A swim spa quote is only as good as the information behind it. Send a model number on its own and you will get a price for one fixed configuration — which usually changes again once site conditions, options and freight are discussed. Below is the practical list of details that lets us price Outdoor Swim Spa WS-SP500-MS properly in one pass, and it works just as well for any other model in our outdoor swim and hydrotherapy range.

Start with the site: footprint, access and support

The catalogue shell for this model measures 5000 × 2500 × 1600 mm. Treat that as the starting point for a site check, not as the final dimension — coping, steps, plant clearances and any enclosure will change what the opening actually needs. Tell us:

  • Whether the spa sits above ground on a slab, recessed into a deck, or partly sunken — and the finished rim height you want.
  • The load-bearing support under the full footprint. A filled shell of this size is heavy, and a builder's drawing that shows only the outline is not enough for us to check it.
  • Access routes at both ends: gate widths, turning space, crane or lift requirements if the delivery truck cannot reach the pad.
  • Drainage, overflow and any plant-room location, plus how far the electrical supply will come from.

Configuration: what is in the box versus what you add

The specification published for WS-SP500-MS lists one control system, one swim training system, one filter pump, 29 jets and four LED lights, with a total power figure of 11.55 kW. The water pump line is the clearest example of why we confirm configuration before quoting: on some entries in this series that line is not filled in at all, while our catalogue lists water pumps as an option for these models. Alongside it sit heat pumps, UV sterilisation, sand filtration, insulation and steps — availability differs by model, so please say explicitly which of those you want included, and which your local contractor will supply.

It is also worth comparing the two closely related entries in this size class. WS-SP500 and WS-SP500-MS share the same 5000 × 2500 × 1600 mm shell, but the jet count and total power shown for each differ noticeably between the two pages. That is exactly why we reissue a confirmed specification against your chosen options instead of working from the catalogue sheet alone.

Item we need from youWhy it changes the price
Catalogue model and reference photoFixes the shell size and base equipment set
Options list (heat pump, UV, sand filter, insulation, steps, extra pumps)Adds or removes line items and affects power draw
Total load your supply can deliver, in kWDetermines whether the published configuration fits your board
Voltage, phase and frequency at the siteDrives, pumps and controls are specified to the local supply
Control preference (on-unit panel or remote)Changes the control system quoted
Water treatment approach (ozone, UV, chlorine or salt)Affects dosing equipment and filtration scope

Use, users and how hard it will be worked

The same shell serves very different programmes. A resort spa running long daily hours with high guest turnover needs heavier filtration capacity, more robust finishes and easier maintenance access than a private villa used a few times a week. Let us know:

  • Private residence, hotel, gym, rehabilitation centre or development amenity.
  • Expected daily running hours and peak simultaneous users.
  • Whether the swim training system is used for casual counter-current swimming or structured lap training — this affects jet layout and how many jets you actually want active.
  • Target water temperature and whether year-round use is intended, since that drives heat pump sizing and insulation.

Local regulations and the person who signs off

Electrical connection, barrier and fencing requirements around water features, and any permits for an in-ground installation are handled locally. We do not decide those for you, but we need to know who does: your electrical contractor, pool builder, architect or local authority. Send the requirement documents or the relevant clauses, and we will match the equipment specification and labeling to them rather than guessing.

Delivery, freight and handover

As a one-stop furniture and building materials supplier, we handle international freight for projects — sea, air and rail, with the associated paperwork such as commercial invoices and packing lists. To quote landed cost rather than just ex-works price, we need:

  • Delivery city, port or precise site address, and whether the site is truck-accessible.
  • Your preferred Incoterms — EXW, FOB, CIF or door-to-door.
  • Import arrangements: who acts as importer of record, and any documentation your customs broker requires.
  • Target on-site date, working backwards from the construction programme.
  • Quantity: single unit for a villa, or multiple units for a hotel or development, since batch production and container loading change both price and schedule.

Budget range and decision timeline

A realistic budget band helps us avoid quoting the wrong tier. It lets us propose sensible option combinations instead of a bare shell, and flag early where your wish list exceeds the envelope so the trade-offs happen on paper rather than on site. Equally useful is the decision timeline — when you need a firm price, when the design must be frozen, and when the spa has to be on site.

A ready-to-send enquiry template

Copy this into your email and fill in what you know:

  • Model: Outdoor Swim Spa WS-SP500-MS (or closest alternative you would consider)
  • Project type and location; site address or nearest port
  • Installation type: above ground, recessed or partly sunken; support structure details
  • Site access constraints and crane needs
  • Supply available on site: voltage, phase, frequency, available kW
  • Options wanted: heat pump, UV sterilisation, sand filtration, insulation, steps, additional pumps
  • Daily running hours, user numbers, target water temperature
  • Water treatment preference and maintenance responsibility
  • Local compliance documents we should design to
  • Preferred Incoterms, importer of record, required on-site date
  • Budget band and quotation deadline; quantity required

Send whatever you already have — partial information is fine, and we will come back with the specific gaps rather than a vague estimate. Because our range also covers outdoor furniture such as pergolas, daybeds and loungers, alongside wall panels, cladding, bathroom ceramics and lighting, projects often group a swim spa with the surrounding terrace fit-out in one order. That single coordination saves duplicated site measurements and mismatched finishes between trades.

One point on specifications: figures published on a product page describe the catalogue configuration for that model, and closely related variants in the same size class can show different jet counts and power totals. Treat them as the starting reference for your enquiry; expect a confirmed specification to be reissued against your selected options and local supply before production starts.

Send your site details and configuration list and we will return an itemised quotation for WS-SP500-MS, including freight to your delivery point.

Contact: PHILLIP  |  Phone / WhatsApp: +86-13928214007  |  Email: santerson@qq.com  |  Enquiry page: Contact Us

SANTERSON has manufactured furniture and building materials since 2008, with project work across villas, hospitality and office developments. Installation, warranty terms and response commitments are confirmed in writing per project.