A bar unit looks like one small item on a villa or apartment schedule — until the site survey comes back, the countertop supplier changes their stone thickness, and the appliance you were told to design around is no longer available. Before SANTERSON puts an integrated bar system into production, we ask buyers and designers to close out ten specific decisions in writing. Here is the list we work from.
1. What the bar is actually for
The same footprint behaves very differently depending on use. A dry entertaining bar for a villa living room needs glass shelving, bottle storage and a small prep surface. A wet bar needs water supply, drainage, and a machine that can handle daily service in a show home or clubhouse. Tell us the service pattern — weekend entertaining, daily family use, or event catering — because it drives waterproofing, power, and how much of the unit we build as closed storage versus open display.
2. The opening dimensions, taken on site after the finishes are fixed
Our Santerson Integrated Bar Systems are made to measure, so we work from field dimensions rather than a standard size. The measurements that cause the most rework are taken too early: floor-to-floor height before the final floor build-up, and wall-to-wall width before the final plaster or wall paneling is on. Send us the opening as it will be after wet trades and finishes are complete, plus ceiling height, skirting detail, and any rebate the unit has to sit into.
3. How the unit meets the surrounding cabinetry
An integrated bar is judged by its joints. If it sits beside kitchen cabinets from another supplier, we need that vendor's carcass depth, door thickness, handle detail and plinth height before we design the transition. Where the whole wall comes from one factory, we set the reveals ourselves and keep the run consistent. This is also the point to decide whether you want a flush, shadow-gap or overlapped reveal — it changes both the drawing and the site tolerance.
4. Materials and finish, with physical samples signed off
Finish names travel badly across languages and screens. Choose from physical samples rather than a code on a datasheet, and confirm the substrate as well as the surface: wood veneer, lacquer, acrylic, melamine or laminate behave differently at edges, on curved fronts and around integrated handles. For bar fronts specifically, ask how the finish takes fingerprints and cleaning products — high gloss in particular looks different after six months of daily use than it does in the showroom.
5. Appliances, sinks and taps: model numbers on the drawing
Anything that goes inside the carcass must be named before we cut. Wine cabinet, under-counter fridge, ice maker, dishwasher drawer, sink bowl, tap, glass washer — each needs a specific model, its cut-out dimensions, ventilation requirement, door-swing direction and electrical load. If an appliance is not yet selected, tell us which sizes you are considering so we design the bay to accept more than one option and leave the adjustment detail in.
6. Services: water, waste, power and data routes
Send a services drawing that shows where supply and waste enter, where isolators sit, socket positions, and how the unit is earthed. We then design the carcass with the correct cut-outs and access panels so nothing has to be chased into a finished cabinet on site. If lighting is built into the bar, confirm transformer and driver locations — they need to stay reachable for maintenance.
7. Countertop and splashback interface
Decide early who supplies the stone or sintered stone top and who supplies the matching splashback. If it is us, we need the slab selection at the time of order, not after the carcasses ship. If a local fabricator supplies it, send their template thickness, edge profile and the setting-out dimension so our cabinet heights and support rails match. A mismatch here is the single most expensive late change on a bar job.
8. Interior configuration and hardware
Specify what goes in each bay: stemware racks, bottle shelving spacing, drawer internals for glassware, spice or garnish storage, pull-out trays, hidden bins. Hardware is a separate decision from the carcass — hinge brand, soft-close specification, runner load rating and handleless versus handle detail all get quoted differently. We build to what you specify; if hardware is left open, the price we quote and the unit you receive will not line up.
9. Lighting and electrical integration
Integrated LED in shelves, under-counter toe-kick lighting, and inside glass-front bays each need a decision on colour temperature, dimming method and control source. Confirm whether the bar lighting runs on its own circuit or joins the room scene, and which control system the site uses. We route the wiring and provide the driver positions; your electrician makes the final connection.
10. Delivery split, access route and installation sequence
Tell us how the unit reaches the building: service lift dimensions, stair widths, corridor turns and whether the site is occupied during delivery. A long bar run may ship as sections that are joined on site, which needs a setting-out line and a level floor at handover. We also confirm who carries out installation and who signs off the snags — our team on site, or your contractor following our assembly drawings.
Sign-off list before we release to production
- Field dimensions re-taken after finishes, and initialled by the site lead
- Appliance schedule with model numbers, cut-outs and electrical loads
- Services drawing: supply, waste, isolators, sockets, earthing
- Signed physical finish sample and substrate confirmation
- Countertop supplier named, with thickness and edge profile
- Hardware specification: hinges, runners, handle detail
- Lighting schedule with driver locations and control method
- Delivery route survey and installation responsibility agreed
Related bar configurations in the same collection
If the space does not suit a full integrated system, two other configurations from our Bar Cabinets range are built to the same made-to-measure process: Santerson Island Bar Units for bar fronts built into a kitchen island, and Santerson Compact Bar Cabinets where the footprint is limited. Both take project-specific dimensions, materials and finish options, so the same sign-off list applies.
Dimensions, materials, finishes and hardware for this range are confirmed per project; nothing on the product page should be read as a standard specification.
Where SANTERSON fits in the process
As a one-stop furniture and building materials supplier, we can take the bar together with the surrounding cabinetry, wall paneling and joinery from one factory, which removes most of the interface risk described above. Our custom and OEM service covers bespoke dimensions, finishes and branding; logistics covers freight and door-to-door delivery; and installation support is available for site handover. Terms, scope and lead times are agreed per project.
Send us the drawings early
Share your layout, opening dimensions and appliance schedule and we will return a build drawing with the gaps flagged before you commit the order. Contact SANTERSON — enquiry response within 24 hours during business days (GMT+8).
Contact page · santerson@qq.com · +86-13928214007