A set of wood grain pvc cabinet doors is easy to approve on a sample board and much harder to land on site in another country if the order details were never fixed. Cabinet work is measured, packed and installed room by room, so an international project order succeeds or fails long before the container leaves the port. The steps below follow how we run these orders at SANTERSON, from specification sign-off to handover at your door.
Start with what the product actually is
The wood grain pvc cabinet sits in our PVC Kitchen Cabinet collection and is built for residential kitchen projects. Its finish, layout and dimensions are specified per project, with made-to-measure sizing, a choice of material and finish options, and a layout tailored to the space. That configurability is the reason lead times differ so much between orders: nothing on the drawing can be decided after production starts.
Before any freight conversation begins, three documents should exist and be signed by the person who will receive the goods:
- a dimensioned layout of every run, including corner units, tall units and any appliance housings;
- a written finish schedule naming the wood grain decoration and the handleless or handled door profile for each elevation;
- a site condition note covering floor levels, wall finishes and the position of water, waste and electrical points.
If your project also needs matching bedroom storage, we supply wardrobe ranges in the same wood tones, so a single wood veneer kitchen cabinet and wardrobe specification can cover several rooms under one purchase order.
Choose the shipping mode against your site programme, not against price alone
We arrange freight forwarding by sea, air and rail, together with customs paperwork, packaging, container loading and shipment tracking through to door-to-door delivery. For cabinetry, the practical difference between those options is how much tolerance the schedule has for one correction cycle.
| Decision | What it settles | Why it matters for cabinets |
|---|---|---|
| Delivery term (Incoterms) | Who pays freight, insurance and import clearance, and where risk transfers | Determines whether you or we handle the customs entry and any duty at destination |
| Consolidation | Whether cabinets travel alone or with other goods from the same project | Sharing a container with interior fixtures and finishes saves cost but adds packing coordination |
| Arrival port and final leg | Where the container is released and who carries it to site | Narrow urban sites need a smaller vehicle and an unloading plan agreed in advance |
| Split shipment | Whether wet-area joinery ships ahead of tall units | Allows trades on site to start while the remaining crates are still at sea |
Ask us for a packing list with crate dimensions and total volume before you commit to a shipping method. That single document tells your local freight agent whether the order fits a shared consignment or needs a dedicated container, and it is the basis of every landed-cost estimate you will be given.
Packing and sequencing are part of the design
Cabinets that arrive in the wrong order cost more than the freight saved. We pack to a sequence agreed with your site: carcasses first, then doors and drawer fronts by room, then hardware, worktop substrates and trims. Each crate is labelled against the same reference used on the approved drawings, so an installer can find the tall pantry unit without opening anything.
- Doors and decorative panels travel flat-packed and protected at the edges, because a chipped wood grain edge cannot be repaired on site to sample standard.
- Glass-fronted units travel in separate crated compartments from solid doors, so weight does not travel onto the fragile item.
- Hinges, runners and handles are bagged per unit and listed twice: once on the crate label, once on the master packing list.
Customs documents you should expect in the file
Our logistics team prepares commercial invoices, packing lists, certificates of origin and the paperwork needed for import permits, and can arrange cargo insurance with a dedicated coordinator handling your consignment. The exact set depends on the destination country, so confirm the requirements with your own clearing agent rather than assuming any single list applies everywhere.
- Commercial invoice describing each item in terms your local officer will accept, with values per line matching the packing list.
- Packing list keyed to crate marks and to the drawing references used on site.
- Certificate of origin where the destination market requires it.
- Insurance cover agreed before loading, not after damage appears at delivery.
Duty rates, taxes and inspection rules are set by the importing country and change without notice. We will not tell you what your clearance will cost; your broker will. What we can control is accurate documentation and honest declarations, which is where most delays actually begin.
Installation and after-sales close the loop
Delivery to the door is not completion. Our service covers on-site installation support, inspection and snag lists, warranty coverage, spare parts and replacement, and ongoing maintenance. For a kitchen, the practical sequence is: site handed over level and dry; carcasses set and aligned; worktops cut and fitted on site; doors hung and adjusted; appliances dropped in; snag list signed.
Two points decide whether this goes smoothly. First, who is on site to receive and check the crates — a container released to an unprepared site sits in the sun while its contents are inspected. Second, how quickly a missing or damaged component can be replaced; small parts ship far faster than a re-made door, which is why the spare-parts list should be signed off with the order.
A practical timeline to plan backwards from
| Stage | What must be finished before it starts |
|---|---|
| Specification and quotation | Approved layout, finish schedule, appliance list |
| Detail confirmation | Client sign-off on every elevation and hardware schedule |
| Production and quality control | All variations closed; nothing pending on site levels or services |
| Packing and booking | Final packing list, crate marks, chosen Incoterm |
| Transit and clearance | Documents issued correctly, broker briefed, delivery slot booked |
| Installation and handover | Site ready, trades scheduled, snag list template agreed |
Set the programme by working backwards from your handover date, then add time for one round of corrections. Projects that run late almost always lose that allowance first.
What to send us to get a usable quotation
- Drawing package or measured survey of the kitchen and any matching storage rooms.
- The finish you want, with the reference to a sample if colour accuracy matters.
- Destination address, preferred delivery term and the port or depot you can receive at.
- Your target on-site date, including when wet areas will be tiled and dry.
As a China-based furniture and building materials manufacturer working on villa, hospitality and office projects, we handle design coordination, custom and OEM production, logistics and after-sales under one purchase order — which is what keeps a measured product like a matte pvc cabinet in the same collection arriving as a complete, installable set rather than a partial shipment.