Flush interior doors look simple on a schedule and cause the most rework on site. This guide sets out what a procurement team should capture before placing an order for Santerson Flush Interior Doors, so that drawings, finishes and opening dimensions match the installation stage instead of being reconciled in front of a completed wall.
Why flush doors deserve their own documentation pack
A flush interior door is a flat leaf without moulded panels or decorative routing. Almost all of its visual value comes from how the leaf, frame and surrounding wall meet. A millimetre out in the rebate, a finish that does not match the joinery opposite, or a floor level that moved after the door schedule was issued, and the result is visible every day for the life of the building.
Santerson Flush Interior Doors sit within our wider Windows & Doors range and are made to measure, with material and finish options specified per project. Because the specification is set by the buyer rather than picked from a stock catalogue, the quality of your documentation directly determines the quality of the delivered product. The same discipline applies across our Decorative Interior Doors and Flush Hinged Doors.
Item 1: the opening, not just the leaf
Record the structural opening for every door position and state clearly which dimension is finished and which is structural. A schedule that lists only a leaf size leaves the frame allowance to interpretation.
- Clear opening width and height, with the reference level used (finished floor or sub-floor).
- Wall build-up at the opening: substrate, any cladding or panel finish, and total wall thickness.
- Whether the frame is to sit proud, recessed, or aligned with the wall face.
- Floor finishes on both sides of the opening and their final thicknesses.
- Tolerance band you will accept on site, agreed in writing before production starts.
Item 2: the finish reference, in physical form
Colour names do not survive an ocean shipment as a reliable reference. For each door type, record the finish family, the sheen level and a physical sample or manufacturer code that both sides can hold up to the delivered leaf.
- Finish family: painted, lacquered, veneer, laminate or textured surface.
- Sheen: matte, satin or high gloss. Gloss levels change how visible a flush joint is.
- Grain direction and matching rule when doors sit beside wardrobes or wall panelling in the same finish.
- Sample approval record: date sent, date approved, who signed it off.
Where a door is meant to disappear into a wall, note that requirement in writing. Concealed and wall-aligned designs are specified differently from a standard hinged leaf, and the hardware expectation changes with them. Our Flush Wall Aligned Doors and Handleless Concealed Doors pages are the reference points to attach to those positions on the schedule.
Item 3: hardware and interface responsibilities
Most disputes over flush doors are not about the leaf. They are about who supplied what into the opening. Document the interface explicitly.
| Interface item | What to record |
|---|---|
| Leaf and frame | Who supplies the frame, architrave or casing, and whether they arrive finished. |
| Hinges and ironmongery | Concealed or surface-mounted, load rating agreed for the leaf, quantity per opening. |
| Handles and edges | Rebate, handle-less edge detail, or pull detail for sliding positions. |
| Seals and acoustic items | drop seals, intumescent strips and thresholds if the schedule calls for them. |
| Glazing | Glass type and thickness where a flush leaf carries vision glazing. |
| Wall junction | Shadow gap, trim-less detail or architrave, agreed on a detail drawing. |
Item 4: the schedule itself
A single door schedule, version-controlled, prevents most of the arguments described above. Each line should carry a unique tag that appears on both the drawing and the packing list, so that a site team can find the right leaf without opening every crate.
- Door tag, room, quantity, size, finish code and hardware set.
- Left-hand or right-hand orientation, and whether the leaf opens inward or outward.
- Packaging mark that matches the tag, confirmed before loading.
- Revision history with dates, so a superseded dimension is easy to identify.
Item 5: delivery, storage and installation sequence
Flush doors are sensitive to how they travel and to where they sit before hanging. Add the handling record to the procurement file rather than leaving it with the site foreman.
- Packaging method and container loading plan for the door line.
- Storage conditions on site: flat, dry, off the ground, away from wet trades.
- Installation window relative to painting, flooring and joinery installation.
- Snag inspection after hanging, with sign-off per door tag.
Our Logistics & Door-to-Door Delivery service covers freight forwarding, packaging and container loading, customs paperwork and shipment tracking. The Installation & After-sales Support page describes on-site installation, inspection and snagging, and spare parts or replacement. Terms, response times and coverage vary by project and country, so confirm them for your specific package rather than assuming a standard level.
How this fits a wider fit-out package
Doors rarely sit alone. They align with wardrobes, media walls, panelling and skirting, and the finish has to hold across all of them. When doors are ordered together with the cabinetry and surfaces they touch, one sample set governs the whole wall, and the tolerance detail is drawn once instead of renegotiated by three suppliers.
As a one-stop furniture and building materials supplier, we produce doors alongside cabinetry, wardrobes, wall panels, flooring, lighting and bathroom products for villa, hospitality and office projects. Where a project needs a non-standard leaf, our Custom & OEM Service covers bespoke finishes and textures, prototyping and made-to-measure production.
A short pre-order checklist
- Survey date recorded for every opening, with the reference level stated.
- Wall build-up thickness confirmed at each door position.
- Physical finish sample approved and signed off, not just a colour name.
- Hardware responsibility split between supplier and site contractor written down.
- Door tags identical on drawings, schedule and packing list.
- Detail drawing for the wall junction agreed before production.
- Storage and installation sequence issued with the delivery plan.