A swim spa quotation is only as good as the brief behind it. For a configurable product such as our Outdoor Swim Spa WS-S06B-T, two buyers can send the same model number and receive very different prices, because the options around the shell — heating source, filtration, control system, cover, site preparation and delivery terms — are what drive the cost. This guide lists exactly what we need from you to price this model properly, and what you should expect back in return.
Start With the Model Reference, Not a Photo
Send the model code — WS-S06B-T — or the link to the product page. The catalog entry for this unit lists overall dimensions of 5800 × 2200 × 1420 mm, and it sits inside a wider configurable range of swim and hydrotherapy units, so an image alone is not enough to identify the shell, the jet layout or the equipment package. If you are still comparing options, browse the full Swimming Pools and Swim Spas category first and shortlist two or three models; that lets us quote alternatives side by side instead of one at a time.
The Site Conditions We Need in Writing
Half of the questions we ask are about where the spa will stand. Please include:
- Installation setting: in-ground, semi-recessed or fully above ground on a deck, terrace or paved patio. Recessed pits need access provisions for the equipment and for future servicing.
- Support structure: whether a load-bearing slab or reinforced deck already exists, and its finished level. A 5800 × 2200 mm footprint needs a level, adequately loaded base before the shell arrives.
- Clearance and access route: door widths, gate heights and the route from the delivery vehicle to the final position, including any stairs or tight corners. This decides how the shell is handled on site and who carries out the offload.
- Drainage and overflow: where backwash and drain-down water will run, and whether a drain is within reach of the plant area.
Power, Heating and Water Supply
The catalog entry for WS-S06B-T shows a total power figure of 8.75 kW for the standard equipment set. Treat that as the reference point for your electrician, not as the final number: the actual load changes with the options you choose, and single-phase versus three-phase supply, breaker size and cable run length all depend on your site. Tell us:
- Your available supply — phase, voltage and frequency at the installation address.
- How the water will be heated: electric heating or an add-on heat pump, and the water temperature you want to hold in each season.
- Whether the spa will run year-round or only in warmer months, which changes insulation and cover choices more than any other factor.
- Cold-climate exposure: overnight low temperatures at the site, since insulation and cover decisions follow from them.
Configuration Choices That Change the Price
The standard catalog specification for this model reads as follows:
| Item | Catalog specification |
|---|---|
| Model | WS-S06B-T |
| Dimensions | 5800 × 2200 × 1420 mm |
| Control system | 1 set |
| Swim training system | 1 set |
| Water pump / filter pump | 1 each |
| Jets | 40 in total |
| LED lighting | 3 lights plus 26 small LED lights |
| Total power (catalog) | 8.75 kW |
| Features shown | Water jets, temperature setting, LED lighting, ozone, swim training system |
Beyond that baseline, the catalog lists options such as control systems, UV sterilisation, water pumps, heat pumps, sand filtration, insulation and steps. Availability and compatibility vary by model, so we confirm each item against your configuration rather than assuming it fits. Tell us which of these you want quoted, and which you plan to source locally — some buyers prefer to buy steps, covers or a heat pump near home to save freight, and that is fine as long as the specification is settled before production.
If your project needs something the standard range does not offer — a different footprint, a shaped basin, or a hydrotherapy pool built around a particular terrace layout — send the drawings instead. We also produce made-to-shape units, for example this Customizable Shape Outdoor Spa, and custom work is quoted from drawings rather than from a model code.
Quantity, Timeline and Who Uses the Spa
A resort or villa developer ordering several units plans differently from a homeowner buying one. Please state:
- Quantity and phasing: how many units, and whether they are for one site or split across phases.
- Required on-site date: the date the units must be delivered, not just the date you want to order. We plan production against that date.
- Intensity of use: private residential use versus guest-facing hospitality use. Commercial duty cycles affect equipment selection and how we recommend maintenance access.
Delivery Terms and Documents
Freight is a real part of the landed cost, so include the delivery city and, if you know it, the port of discharge. Tell us whether you want door-to-door delivery handled for you or whether your own freight forwarder will take the shipment from the loading port; we arrange sea, air and rail forwarding with packing and container loading, plus the paperwork side such as commercial invoices, packing lists and certificates of origin. If you have an importer of record or a customs broker already, name them in the enquiry so the quotation matches your Incoterms instead of ours.
A Checklist You Can Copy Into Your Enquiry
Send these eleven items and we can quote without a second round of questions
- Model reference: WS-S06B-T (or the product link)
- Quantity and required on-site date
- Above-ground, semi-recessed or in-ground, with a site photo or drawing
- Base/slab details and finished level
- Access route from kerb to final position
- Supply: phase, voltage, frequency at the address
- Heating method and target water temperature
- Year-round or seasonal use, plus local overnight lows
- Options wanted: UV, sand filtration, heat pump, insulation, steps, cover
- Delivery city / port, and preferred Incoterms
- Contact name, phone or WhatsApp, and email
What You Should Get Back From Any Supplier
Judge the reply, not just the price. A usable quotation states the shell and equipment package line by line, separates the unit price from freight and duties, names what is excluded, and gives a production window rather than a vague promise. It should also flag anything your site cannot support — an undersized electrical supply, a missing drain, a base that will not carry the loaded weight — before the order is placed. If a supplier quotes a swim spa without asking about power or installation access, treat that quotation as incomplete.
For comparison purposes it also helps to look at how neighbouring models differ. Longer layouts such as the Long Outdoor Swim Spa with Hydrotherapy & Relaxation Pool separate a swim channel from a seated hydrotherapy area, while feature-led units such as the Luxury Outdoor Swim Spa with Massage Jets, LED & Water Features prioritise water features and lighting. Send your priorities — swim length first, or massage and ambience first — and the shortlist narrows quickly.
Common Questions
Can I order the standard specification exactly as listed?
Yes. We quote the catalog baseline for WS-S06B-T — jets, temperature setting, LED lighting, ozone and swim training system — with no options added, and we confirm the included equipment and electrical requirements for that configuration in writing before production.
I only have a plan drawing so far. Is that enough?
A dimensioned site plan is enough for an indicative quotation on position, access and options; we then confirm the base, power supply and drainage details before the order is finalised.
Do you install the spa on site?
Our service scope covers design coordination, production, logistics and door-to-door delivery, followed by installation support, inspection, warranty coverage and spare parts. Electrical and plumbing connections still need licensed local trades, and any permits are handled locally.
Send your site details and we will price WS-S06B-T against them.
Include the checklist items above and we can return a specification-by-specification quotation. Contact PHILLIP by phone or WhatsApp on +86-13928214007, email santerson@qq.com, or use the contact page.