A media wall looks simple on a rendering and becomes complicated on site. The television has to be reachable for service, the devices behind it need ventilation and remote control, cables have to reach power without being visible, and the joinery has to sit flush with flooring, panelling and lighting that other trades are installing. This guide walks through how we specify Santerson Integrated Media Storage for guest rooms, villas and hospitality common areas, what to decide before you place an order, and where projects usually go wrong.

What integrated media storage actually solves on a project

Loose TV furniture — a console, a sideboard, a wall-mounted panel — solves one problem and creates three. The screen sits away from the wall with visible cable drops, devices sit on open shelves in front of a finished surface, and the piece itself has to be coordinated separately from the wall finishes around it. Integrated media storage treats the screen, the equipment and the storage as one built-in assembly designed to the room.

In practice this means the recess for the display, the shelving behind or beside it, the closed cabinets below and any open display niches are drawn together at made-to-measure dimensions. Because Santerson is a furniture and building materials manufacturer rather than a single-product supplier, the same wall system can be matched to the engineered wood flooring, decorative wall panels, wardrobes and kitchen cabinetry in the same building. For a procurement team, that reduces the number of separate suppliers whose dimensions and finishes have to agree.

Where these wall systems fit in hospitality and villa work

Both audiences want the same outcome — a screen that disappears into a finished surface when it is off — but they buy it for different reasons. A hotel or serviced apartment specifies the wall as part of a room package repeated across many keys, so consistency, service access and durability of hardware matter more than novelty. A private villa specifies one wall per room, and the client cares about proportion, lighting and how the panel meets the flooring and ceiling. The three configurations in the Integrated Storage Walls group each answer a different room problem, and most projects mix them:

  • Integrated Media Storage — the screen and its equipment are built into the wall, with closed storage for consoles, routers, minibar equipment or luggage so nothing is on show in the guest room.
  • Mixed Open & Closed Storage — open shelves for books, glassware and objects, closed cabinets for everything that would otherwise become clutter. This is the usual choice for villa living rooms and hotel suites where guests display and store in the same wall.
  • Open Display Niches — recessed niches for ceramics, artwork or amenities, often paired with integrated cabinet lighting so the display reads properly in the evening.

Related groups are worth specifying at the same time. The Media & TV Walls collection covers full-height media walls, integrated TV panels and a storage & display combo for lobbies and lounge areas. If the brief calls for a lower, freestanding piece instead of a built-in wall, TV cabinets such as integrated LED media units or open & closed combo units do the job with less site work.

Six decisions to settle before you order

Work through these in order. Each one changes what appears on the production drawing, and each is cheap to change on paper and expensive to change on site.

1. Screen size, mounting method and service access

Send us the display model or at least the screen size and its VESA pattern. A wall-hung TV needs a fixing detail into the wall behind the joinery, not just into the panel; a screen that must be pulled forward for servicing needs an articulating arm and clearance around it. Specify which it is at drawing stage — cutting a finished panel on site is the most common and most expensive correction.

2. What sits behind the panel, and how it stays cool and reachable

Decide what equipment actually lives in the recess: set-top box, media player, router, power distribution. Closed cabinets with solid doors trap heat and block infrared signals, so we plan ventilation routes and, where required, a door or louvered detail that keeps the remote working without exposing the equipment.

3. Cable routes and the electrical set-out

Power, data and aerial points have to land behind the recess at the right height, and they are set out by the electrical contractor before our panels are manufactured. We supply the setting-out drawing showing point positions; your site team executes it. Getting this sequence wrong is why so many media walls end up with a visible trunking.

4. Storage mix: open, closed or both

Guest rooms need luggage storage and closed cabinets; a villa living room usually needs a balance of display shelving and concealed storage. Tell us what the room must hold — luggage dimensions, minibar items, glassware, books — rather than choosing shelf patterns from a catalogue.

5. Finish coordination with the rest of the fit-out

A media wall that does not match the wardrobes, cabinetry and panelling beside it reads as an add-on. Because our built-in furniture, wall panel systems and Charcoal European Oak engineered wood flooring come from the same factory, we can match veneer, lacquer and melamine finishes across them. Send the finish schedule early so the wall is produced in the same batch as the surrounding joinery.

6. Made-to-measure sizing and site tolerance

These systems are built to project-specific dimensions rather than standard widths, which is what allows them to sit flush into a room. It also means the openings have to be dimensionally correct. Confirm finished floor levels and wall set-outs before final production drawings are released.

How to brief us: a comparison of starting points

The fastest way to get usable drawings back is to send the information below with your first enquiry. The table shows what we need by project type and what gets settled at drawing stage.

