A set of wooden sliding panels looks simple on a drawing: two or three leaves, a track, a wall opening. On site it is one of the least forgiving items to order late and get wrong, because the panels have to work with an opening that already exists, a floor level that has been set and a joinery line other trades are measuring against. The risks below are the ones we see most often in project enquiries, and each of them can be closed out before a purchase order is raised.

Risk 1: Dimensions taken from drawings instead of the built opening

Sliding panels for wardrobes, closets, room dividers and media walls are made to the opening, not to the nominal grid on a plan. Floor finishes, wall linings, skirting, plaster buildup and door frames all change what is left between the finished faces. Order from a survey of the completed opening — width at high, middle and low points, depth of the reveal, and the finished floor level — and record the numbers the site team signed off, not the numbers on the tender drawing.

Our Wooden Sliding Panels are made to measure for each project, with layout, material and finish specified per opening. That only pays off when the dimensions you send match what was built, so we ask for confirmed site measurements before production starts.

Risk 2: Track, hardware and clearances decided after the panels are designed

The panel leaf is the easy part; the running gear decides whether the system works. Before ordering, confirm which of these governs your detail:

  • Track type and position. Top-hung or floor-guided, surface-mounted or recessed, single or multi-track — each needs a different head condition and a different pocket depth.
  • Stack and travel. How many leaves, which direction they stack, and whether they bypass or align on one line. This sets the minimum opening width and the length of track available.
  • Clear floor build-up. A bottom track competes with threshold, tile and screed heights. Decide this before the floor is laid.
  • Leaf weight and handle detail. Solid-core and veneered leaves need hardware rated for the weight, and a recessed pull changes the panel edge detail.
  • Access and servicing. Ask how the track will be cleaned and how a leaf is removed if the building needs to change later.

For divider applications, our Partition Sliding Systems listing is written the same way — made-to-measure sizing with track, hardware and opening dimensions to be confirmed for each project. If your detail calls for an acoustic separation rather than a visual one, specify that at the enquiry stage, because Acoustic Sliding Panels are a different build and need the performance target stated in writing.

Risk 3: Finish and material specified by picture, not by sample

Veneer matching is where project teams get burned. A render or a phone photo cannot carry grain direction, cut match, sheen level or the colour cast of a lacquer. For any wood-look panel specify the species and cut, the grain layout across adjacent leaves, the sheen band, and whether edges, jambs and handles are to be matched or contrasted. Then approve a physical sample before the batch is produced.

The same applies inside the reveal: if the panel face continues into an adjoining wall panel or a concealed door, both items must come from one production run with one approved sample, otherwise the join will read as two products.

Risk 4: Splitting panels and frames across suppliers

When sliding leaves come from one supplier and the frame, track cover and adjacent cabinetry from another, tolerance disputes start after delivery. Whoever supplies the opening line should coordinate the reveal, the head detail and the hardware schedule. Our one-stop furniture and building materials supply covers built-in joinery, wall systems, doors, cabinetry and finishes together, which keeps one party accountable for the fit.

Risk 5: Packaging, freight and storage on site

Wooden panels are damaged in transit and on site more often than in production. Confirm edge protection, panel orientation in the crate, crate markings against the opening schedule, and the moisture condition of the store where they will sit before installation. Panels left standing against a wet wall on a live site will not hold their dimensions. Our logistics scope covers sea, air and rail freight, packaging and container loading, customs documentation and door-to-door delivery, so the handover point and packing standard are agreed with you rather than assumed.

Risk 6: Installation sequence and who owns the snag list

Sliding panels go in after flooring, painting and ironmongery are settled, but before final handover. Name the installer, the setting-out responsibility and the acceptance test — smooth travel across the full run, no leaf rub, consistent gaps, secure hardware — in the order documents. We provide on-site installation support, inspection with a snag list, and spare parts or replacement for later maintenance, so the acceptance criteria are agreed before the panels leave the factory.

Pre-order checklist

  • Surveyed opening dimensions signed off by site, taken after finishes.
  • Track type, mounting method and head/reveal detail drawn and agreed.
  • Number of leaves, stacking direction and minimum opening width confirmed.
  • Hardware schedule with leaf weight and handle/pull detail.
  • Approved physical finish sample, including grain match across leaves.
  • Acoustic or fire performance target stated in writing where required.
  • Packing standard, crate markings and on-site storage condition agreed.
  • Installer, sequence and acceptance test named in the order.

How to send an enquiry that comes back with a real price

Send the opening schedule, a section through the head and threshold, the finish you want matched, and the target programme date. With those four items we can return a quotation with the specification confirmed rather than a placeholder, and flag any clearance problem while it is still cheap to change. Send drawings through our contact page and we will confirm dimensions and selected specifications for each project before production.

SANTERSON has manufactured furniture and building materials since 2008, with custom sizing and finish options for sliding panel systems and coordinated delivery, installation support and after-sales service for villa, hotel and office projects. Contact PHILLIP on +86-13928214007 or santerson@qq.com to review your panel schedule.