A swim spa is one of the few leisure amenities that works for a hotel guest room terrace, a resort wellness deck and a private villa garden at the same time. It also fails often, usually because it was specified as a catalogue item instead of as part of the project fit-out. Here is how we walk specifiers through Outdoor Swim Spa WS-PC06ST, and what to confirm before the order goes into production.
What the model is, and where it fits
WS-PC06ST sits in our configurable outdoor swim and hydrotherapy range, alongside shorter and longer variants of the same family. The catalog lists it at 5900 × 2400 × 1470 mm. In practice that footprint is what makes it useful on constrained sites: it fits a villa side yard, a rooftop terrace with service access, or a hotel garden plot where a full lap pool would never be approved. The swim training system lets a guest swim against the current in place, while the massage jets and seating area do the relaxation work for whoever is not swimming.
For hospitality projects we normally see this size specified in three situations: boutique hotels and serviced apartments with no space for a pool; villas where the swim spa doubles as the garden water feature; and wellness or gym-adjacent areas that need hydrotherapy without a full pool plant room. For each of those, the decision is not really about the shell — it is about how the shell, the equipment and the site services are coordinated.
Reading the specification honestly
The published figures for this model, as shown on the product page, are below. Treat them as the starting point for a quotation, not as a finished technical schedule — the equipment set is confirmed per configuration.
| Item | As listed in the catalog |
|---|---|
| Model | WS-PC06ST |
| Catalog dimensions | 5900 × 2400 × 1470 mm |
| Control system | 1 set |
| Swim training system | 1 set |
| Filter pump | 1 pc |
| Jet total | 6 pcs |
| LED lights | 4 |
| Total power | 6.55 kW |
| Features shown | Water jets, LED lighting, Ozone, Swim training system |
Two points in that table matter more than they look. First, total power of 6.55 kW is the figure for the listed configuration — it moves once a heat pump or additional pump is added to the order, and your electrical engineer needs the number for the confirmed build, not the catalog page. Second, water pump is not itemised in the captured specification for this model. We confirm included equipment on the quotation, so please check the line items rather than assuming what the family range includes.
Six questions to settle before you specify WS-PC06ST
1. Site access and the installation route
A spa of this size arrives as a delivered unit that has to reach its position. Narrow villa side passages, rooftop lifts and first-floor terraces all change what is feasible, and they change the crane or rigging line on your quote. Send us photos and an access route with your enquiry; we would rather flag a problem at quotation stage than after delivery.
2. Structure and drainage
A filled shell of this size is a heavy point load, which matters on terraces, podium decks and mezzanines. Confirm the structural allowance with your engineer, and confirm the base slab, drainage route and overflow connection at the same time. For elevated installations we coordinate these details against your drawings.
3. Electrical supply and earthing
Start from the confirmed configuration's total power and let your electrical designer size the circuit, protection and bonding to local requirements. Supply capacity is a common late-stage surprise on renovation projects, so we ask for it early in the design coordination.
4. Which options are actually in scope
Catalog-listed options for this range include control systems, UV sterilization, water pumps, heat pumps, sand filtration, insulation and steps. Availability and compatibility vary by model, so each line needs confirming against your configuration. For year-round outdoor use in cooler climates, the insulation and heat pump choices drive running cost far more than the shell does.
5. Water treatment and daily maintenance
Ozone is shown as a feature on this model; UV sterilization is an option. Neither removes the need for a maintenance routine, and in a hotel that routine has to be written into operations before handover: who checks chemistry, how often the filter pump runs, what happens during low-occupancy periods. Ask us for the maintenance guidance for your specific configuration so it can go into your operations manual.
6. How it sits with the rest of the outdoor package
A swim spa surrounded by mismatched loungers and a random deck reads as an afterthought. We furnish the surrounding area from the same project file — aluminium sling sun lounger collections for poolside seating, modern aluminium outdoor sofa sets for the terrace lounge, and pergolas or cabana daybeds where shade is needed. Same supplier, one delivery schedule, consistent finishes across the outdoor areas.
Hotel versus villa: what changes in the decision
For a hotel, the driver is guest experience plus maintainability. Guests use a swim spa outside pool hours, which extends the value of an amenity that would otherwise sit idle; and because it holds far less water than a lap pool, the plant and treatment duty are smaller. What you must nail down is durability of finishes under high traffic, a maintenance routine your team can actually follow, and clear handover documentation.
For a villa, the driver is how the space is used by the owners. If anyone in the household swims regularly, the swim training system justifies the footprint; if the spa is mostly for soaking, a shorter model from the same range may suit the plot better and cost less to run. Send us your outdoor layout and we will tell you which variant of the family fits, even when that means recommending a smaller unit.
How the order runs
As a China furniture and building materials manufacturer, we handle swim spas as part of the wider project package rather than as a standalone purchase. The sequence on our side is straightforward: project brief and design proposal, then quotation with every equipment line item confirmed, then production and shipment, followed by installation support and after-sales. That means one point of contact for the spa, the surrounding outdoor furniture, and — where relevant — the cabinetry, ceramics, lighting and finishes elsewhere in the same building.
- Send drawings, site photos and the access route with your enquiry.
- Ask for the confirmed configuration's total power and full equipment list, not the catalog summary.
- Confirm options — heat pump, insulation, UV, sand filtration, steps — in writing before production starts.
- Agree who supplies the base, power and drainage, and by when.
- Request maintenance guidance for your configuration so it can be built into operations.
If you are specifying outdoor water features across several units or several rooms, grouping the swim spa with the rest of the furniture and building materials package usually saves coordination effort more than it saves on any single item — one production schedule, one shipment plan, one installation sequence.
Tell us the site, the room count or villa layout, and your target handover date, and we will quote Outdoor Swim Spa WS-PC06ST with a confirmed equipment schedule — or recommend the variant of the range that suits your plot better. Contact SANTERSON (PHILLIP) on +86-13928214007, by WhatsApp, or at santerson@qq.com.