A submittal is the package a buyer, consultant or main contractor reviews before a wardrobe order is released for manufacture. For Walnut Solid Wood Wardrobes, the file has to prove three things at once: that the unit fits the opening, that the timber and finish match the schedule, and that the interior layout matches how the room will actually be used. A thin submittal causes rework on site; a complete one lets the reviewer sign off in one round.

The outline below follows the order most project reviewers read in. Send it as one PDF with numbered pages, and reference those page numbers in your cover email so comments come back against specific sheets.

1. Project identification and scope statement

Open with the boring but essential sheet: project name, unit or room references, drawing revision numbers you worked from, the supplier's contact block, and a one-line scope statement naming the rooms covered. State plainly whether the package covers bedrooms only, or also hallway and dressing-room joinery.

Add an exclusions list. Reviewers react badly to silence about what is not included — bench tops, integrated lighting, hardware upgrades, skirting removal and reinstatement, or on-site making good around the unit. Naming these up front prevents a change order later.

2. Dimensional drawings tied to the actual openings

Walnut solid wood wardrobes are made to measure, so every dimension in the submittal must come from the opening as built or as drawn by the trades responsible for that wall — not from a standard catalogue size. Provide elevations for each unit, a plan showing door swing and clearance, and reflected ceiling lines where the wardrobe runs to the ceiling.

  • Overall height, width and depth, plus finished face lines so the contractor can check floor level and wall plumb allowances.
  • Setting-out dimensions from at least two fixed reference points per room, with the datum clearly labelled.
  • Notes on how the unit handles out-of-plumb walls and uneven floors — scribe, filler panel or site trimming, and who carries that work.
  • Interface details with skirting, architraves, adjacent cabinetry and any wall finish that continues behind the carcass.

Where a room repeats across a development, mark each variant. A single generic elevation submitted for six rooms with three different ceiling heights is the most common cause of rejected submittals.

3. Material and finish schedule

This is where a walnut specification either holds together or falls apart. List carcass, door fronts, drawer fronts, shelf material, interior lining, edge treatment and hardware separately, because reviewers approve them separately.

ItemWhat the reviewer needs to see
Door and drawer frontsSpecies, cut (plain-sawn or quarter-sawn), grain pattern expectation, and the finish system with sheen level.
Carcass and boxesPanel type and thickness, edge banding or solid lipping, and how the material is specified against the fronts.
Shelves and hanging areasShelf thickness, span, adjustable pitch, and whether shelves are fixed or movable.
Interior liningLining material and colour, plus any fabric or felt on drawer bases and tray areas.
HardwareHinge and slide make and model, soft-close provision, handle or integrated pull profile, and load ratings where drawers carry heavy items.
Finish scheduleNamed colour or stain reference, sheen, and the sample number attached to that reference.

Walnut is a feature timber, so grain variation matters. State how much colour and figure variation is expected across a run of doors, and confirm whether fronts will be selected and sequenced by hand. Reviewers who are left guessing about grain will ask for it in writing anyway — better to answer it in the first package.

4. Samples with a reference register

Attach physical samples and mirror them in a register table: sample number, item it applies to, finish name, sheen, and date produced. Every drawing callout should point to a sample number rather than to a colour name alone.

  • A walnut front sample in the specified cut and finish, large enough to read the grain.
  • A carcass or lining offcut showing the edge treatment, not just a flat face.
  • A hardware set mounted on a board so the reviewer can see the pull profile in context.
  • A signed and dated transmittal slip for each sample, since finishes are re-specified mid-project more often than anything else.

Keep approved samples until handover. They are the reference if a replacement door is needed later in the project.

5. Interior layout matched to real use

Layout is not decoration; it decides whether the wardrobe works after handover. Show hanging heights for short and long garments, shelf pitch, drawer counts and depths, tray or accessory areas, and provisions for bags, suitcases or seasonal items. Where a room serves a guest suite rather than an owner, plan for shorter stays and fewer personal items.

For bedroom projects, cross-check the wardrobe layout against the bed wall and circulation before you submit — a door swing that blocks the bed side is a site problem, not a drawing problem. If the project also calls for walk-in wardrobe or corner solutions, include those rooms in the same submittal so the layouts are reviewed as one system rather than in isolation.

6. Construction and installation details

Include a typical section through the carcass, fixing method to floor and wall, how units are levelled, scribe or filler dimensions, and the sequence for doors hung on site. Add protection requirements for transport and storage, plus the tolerance the installer will work to.

  • Fixing detail for the substrate the contractor must provide — solid wall, stud wall or blocking.
  • Interface with flooring: underfloor heating, threshold strips and expansion allowance.
  • Door alignment and adjustment range, so site snagging has a defined target.
  • Delivery route notes for the longest assembled component, including lift or stair constraints.

Where the wardrobe sits in a wider fit-out, coordinate it with built-in furniture packages such as vanities, media walls and shelving. One coordinated set of drawings for joinery across the project keeps finishes, tolerances and site sequencing consistent.

7. Commercial terms and programme

Close the package with what a procurement reviewer needs to release the order: priced bill of quantities by room, currency and Incoterms, delivery location, packaging and container loading plan, and the lead time measured from two clear gates — approval of the submittal and confirmation of site-measured dimensions.

State what starts production and what can still change after each gate. Suppliers who spell this out avoid the classic dispute where a client changes a drawer layout after the carcasses are cut. If your scope also covers other fit-out items, grouping them under custom and OEM service in one submittal round reduces duplicated review effort across trades.

Before you submit: confirm site-measured dimensions, get the finish sample signed, and check that every callout on every drawing points to a sample number. Those three checks resolve most comment lists.

Common submittal gaps and how to close them

  • Catalogue dimensions used instead of site-measured openings — always the first rejection trigger.
  • Finish named in words but no sample attached, leaving sheen and grain open to interpretation.
  • Hardware specified by function only ("soft close") with no make or model to price and replace.
  • No exclusions list, so site works assume the supplier handles making good and trims.
  • Interior layout drawn without garment lengths, which produces hanging rails set at the wrong height.

Frequently asked questions

Do walnut solid wood wardrobes need site measuring before manufacture?

Yes. Made-to-measure units should be dimensioned from the completed room, after flooring, plaster and levels are fixed. Submitting shop drawings against structural dimensions alone leaves tolerance risk on height and out-of-plumb walls.

Should the submittal cover every wardrobe type in the project?

Ideally yes, including hinged, sliding and walk-in configurations. Reviewers can then check that finishes and hardware are consistent across room types, and any variation between units is a deliberate decision rather than an oversight.

What approvals should be listed on the transmittal?

Name the reviewer roles that must sign: design or interior consultant, main contractor, and client representative where finishes are a client choice. Record sample approval separately from drawing approval, because they are often signed by different parties on different dates.

SANTERSON supplies walnut solid wood wardrobes as made-to-measure joinery for villa and hospitality projects, with finish and layout specified per room. Send us your drawings, opening dimensions and finish references, and we will return a submittal set — elevations, material and hardware schedule, sample register and priced bill of quantities — ready for review. Enquiries and drawings can be sent to SANTERSON through the enquiry form on our website.