A set of painted shaker cabinets can look flawless in the workshop and still fail on site — doors that meet at the wrong reveal, a scribed filler that shows a shadow line, a finish chipped where nobody thought to protect it. The difference is almost never the cabinet box; it is whether somebody wrote down how the run would arrive, be set, be aligned and be handed over. If you are specifying painted shaker cabinets for a villa or apartment project, the installation plan is the document that protects your finish budget. Here is what belongs in it.

Start with the room as it actually is, not as drawn

Shaker doors are simple, flat-framed panels, so every millimetre of out-of-plumb wall or uneven floor shows up as an inconsistent shadow gap. Before anything is ordered, the plan should record a site survey against the real structure: wall lengths at three heights, floor level along the full run, and the positions of soil stacks, flues, switchboards and manifolds that cannot be moved.

  • Record finished floor levels, not slab levels — a 20 mm change in screed or tile shifts every tall unit.
  • Note door and window reveals, skirting depths and any ceiling bulkhead the cabinets must scribe into.
  • Mark services you intend to relocate, with the tradesperson responsible for each move and by when.

Fix the specification before production starts

Painted work is unforgiving of late changes. Once a door panel is sprayed, changing a size or a handle position means re-making, not re-cutting. Our shaker ranges are made to measure — white, grey and two-tone layouts are all built to the dimensions of the individual project — so the plan should close out these items in writing before the workshop releases the order.

Item to lock downWhy it belongs in the installation plan
Cabinet sizes and scribing allowancesTells the site team which units are designed to be scribed, and how much waste is expected at the wall.
Door style, profile and paint scheduleRecords the panel profile and colour reference per elevation so replacements match later.
Appliance schedule with dimensionsOvens, dishwashers and fridges set the cut-out widths; late appliance changes force cabinet re-making.
Worktop thickness and edge detailDetermines carcass heights, splashback reveals and whether scribing strips are needed behind the stone.
Hardware and handle positionsPre-drilled painted doors cannot be moved; blind or corner mechanisms need clear access arcs.
Kickboard, plinth and lighting decisionsRecessed kickboards, toe-kick lighting and under-cabinet strips all have to be built into the carcass, not added afterwards.

Write the sequence of trades into the plan

Painted cabinets fail most often because another trade damaged them after installation. The plan should show who is on site in what order, and which work must be signed off before the cabinets land.

  1. First fix complete — plumbing, electrical rough-in, plasterboard set, and any wall lining behind the run finished and inspected.
  2. Wet trades closed — tiling, screed and paint touch-ups in the kitchen area done before cabinet delivery, so no wet work happens next to sprayed doors.
  3. Delivery and inspection — every crate opened, each door checked for transit damage against the packing list, and any claim raised on the day of arrival rather than at installation.
  4. Setting the run — carcasses levelled and tied, scribing cut on site to the surveyed wall, doors hung and adjusted to a consistent reveal.
  5. Worktops templated after setting — stone measured from the installed carcasses, then fitted, with splashbacks sealed to the wall.
  6. Appliances, hardware and lighting — appliances slotted into their cut-outs, hinges and runners adjusted, light strips connected at their designated drivers.
  7. Snag list and handover — a written list of defects with owners and dates, closed out before practical completion.

Include the finish-protection and access rules

Painted shaker doors should be the last thing touched in the kitchen. State this explicitly in the plan, along with who is responsible for protecting them.

  • Doors off-site or bagged while worktop templating, stone cutting and final painting happen nearby.
  • No abrasive dust, plaster mixing or solvent-based paint within reach of sprayed panels.
  • Carcasses protected with boards at the island ends and nearest doorway through to handover.
  • A named site contact who can receive deliveries, since painted components are not something to leave in a shared loading area.

Cover delivery, packaging and container logistics

For projects sourcing cabinets from overseas, the installation plan should extend back to the freight. Specify the crate labelling so each box matches an elevation drawing, the sequence of crates against the installation order, and who clears customs and books the tail run to site. Where the kitchen travels with other fit-out items — wardrobes, vanities, doors — a single consolidated shipment reduces handling damage and duplicate delivery fees. Our logistics and door-to-door delivery service covers freight by sea, air and rail with the packing lists and shipping paperwork handled for you.

State what "installed" means at handover

A handover section prevents arguments about completion. List the acceptance criteria: doors and drawers opening without rub, a consistent reveal across the run, no visible scribe gaps, all hardware adjusted, splashbacks sealed, lighting circuits tested, and offcuts and spare panels left on site for future repairs.

  • Doors aligned to an even reveal; magnetic catches engaging without force
  • Drawers running smoothly with no front tilt under load
  • Scribed ends tight to the wall, caulk lines neat and colour-matched
  • Paint finish free of chips, runs and handling marks after final cleaning
  • Cut-outs verified against the appliance schedule before it is signed off
  • Spare panels, hinges and runners documented and stored on site

How a supplier should support your plan

If you are coordinating cabinets alongside flooring, joinery and other fit-out items, ask the supplier to put the same information into one pack: elevations with dimensions, the finish schedule, the packing list keyed to those elevations, and installation guidance for the site team. We work this way on custom kitchen cabinet packages for residential and hotel projects, and our installation and after-sales support covers on-site fitting, snag inspection, spare parts and maintenance follow-up.

Send us your drawings or a site survey, and we will return elevations, a finish schedule and a delivery sequence you can hand straight to your builder — so the installation plan is written before the first crate leaves the factory, not improvised on the day.