If your project is…Send us…What we settle at drawing stage
A hotel or serviced-apartment guest roomRoom type, screen size and mounting method, luggage and minibar requirements, finish scheduleRecess position, ventilation, service access, closed storage layout, matching to wardrobe and door finishes
A private villa living room or media roomFloor plan, ceiling height, display items, audio-visual equipment listOpen-to-closed ratio, niche lighting, panel scale, integration with full-height storage walls
A lobby, lounge or clubhouseFootfall expectations, screen size, display and storage needs, wall lengthPanel system choice, sliding storage panels or fixed cabinets, hardware specification
A renovation where existing walls stayExisting photographs and measured surveyWhether the wall can be built out to flush, and how new panels meet existing finishes

Two things we do not promise on paper: exact material make-up and fixed technical figures. Veneer, lacquer, melamine and glass-front options are all available, but the specification you receive depends on the configuration you choose for that project, so dimensions, hardware, lighting and electrical details are confirmed in the drawings rather than quoted from a standard datasheet.

The ordering path, from enquiry to handover

Our project workflow runs through consultation, design and planning, production, logistics, installation and after-sales. For a media wall this looks like:

  • Brief and space planning. Layout drawings and 3D visual renderings so the client can see panel scale before anything is cut — see interior design services.
  • Detail confirmation and quotation. Production drawings with set-out points, finish samples, then the priced order.
  • Manufacturing and quality control at our China factory, with custom & OEM service where a project needs bespoke dimensions or finishes outside the standard range.
  • Packaging and shipping. Logistics and door-to-door delivery covering freight, customs paperwork and container loading; import terms and transit are confirmed per project.
  • Installation and handover. On-site installation support, inspection of snags and after-sales support, including spare parts for hardware.

Five mistakes we see on media wall projects

Most of the rework calls we receive trace back to one of five sequencing errors. None of them are difficult to avoid if they are handled at drawing stage:

  • Ordering before the screen is chosen. The recess, ventilation and fixing detail all depend on the display. Lock the model or at least the size first.
  • No service access. A wall-hung TV sealed behind a fixed panel cannot be reached for cabling or warranty work without removing joinery.
  • Electrical points set out after the panels are made. The setting-out drawing must reach the site team before manufacture, not after delivery.
  • Specifying the wall in isolation. A media wall ordered separately from the wardrobes and panelling rarely matches perfectly; ordering them together keeps finishes consistent.
  • Closed cabinets with no ventilation. Equipment overheats and remotes stop working — plan the vent route at design stage.

Checklist to send with your enquiry

If you would rather not work through the table above, this is the minimum set of information that lets us price a media wall accurately:

  • Room type, quantity of walls required and project location
  • Screen size, model or VESA pattern, and whether it is wall-hung or recessed
  • Equipment list for the recess and any ventilation or remote-control requirement
  • Storage requirements: luggage, minibar, glassware, display items
  • Finish schedule or reference samples from the surrounding joinery
  • Finished floor levels and measured wall dimensions, or a measured survey
  • Delivery destination and preferred Incoterms

Frequently asked questions

Questions we are asked most often during specification:

Are these systems standard sizes or made to measure?

Made to measure. Layout, dimensions, materials and finishes are specified for each space, which is what allows the wall to sit flush with surrounding finishes.

Can the media wall match our wardrobes and kitchen cabinetry?

Yes, and it should. Santerson manufactures sliding door wardrobes, kitchen cabinetry, panelling and doors in the same facility, so veneer, lacquer and melamine finishes can be specified as one set.

Do you supply the electrical work?

No. We provide setting-out drawings showing where power, data and aerial points must land; your local contractor carries out the electrical work to those positions.

Can one supplier handle the whole room, not just the media wall?

That is the point of working with a one-stop furniture and building materials supplier. Flooring, wall panels, ceilings, doors, lighting, bathroom ceramics and outdoor furniture for terraces and poolsides can all be ordered against the same project drawings.

What if our project needs a design that is not in the catalogue?

Send the drawing. Bespoke dimensions, materials and finishes fall under custom and OEM manufacturing, including prototyping and branding where required.

Talk to us about your media wall

Send the drawings and we will price them.

If you are specifying integrated media storage for a hotel, serviced apartment or villa project, send us the room drawings, screen details and finish schedule and we will come back with production drawings and a quotation. Contact PHILLIP on +86-13928214007 (phone/WhatsApp), email santerson@qq.com, or use the form on our contact page. We also produce full project packages — flooring, wall and ceiling systems, doors, wardrobes, cabinetry, lighting and outdoor furniture for villas and resorts — under one order.