A corner storage unit looks like a small item on a bathroom schedule, yet it is one of the easiest things to get wrong on site. The reveal depth changes, the door swing clashes with a basin or a wall, and the finish does not match the vanity next to it. A complete product submittal is how that risk is removed before anything is manufactured. Below is the package we ask for when a project is specifying Santerson Corner Storage, and what our team returns once we have it.

Why the submittal matters more for corner units than for straight runs

Corner storage sits in the one place where two walls, a door opening and usually a plumbing wall all compete. Our Storage Units range — corner storage, drawer units, freestanding cabinets and open storage — is made to measure for each space, with finish, layout and dimensions specified per project. That flexibility is the reason the paperwork has to be precise: we build what you send us, so the submittal is the contract for the finished item.

The eight items a complete submittal should contain

ItemWhat to includeWhy we need it
1. Project and room referenceProject name, unit or room number, drawing revision, the consultant or contractor raising the enquiryKeeps every email, sample and shipment tied to the correct bathroom on a multi-unit job
2. Location drawing or sketchThe two wall returns, finished wall faces, clear opening width and height, skirting or tile build-up, and what is behind the corner (stud, pipe, waterproofing)Determines whether the unit is a true corner fit, a diagonal fit or a straight unit cut short
3. Finished dimensions with toleranceWidth at each wall, depth, overall height, and whether floor and ceiling finishes are already setMade-to-measure units are built to the numbers supplied, so dimensions taken before tiling or flooring is complete are a frequent cause of an out-of-square reveal on site
4. Layout and internal configurationShelf, drawer or mixed layout; shelf positions and adjustability; drawer count and intended contents (towels, linens, cleaning supplies, toiletries)Fixes shelf heights and load requirements before production rather than on site
5. Door type and opening clearanceHinged, sliding or open; handing; required swing and slide clearance; proximity to the basin, WC, shower screen or room doorPrevents the classic clash where a new cabinet door cannot open because it hits a fixture
6. Materials and finish scheduleBody material, door front, finish (matte, gloss, lacquer, veneer, laminate), edge treatment, hardware style and finish — matched to the vanity, mirror cabinet or joinery line it sits besideGuarantees the corner unit reads as part of the same fit-out instead of an add-on
7. Installation and site conditionsFixing method and substrate, whether the unit is wall-hung or floor-standing, load-bearing notes, access route to the room, delivery floor and lift sizeOur installation guidance is written against real site conditions, not an idealised drawing
8. Commercial detailsQuantity per type, required on-site date, delivery address and Incoterms, packaging preference, any branding or labelling requirementSets production slots and the freight plan; quantities split across room types are common in multi-unit work

What you receive back from us

  • A configuration confirmation showing the proposed dimensions, layout and hardware for each item type.
  • Finish samples or a finish reference matched to your schedule, so the corner unit matches the surrounding bathroom cabinetry.
  • A quotation with unit price, packaging and freight option for that specific configuration.
  • Coordination notes flagging anything in the drawings that will conflict on site — a door swing, a tile set-out, an uneven reveal.

This mirrors how we run project coordination generally: brief and design proposal first, quotation and detail confirmation second, then production, shipment and follow-up. As a one-stop furniture and building materials supplier, we hold the same information for vanities, mirror cabinets, tall cabinets, ceramics and lighting in one place, so a bathroom schedule can be coordinated as a set rather than item by item from different vendors.

Questions to settle before you send the submittal

  • Are measurements taken off finished wall and floor faces, including tile and waterproofing build-up?
  • Is the corner square, or does the drawing show a rake that the unit must follow?
  • Does the specified finish match the finish code already approved for the vanity or joinery package?
  • Has the door swing been checked against every fixture within reach of it?
  • Is the unit wall-hung or floor-standing, and is the substrate confirmed for fixings?
  • Are quantities grouped by room type so identical items are produced together?

A note on what we do not commit to in writing

Corner storage specifications, material options and hardware availability are confirmed per configuration. Dimensions, load ratings and installation requirements are stated for the selected configuration only, once it is fixed for your project — not carried across from a similar item. Where a specification touches local building requirements, we work from the details your consultant supplies rather than assuming what applies in your market.

Sending the package

Send the drawing set, dimension list and finish schedule for the room types involved, along with your required on-site date. We review it, come back with any conflicts we can see, and return a configuration and quotation you can put in front of the client. If your project also needs tall cabinets, drawer units or open storage in the same bathroom line, include them in one submittal so finishes, materials and shipment are handled together.