A lazy Susan corner cabinet looks simple on a kitchen elevation, but it is one of the few units where the internal hardware, the carcass size and the surrounding run all have to agree before anything can be cut. Send a supplier only a drawing of the corner, and you will get a price that has to be reworked. Send the information below with your first enquiry, and the quotation you receive can actually be built.

Start With the Corner Itself, Not the Hardware

Our Lazy Susan Corner Cabinets are made to measure, so the first thing we need is a definition of the corner space rather than a request for "a 900mm corner unit". Please include:

  • The two clear wall-to-wall runs that form the corner, measured in millimetres, and whether each run is straight or has a return.
  • The finished wall line — plasterboard, tiled, stone-clad or already finished — because that changes where the carcass face sits.
  • Obstructions inside the corner: soil stack, gas pipe, electrical box, window reveal, radiator, or an existing skirting that must be cut around.
  • The finished floor level at the corner and whether the base will sit on an adjustable plinth or a continuous toe kick with the rest of the run.
  • Whether the corner is a true 90° angle. A 45° angled corner, or anything out of square, needs to be stated plainly — it changes both the carcass and the shelf hardware.

The Hardware Decision Drives the Carcass Size

"Lazy Susan" covers several different mechanisms, and each one demands a different cabinet. Tell us which you want, or tell us what you intend to store there and we will recommend one:

MechanismHow it behaves in useWhat we need from you
Rotating half-moon shelves on a central postShelves turn together; the front door opens and the shelves swing out with themDoor type, door opening direction, and whether tall items or small appliances must be reached
Two-tier magic corner (pull-out baskets on a linked rail)Pulling the door draws both tiers forward out of the cabinetCabinet width at the corner and how deep the adjacent run is, since the rail needs clearance
Single carousel shelfOne rotating shelf for pots, bins or bulk goodsIntended load and whether the shelf must clear a sink bowl above
Bi-fold or door-mounted corner systemFitted doors fold as the baskets come forwardWhether the corner doors should match the rest of the kitchen front style

If you have no preference, say so and give us the storage purpose. A corner next to the hob usually wants pans within one arm's reach; a corner at the end of a pantry run usually stores dry goods and bins. That single sentence changes what we quote.

Specify How This Corner Joins the Rest of the Kitchen

A corner unit is rarely ordered alone. To price it as part of a run rather than an isolated box, include:

  • The adjacent units on both sides — their widths, and whether they are base, tall or drawer stacks. Where the layout turns twice, our L Shaped Corner Cabinets and U Shaped Corner Cabinets are usually the better fit than a carousel.
  • Worktop material and thickness, and whether the worktop continues over the corner or is cut in two pieces. Stone tops need the carcass square set out before templating.
  • Whether a sink bowl, hob or appliance crosses into the corner. A bowl over a lazy Susan shelf is a common source of rework.
  • Carcass and door construction: handleless profile, shaker front, high gloss lacquer, matte acrylic, melamine or wood veneer — plus the colour reference or RAL/finish code if you have one.
If your corner has no mechanism specified yet, our Pull Out Corner Cabinets are worth pricing alongside the carousel. Pull-out baskets reach into a dead corner without a rotating post and free up shelf depth for taller items.

Project Details That Change Price and Delivery

Cabinetry for a single apartment and cabinetry for a villa or hotel floor are quoted differently. Along with the drawings, please state:

  • Quantity — one corner, or the same detail repeated across several kitchens. Repeated units let us fix a hardware package once instead of solving each corner separately.
  • Project location and delivery address, so we can quote freight to site rather than to port.
  • Whether you are buying carcass only, or carcass with doors, worktops and integrated lighting. Our Custom Built-in Kitchen Cabinets cover residential and hotel fit-outs, where the same corner detail often repeats across many units.
  • Your required site date. Corner hardware arrives with the carcass panels, so a late change of mechanism stops the whole kitchen run, not just that unit.
  • Who is installing on site — your joiner, our installation team, or a local contractor. This decides whether we ship flat-packed with assembly drawings or partly assembled.

Drawings and Files That Speed Up the Quotation

Any of the following helps; none is mandatory:

  • A dimensioned plan of the kitchen, even a hand sketch with measurements.
  • Elevations showing worktop height and where tall units sit relative to the corner.
  • A photograph of the existing corner, taken from both sides, with a tape measure visible.
  • The appliance schedule for anything built in near the corner.
  • A reference image of the mechanism you like — a screenshot is enough to confirm which hardware family you mean.

What You Should Get Back From a Proper Quotation

Before you accept any corner cabinet price, check that the quotation states:

  • Carcass width and depth at the corner in millimetres, not just "standard corner unit".
  • The named mechanism, its load rating, and which side the door hinges on.
  • Minimum and maximum shelf height spacing, so tall bottles or small appliances are checked before production.
  • Whether the plinth, toe kick and scribe filler are included.
  • Finish code for doors and carcass edges, and whether edge banding matches both faces.
  • Packaging method and how the corner carcass ships — assembled or flat-packed.

A short version of the enquiry we can price directly

  • Two corner run measurements in mm, plus wall finish and floor level.
  • Obstructions in the corner, and whether the angle is exactly 90°.
  • Preferred mechanism, or the intended storage use.
  • Adjacent unit widths, worktop material and thickness, and any sink or hob near the corner.
  • Door style and finish code; quantity of identical corners.
  • Project address and required site date.

Send that much detail and the first quotation is usually close to the final one. Where a project needs matching cabinetry across kitchens, wardrobes and storage walls, we handle it as one package under OEM Furniture Manufacturing — design, prototyping, material selection and production coordinated together.

Send us your corner dimensions

Email the measurements, a photo of the corner and the mechanism you have in mind, and we will return a quotation with carcass sizes, hardware specification and freight to site. Phone or WhatsApp: +86-13928214007 (PHILLIP) — santerson@qq.com.