A swim spa quote is only as good as the information behind it. For a configurable product such as the Outdoor Swim Spa WS-S07B-T, two buyers can request the same model and receive different prices, because the shell size is only one line on a long list of decisions. The checklist below covers what our quotation team actually needs before it can put a number on paper, and why each item changes the result.
1. Where the spa will sit, and how it gets there
Send us the installation setting first: in-ground recessed, semi-recessed, on a raised deck, or on a slab at ground level. Tell us the finished water height you want relative to the surrounding surface, because that drives steps, seating edges and access panels. Then send the site photos and the access route — gate width, stair runs, overhead clearance, crane or forklift availability. A 7 m shell travelling to a Sydney terrace and a 7 m shell landing on a Melbourne acreage are two different freight jobs, and the difference shows up in the landed cost long before anyone opens the cabinet.
2. Structure, insulation and climate duty
The catalog lists this model at 7000 × 2200 × 1365 mm, but the shell is only half of the build question. Tell us whether you want full-foam insulation or partial insulation, what the winter low gets down to in your region, and whether the spa will run year-round or seasonally. That set of answers decides the insulation package and the heater sizing. If the site is coastal, say so: salt-laden air changes what we specify for cabinet hardware and metal parts.
3. The water system you actually want
This is where most quotes move. Our catalog record for WS-S07B-T shows a swim training system, one control system, one water pump, one filter pump, 44 jets in total, three LED lights plus 26 small LED lights, and a listed total power of 8.75 kW — with water jets, LED lighting, ozone and the swim training system shown as fitted features. Treat those figures as the standard configuration for this model, not as a fixed promise: change the jet count, add UV sterilisation, swap in a sand filter, or add a second pump, and both the specification sheet and the price move with it. If your priority is lap swimming rather than hydrotherapy seating, say so at the start; that single sentence changes pump selection more than anything else on this list.
| Item to confirm | Why the supplier needs it |
|---|---|
| Jet count and jet types | Drives pump capacity, power draw and cabinet layout |
| Swim training system — included or optional | Determines whether the quote covers one shell or shell plus propulsion unit |
| Ozone, UV sterilisation, sand filtration | Water-treatment options are quoted separately and are not interchangeable |
| Heat pump or inline heater, target water temperature | The largest single running-cost decision in the specification |
| Insulation grade and cover | Sets heat retention, and therefore the heater size you need |
| Steps, seating ledges, handrails | Access items are made to order once the site level is known |
4. Power supply and controls
Give us the available supply: single-phase or three-phase, voltage, breaker capacity, and where the sub-panel will sit relative to the spa. The listed total power of 8.75 kW applies to the configuration recorded for this model; add a heat pump and the electrical service becomes the limiting factor, so we would rather size it now than discover it on site. Also tell us whether you want the control panel mounted on the cabinet or relocated to a wall or sheltered position, and whether you need remote monitoring.
5. Quantity, finish and delivery terms
One villa spa and eight resort villas are quoted differently, so state the quantity and the phasing. Send the cabinet or cladding finish you want if the spa will be visible above ground — we build to order through our Custom & OEM Service, so matching a project's exterior palette is normal practice. Finally, name your delivery terms: port collection, door-to-door delivery, or delivery plus installation support. Our Logistics & Door-to-Door Delivery service covers freight and paperwork, but the incoterm you choose decides what sits in our quotation and what your local contractor handles.
6. What we send back
With those six blocks of information, a quotation comes back as a specification sheet listing the confirmed shell dimensions, pumps, jets, treatment options and insulation grade, plus the freight method and lead time for that configuration. With only the model number, it comes back as an estimate with caveats — which is why projects that send site drawings and an electrical detail in the first message get usable numbers days earlier than projects that do not.
A note on figures: dimensions, jet counts and power ratings quoted above are transcribed from the catalog entry for this model. Your confirmed configuration may differ, and only the specification sheet attached to your quotation is binding.
Sending a complete enquiry
Can I request a quote with just the model number?
Yes, but you will receive an indicative range rather than a firm price, and a second round of questions.
Do I need finished drawings?
No. Photos, a rough site plan and the supply details are enough to start; we work through the gaps with you.
Can the specification be matched to a resort design package?
Yes. Send the design intent and quantity, and we quote the configuration rather than a catalogue default — see our Turnkey Solutions for how project packages are assembled.
Send your site photos, supply details and quantity to the SANTERSON team and we will return a specification-backed quotation for the Outdoor Swim Spa WS-S07B-T or the model that suits your space.