the reveal is finished on site.

Where a project calls for an architrave-free wall, tell us in the submittal. We will confirm whether the chosen variant carries that detail and what the frame packing requires from the site build-up.

5. Interface with wall paneling and built-in joinery

Decorative interior doors rarely stand alone. Where a door line runs through paneled walls or past tall cabinetry, the submittal should include a setting-out drawing that puts the door, the panel joint and any cabinet reveal on one sheet at one scale. This is where buying from one supplier helps: Integrated Door & Paneling lets us carry the same finish across the leaf and the surrounding panel run, so joint positions get agreed on the drawing instead of argued on site.

If cabinetry and doors come from different suppliers, put both shop drawings in one submittal pack and mark the interface line yourself. Two well-made packages that were never coordinated still produce a bad reveal.

6. Samples, prototypes and approval records

For decorative doors we normally ask for finish sign-off on a sample before the order is released to production, and on bespoke work we can prepare a prototype or mock-up leaf so the client sees the profile, edge and lacquer in real light. The submittal pack should carry the signed sample card, the date, and the name of whoever approved it. That record protects the buyer as much as the manufacturer when a later trade wants to know why a shade was chosen.

7. Packaging, delivery sequence and site handling

State how the doors are to be packed and in what sequence they arrive. Made-to-measure leaves are of little use if the first container lands before the openings are lined. Our Furniture Logistics and Door-to-door Delivery service covers freight by sea, air and rail, packaging and container loading, customs paperwork and shipment tracking, so the delivery plan can be agreed at order stage instead of improvised later. Record in the submittal:

  • Pack type and protection on the lacquered faces.
  • Position numbers printed on every package, matching the schedule.
  • Delivery phase and staged release by floor or building section.
  • Storage conditions expected on site, and who is responsible for keeping leaves dry and flat.

8. Installation responsibility and the snag list

Say clearly in the submittal whether fitting is yours or ours. Where we support installation, the pack should include the fixing detail, the tolerance range the site team must hold for the opening, and the sequence for hanging, adjusting and cleaning down. Furniture Installation and After-sales Support covers on-site installation with inspection and snags, so agree the snag process before the doors land and write the agreed items into the submittal as a checklist. Warranty terms and spare-part arrangements should be stated in writing at this point, not assumed.

9. Commercial sheet: what the quotation must confirm

Alongside the technical pack, the commercial page of the submittal should restate the things that slip out of a purchase order: quantities by position number, unit and total price, currency, the Incoterms and delivery address, payment terms, the production lead time measured from drawing approval rather than from enquiry, and what happens if dimensions or finishes change after release. A leaf size revised before cutting affects one position; once the batch is under way, a revision holds up that position while the corrected leaf is remade.

Submittal checklist to paste into your own template

  • Position schedule keyed to the plan, with hands and swing directions.
  • Finished opening dimensions with datum, wall build-up and measured deviations.
  • Signed dimension drawings for each leaf and frame.
  • Finish specification: surface, cut, grain direction, sheen, and approved sample card.
  • Ironmongery schedule naming the supplier and every machined item.
  • Interface drawings with paneling, architraves and adjacent joinery.
  • Packaging, position labelling and delivery phasing.
  • Fitting responsibility, tolerance range, snag list and after-sales terms.
  • Commercial sheet with lead time measured from drawing approval.

If a document does not help the person hanging the door or the person signing for the delivery, it does not belong in the submittal.

Send the drawings and we will mark them up

If you are specifying decorative interior doors for a villa, hotel or apartment package, send the plan and your draft schedule. We will return marked-up dimension drawings, a finish specification for you to complete, and a quotation that reflects what is actually on the sheet. Our Interior Design Services team handles space planning, product specification and production coordination, so the submittal gets assembled with you rather than handed back as a PDF.