A U-shaped walk-in wardrobe is the layout most often requested when a bedroom has a dedicated room or a large alcove, because storage runs along three walls and the floor in the middle stays free. It is also the layout where an enquiry goes wrong most easily: a drawing that shows only overall width and depth cannot be turned into a made-to-measure quotation, because hanging heights, circulation between the arms of the "U", door swing and finish choices all change what the carcass actually needs to be.

The list below is the information our workshop uses when it prices and builds U Shaped Walk in Wardrobes for villa and apartment projects. Send what you already have; missing items are something we can help resolve during the design stage rather than a reason to delay an enquiry.

1. Room dimensions, taken at three heights

Record the length and width of each wall the wardrobe will run along, plus the ceiling height. Take width and depth at floor level, mid-height and near the ceiling rather than only once: older villas and apartments rarely have walls that are square or plumb, and a difference of a few centimetres between two ends of the same wall decides whether we build a scribe panel, an out-of-line carcass or a recessed reveal.

  • Clear distance between the two facing runs — this is the space you will stand and change in.
  • Depth of each run, measured to the finished wall face, including any skirting, plaster buildup or pipework.
  • Floor-to-ceiling height at several points, so we know whether the top section can be built to the ceiling or must stop below it.
  • Position of beams, downlights, sprinkler heads, air-conditioning grilles and any bulkhead that cuts into the upper zone.

2. Circulation between the two arms

In a U layout the open side is the entrance, and the two facing runs face each other across it. Tell us the clear width you intend to keep, and whether the doors of both runs are expected to open at the same time. A wardrobe planned around a narrow standing space usually works better with sliding or bifold fronts, while a wider room can carry hinged doors and a full-height mirror panel without blocking anyone.

3. What has to be stored, counted rather than estimated

Internal zoning follows from an item count, not from a general idea of "plenty of space". For each user we ask for the number of long hanging items, short hanging items, folded stacks, shoes, bags, suitcases and any item that needs a lockable or dust-free compartment. Those counts translate directly into how many rails, shelves and drawer stacks fit on each wall.

Storage typeWhat we need from you
Long hangingCount of coats, dresses and gowns; the length of the longest piece.
Short hangingCount of shirts, jackets and trousers; whether double rails are wanted.
Folded storageNumber of shelf stacks per user and the tallest stack to be kept reachable.
DrawersNumber of drawer banks, and whether underwire or small accessories need dividers.
Bulky itemsSuitcase dimensions, ironing board, vacuum cleaner or seasonal luggage location.
DisplayWhether any section should be glass-fronted or lit, and what goes inside it.

4. Door style and clearance in front of the wardrobe

The door decides how much floor you lose when the wardrobe is in use. Send us a note on the preferred opening — hinged, sliding, bifold or open shelving with no front — and confirm there is room in front of the open side for the door to travel. If glass fronts are under consideration, tell us which glass you have in mind; we build Glass Walk in Wardrobes with clear, frosted and tinted options, and the hardware set differs between them.

5. Material, finish and edge detail

Confirm the board substrate you want specified for the project, the surface finish (matte, high gloss, lacquer, veneer or wood-effect), the colour reference or sample number, and the edge treatment on visible ends. Where a bedroom already has cabinetry or doors, send the existing finish reference so the new run matches rather than sits beside it.

Handleless fronts give a flat, uninterrupted surface but need a profile or a recess to grip; a handle changes the clearance needed between facing runs. Tell us which you prefer before we fix the dimensions, not after.

6. Services and interfaces on the three walls

Send an annotated set of the electrical and plumbing drawings for the room: socket positions, light switches, reading-light wiring, downlights, and any pipe or riser that runs behind the carcass. Internal lighting needs a driver location and a switch or sensor position, and these are far cheaper to resolve on paper than on site.

7. Floor, wall and ceiling finishes at handover

Tell us which finishes will be installed and their thickness — tiled floor with adhesive, engineered timber on battens, plastered or panelled walls, cornice at the ceiling. A wardrobe built before the floor finish goes down needs a different base detail than one installed after it. The same applies where the run meets L Shaped Walk in Wardrobes or another built-in unit: state which unit is installed first and who supplies the transition.

8. Site conditions that change the build

Three site conditions change what we fabricate, so state them even when they seem minor: whether the floor is heated and how the carcass base should sit over it; whether external doors or windows open into the wardrobe zone and need a reveal; and whether the room sits on an upper floor with a lift or stair constraint that limits the length of a panel that can be carried in. Long full-height side panels and island tops are sized around that access route, not only around the drawing.

9. Documents to attach to the enquiry

  • A plan of the room with dimensions marked, plus elevations of the three walls.
  • Photographs of the space from each corner, including the ceiling and any obstructions.
  • The interior-design drawing or mood board for the bedroom, if one exists.
  • Project location, target handover date and the quantity of identical rooms, where a development repeats the same layout.

A note on figures: our U-shaped wardrobes are made to measure, so hanging heights, run depths and overall dimensions are set from your drawings and confirmed with you before production. Any dimension quoted back to you comes from that confirmed drawing set rather than a standard catalogue size.

How this fits into a wider fit-out

Where wardrobes are part of a villa or hotel package, we coordinate them with the cabinetry, doors, wall panelling and lighting for the same rooms so that finishes, reveals and installation sequence are handled by one production schedule. Our Custom Minimalist Bedroom Wardrobe range covers bedrooms where a full walk-in room is not available but the same finish language is wanted across the property.

Send your drawings and the item counts above. Our team reviews the wall elevations, circulation width and finish references, then returns a layout and quotation built to your confirmed dimensions. SANTERSON has manufactured furniture and building materials for villa, hospitality and office projects since 2008, with custom/OEM production, door-to-door delivery and installation support. Contact PHILLIP by phone or WhatsApp on +86-13928214007, or email santerson@qq.com.