A gazebo rarely gets approved on a drawing alone. On hospitality and villa projects, the shelter that sits beside the pool or anchors a courtyard terrace usually has to pass through a submittal review first - the package that shows the reviewer exactly what is being supplied, how it is built, and how it will be fixed down. For our Double Roof Hardtop Aluminum Gazebo with Privacy Curtains, the submittal is where a good design intent either survives or quietly falls apart in value engineering. Below is what we expect to see in that package, written from the point of view of the person who has to assemble it and the person who has to sign it off.

Start with the configuration you are actually buying

The first page of a weak submittal is a generic brochure image. The first page of a usable one is a dimensioned layout of the specific unit for this site: overall footprint, clear height under the lower roof tier, post centres, and the finished floor level the gazebo will sit on. Because we adjust pavilion dimensions, frame finish and curtain colour per project, the submittal must state those choices explicitly rather than refer back to a catalogue page.

  • Overall plan size and the position of every post, with the anchoring method shown.
  • Total height including both roof tiers - the double-tier profile changes the elevation, not just the plan.
  • Frame colour and surface finish as named codes, not a photo swatch.
  • Curtain fabric reference, colour, and whether curtains are supplied on all sides or only on the exposed ones.

Explain the double roof, because that is what you are paying for

The gap between the upper and lower roof layers is not decoration. Hot air collects under a hardtop on a sunny day; the air gap lets it escape, so the space underneath runs cooler than the same footprint under a single-layer top. Reviewers who have only seen soft-canopy structures tend to question that detail or ask for it to be deleted to save cost, so the submittal should carry a simple section drawing through the roof build-up: top deck, air gap, lower deck, and how the two are tied together.

The rigid metal roof is the other half of the argument. Against heavy rain and wind it holds its shape and does not need replacing at anything like the frequency of a fabric canopy - which is exactly why a resort outdoor restaurant or a hotel leisure courtyard keeps using the same structure season after season. Put that lifecycle point in writing; it is usually the line that protects the specification.

Give the curtains their own schedule

Privacy curtains on this type of shelter do a specific job: they let users switch between an open view across the garden and an enclosed private dining space. That is a functional requirement, not an accessory, and it should be documented as one.

ItemWhat to record in the submittal
FabricWeave or material type, colour reference, and whether the fabric is intended for outdoor exposure
TrackingHow curtains hang and draw - track, ring or tie-back - and where the operating side faces
CoverageWhich elevations get full-height curtains and which are left open for circulation
RemovalWhether curtains can be taken down for cleaning or for storm periods, and how
Spare quantityWhether replacement panels are available for the same colour reference later in the project

Curtain hardware is the item most often swapped out on site by a contractor who assumes it is interchangeable. If the track is fixed to the roof frame, say so in the submittal and show the fixing.

Structure, anchorage and the ground it lands on

A hardtop gazebo is a roof with nothing around it to stiffen it, so the reviewer will look for how it resists wind and how it transfers that load into the ground. Our product page describes the roof as performing well under heavy rain and wind; what the submittal has to add is the interface - the frame profile, the post-to-base connection, and what the base is bolted to.

  • Post section and wall thickness, with the joint detail at beam-to-post corners.
  • Base plate detail: plate size, bolt type, bolt count per post.
  • Substrate condition - slab thickness and reinforcement where known, pad footings where there is no slab.
  • Whether the gazebo sits on an existing paved terrace, a new concrete pad, or a timber deck, since each changes the fixing.

Local load requirements differ by site and by country. We supply the structure and its fixing details; the engineer of record for the project confirms anchorage against local wind and loading requirements. State that split clearly in the submittal - it is the fastest way to stop a package bouncing between consultant and contractor.

Coordinate the gazebo with what goes under it

This structure rarely stands alone. It gets paired with dining sets to form an independent outdoor dining pavilion beside pools or in courtyards, and that pairing has to appear in the submittal, otherwise the furniture arrives after the anchorage is cast and the layout no longer works.

Check the clear opening between posts against the table and chair layout you intend to place inside it. Confirm door and service routes are not blocked once curtains are drawn. If lighting or a power outlet is planned under the roof, note whether conduit runs inside the frame or on its surface, and where the take-off point sits relative to the finished floor.

Where the wider terrace is being furnished as one scheme, we can coordinate the shelter with matching seating from the same furniture series, so the frame finish on the gazebo and the armrest caps or table tops on the dining set are drawn from the same material palette rather than matched by eye after delivery.

Close the package with supply terms, not promises

The last section of a submittal should be factual and short: lead time for the configuration as specified, packing and container arrangement, what arrives loose versus assembled, and who is responsible for lifting and fixing on site. Where a project is being furnished through our one-stop solution scope, the gazebo travels with the rest of the outdoor package rather than as a separate order, which is worth stating because it changes how many deliveries the site has to receive.

If the shelter needs to be matched to a different span or an unusual plan shape, that goes through custom and OEM service, and the submittal should then carry a shop drawing for approval before production starts, not after.

Before you submit: confirm dimensions against the site survey, confirm the curtain colour reference in writing, and have the project engineer review anchorage. Anything left as "to be confirmed on site" will come back as a query.

Send us the drawing and we will build the submittal around it

If you are specifying this gazebo for a resort outdoor restaurant, a villa backyard, a club terrace or a hotel leisure courtyard, send the layout and we will return a dimensioned package with the frame finish, curtain specification and fixing detail already filled in - the version a consultant can actually review. Contact us with the span you need and where the shelter is going.