A flush sliding door looks effortless when it is done well — the leaf disappears into the wall, the face sits level with the finished surface, and the opening reads as part of the architecture. That effect is not created at the building site. It is created on paper, in the drawings, long before the frame leaves the factory. This guide walks through how we coordinate Santerson Flush Sliding Doors with design drawings and actual site conditions, so the opening you designed is the opening you get.

Why flush sliding doors demand more coordination than a standard door

A hinged door can absorb a rough opening that is slightly out. A sliding leaf cannot. The panel travels on a track, so its geometry has to be right along the whole length of the run, not just at one hinge line. Three things have to agree with each other before anything is manufactured:

  • The design intent — where the door sits, how wide the clear opening is, which wall finish it is meant to disappear into.
  • The construction drawings — wall build-ups, floor levels, ceiling heights and the positions of services that the pocket or track may pass behind.
  • The as-built site condition — the finished floor level actually achieved, the true wall alignment, and the real clear height once ceilings and screed are in place.

When those three disagree, the door is the thing that gets blamed. Most of the coordination work described below exists to make sure they agree before production starts.

What our product pages actually promise — and what they deliberately leave open

Our door catalogue describes these products as made-to-measure: finish, layout and dimensions are specified for each space and project, with material and finish options to choose from. That wording is intentional. The product page does not publish a fixed list of standard sizes or a single wall build-up, because the correct answer depends on your wall type, your floor finish and your opening.

So when you open the flush sliding door page, read the configuration section as a checklist of decisions we need from your drawings — not as a specification sheet to copy into a schedule. The same approach applies across the related collections: Santerson Flush Interior Doors, the hinged counterpart in Santerson Flush Hinged Doors, and concealed options such as Santerson Handleless Concealed Doors and Flush Wall Aligned Doors. Where a door has to sit inside a paneled wall rather than plasterboard, we coordinate it with the paneling package instead — Wood Veneer Panels and Wall Panel Systems are built to the same rule of project-specific sizing.

The information we need from your drawings

You do not need a fully resolved door schedule to start. What helps is having the following visible somewhere in the pack, even at sketch level:

Drawing or informationWhat we take from it
Floor plansOpening location, which side the leaf travels to, and whether the pocket interferes with adjacent cabinetry, switches or skirting.
Sections and elevationsDoor head height relative to ceiling and cornice, and how the leaf face should relate to the wall finish above and beside it.
Wall build-up detailsWhether the wall is masonry, stud and board, or a paneled system — this decides how the frame and track are fixed and how much tolerance exists.
Finished floor levelsThe completed level after screed and floor finish. A threshold set from structural slab instead of finished level is one of the most common causes of a door that will not close.
Services routingPositions of pipework, ducting, trunking and back boxes near the pocket or along the track line.
Finish scheduleThe paint, veneer or laminate the leaf face is meant to match, so the surface is ordered at the same time as the frame rather than after it.

If a drawing is missing, we say so rather than assume. A query raised in week one costs an email; the same question raised after production costs a re-made leaf.

Site verification: what has to be measured before production

Drawings tell us intent; the site tells us reality. Before we commit dimensions, we ask the site team — or our own coordinators where the project is one of our turnkey packages — to confirm these items:

  • Finished floor level at the opening. Measured at both ends of the run, because a floor that falls even slightly along the track line will bind the leaf.
  • Wall plumb and alignment over the full length of the opening. A flush face is only as good as the surface it sits against.
  • Clear height under the ceiling or soffit, not the height on the plan.
  • Wall thickness and construction type at the pocket, including whether there is enough depth for the leaf and hardware to sit fully concealed.
  • Position of anything fixed into that wall — door furniture, handrails, mirrors, tiling edges, integrated lighting.
  • Access route for delivery, since a full-height leaf is a different handling problem from a boxed hinged door.

Where site conditions differ from the drawings, we do not quietly adjust. The difference goes back to the designer or main contractor with the available options and their consequences, so the decision sits with the party who owns the design.

How the coordination runs in practice

For projects we supply under our turnkey solutions, door coordination is part of the same workflow that covers design planning, production, logistics and installation. The sequence looks like this:

1. Brief and layout review

We read the plans against the door schedule and mark every opening where a sliding leaf needs a pocket, a track reveal or a panel return. Openings that clash with joinery are flagged here.

2. Design and planning

Each opening gets a dimensioned configuration: clear opening width, leaf size, head detail, threshold detail, wall build-up it will be fixed into, and the selected face finish. Where our interior design services are engaged, this stage is merged with the wider room scheme so the door face matches the paneling and cabinetry around it.

3. Detail confirmation and quotation

The configuration sheet goes back to you for sign-off. Nothing enters production until the dimensions and finishes on that sheet are confirmed in writing.

4. Production and pre-shipment checks

Frames, leaves and hardware are made to the signed configuration. Because these are custom items, our custom & OEM service covers bespoke face finishes and textures where a project needs a specific veneer or laminate rather than a catalogue option.

5. Delivery to site

Doors ship within the wider furniture and building-materials consignment under our logistics and door-to-door delivery service, packed for transport so that leaf faces and frames arrive ready for the confirmed fixing detail rather than needing on-site remedial work.

6. Installation and handover

Fitting follows the confirmed build-up, with track adjustment and leaf alignment checked against the finished wall surface. Snag items are recorded at handover and closed out through our installation and after-sales support.

Common coordination failures, and how to avoid them

What goes wrongWhere it startsHow to prevent it
Leaf rubs the floor after handoverTrack set from structural slab instead of finished floor levelConfirm FFL at both ends of the run before dimensions are locked
Visible shadow gap between leaf and wallWall finish build-up thicker than the drawing assumedAgree the complete make-up — board, plaster, tile or panel — in the section detail
Pocket will not take the leafWall thickness reduced by services or insulationRoute services around the pocket zone on the drawings, and verify on site
Door face does not match surrounding panelingFinish ordered late from a different batch or supplierOrder door face and veneer panels together under one finish schedule
Head detail clashes with cornice or soffitSliding door shown on plan only, never in sectionRequire a section through every sliding opening before the schedule is issued

A note on tolerances

Flush detailing compresses tolerance. Every millimetre of movement — frame fixings, track adjustment, leaf trimming — has to happen where nobody can see it. That is why we settle the wall build-up and finished levels before manufacturing rather than leaving adjustment to the installer on site. If your drawings cannot yet show those details, tell us at enquiry stage; we will work from a site survey instead of assuming dimensions.

Sending us a good enquiry

A useful first message includes: the number and location of openings; plans plus at least one section through a sliding opening; the wall construction type; the finished floor level or the finish build-up; the intended leaf face; and your programme dates. With those, we can return a dimensioned configuration for review. Without them, expect questions — and expect a longer path to a firm price.

For villa and hospitality projects where doors, paneling, joinery and finishes all need to come from one source, coordinating the openings as part of the whole fit-out package removes an entire category of interface disputes. That is the practical reason we supply doors alongside furniture and building materials rather than as a separate trade.