Wooden sliding panels rarely come off a shelf. They close a closet, screen a study, divide a suite or hide a media wall, and every one of those jobs has its own opening size, track arrangement and finish requirement. That is exactly why the quotation stage matters more here than it does for standard cabinetry: what you send us determines how quickly we can price the job and how accurately the panels fit on site.

This guide walks through what a buyer, contractor or designer should include when requesting a made-to-measure quotation for Wooden Sliding Panels, and what you can expect back from SANTERSON as a China-based manufacturer working on villa, hospitality and office projects.

Start With the Job, Not the Product Code

Our Wooden Sliding Panels sit within the Sliding Panel Systems collection and are built for wall system projects where dimensions, layout and finish are specified per project. The same approach applies across the family — Closet Sliding Panels for wardrobe fronts, Partition Sliding Systems for room division, and Acoustic Sliding Panels where sound separation between spaces is part of the brief.

Tell us what the panels have to do before you tell us what they should look like. A partition that has to fold away at the weekend and a closet front that stays shut for years are engineered differently, even when both are timber-faced.

What Your Enquiry Needs to Include

Send these with your first message and the quotation can go out without a second round of questions

  • Opening dimensions. Clear width and height at three points across the opening, plus the floor-to-ceiling condition. Note ceilings that are out of level and floors with tiles already laid.
  • Panel count and stacking side. How many panels you want, which direction they travel, and where they stack when open. This drives track length and hardware selection.
  • Track arrangement. Top-hung or floor-guided, single or multi-track, and whether the track can be recessed into a bulkhead or must sit exposed.
  • Substrate and finish. Solid timber, engineered board or a decorative face; stain, lacquer, veneer or laminate; gloss level. Send a finish sample reference or a photo of joinery already on site if the panels have to match it.
  • Interface details. Skirting, architrave, reveals, adjacent cabinetry, and any handle, push-open or integrated grip preference.
  • Project context. Quantity of openings, delivery address, floor level, lift access, and your target installation window.

A drawing is welcome but not required. Sketches with dimensions marked by hand work well; so does a set of architectural elevations if your designer has produced them. If neither exists, photographs of the opening taken straight on are enough for us to mark up the measurements and send them back for confirmation.

What Happens After You Send an Enquiry

SANTERSON works villa, hotel and office projects end to end, so panel enquiries follow the same route as the rest of our custom and OEM service:

StageWhat we doWhat we need from you
Review and clarificationWe check the dimensions against the intended track and panel layout, and flag anything that will not work as drawn.Confirm or correct the opening sizes; answer questions on stacking and hardware.
Specification and quotationYou receive a priced specification covering substrate, finish, panels, tracks, hardware and packing.Approve the specification and confirm quantities per opening.
Detail confirmationShop drawings for sign-off before cutting. Where several openings repeat, we group them to keep production consistent.Countersign the drawings; nominate a single decision-maker for changes.
Production and QCPanels are made to the signed dimensions and inspected against the approved finish before packing.Nothing, unless you want a finish sample posted first.
Shipping and handoverFreight arranged by sea, air or rail with the export paperwork prepared, delivered to site.Confirm Incoterms, delivery address and receiving arrangements.

The stages above are the ones our service pages describe for custom work; transit routing and delivery terms are agreed per project rather than assumed.

Panel dimensions are confirmed on the signed drawing before we cut. Once production starts, size changes mean remaking panels, so nominate one person on your side to sign off the measurements.

Combining Panels With Other Joinery on One Project

Sliding panels seldom stand alone. In a villa refurbishment they usually sit beside kitchen cabinetry, wardrobes and wall panelling, and those items need to share the same timber tone and gloss level. Ordering them together through one one-stop furniture and building materials supplier removes the matching argument between separate trades.

Where a project needs the door as well as the wall, our Wooden Sliding Doors are made to the same measurement discipline and can be specified in a matching finish. For storage that runs behind the panel face, Sliding Storage Panels combine the panel front with an internal fit-out.

Common Questions Before a Quote Is Issued

Can you match an existing finish?

Send a physical sample or a photograph of the joinery under daylight, and state whether the surface is lacquer, veneer or laminate. We confirm what we can achieve against it before pricing rather than after.

What are the minimum quantities?

Minimum order quantities are set per project rather than fixed across the catalogue, so state your opening count and we will tell you what is workable.

Who measures the openings?

Your side measures and we verify. We ask for dimensions taken at multiple points because an out-of-square opening changes the panel sizes, not just the trim.

Can acoustic performance be specified?

Flag it in the enquiry. For Acoustic Sliding Panels, state the separation you need between spaces; we then confirm the construction and the sealing detail at head, jamb and floor for the configuration selected. Acoustic figures are confirmed per configuration rather than quoted from the catalogue.

Ready to Price Your Panels?

Send your dimensions and finish preference

Send your enquiry through our contact page. Include the opening sizes, panel count and stacking direction, and we will come back with a priced specification for your approval. We answer enquiries within 24 hours.