A swim spa is one of the few outdoor products that touches architecture, structure, electrical work and waterproofing at the same time. On paper the Outdoor Swim Spa WS-S38 looks simple: a shell with jets, lighting, ozone sanitation and a waterfall. On site it becomes a coordination item that appears on the landscape plan, the power layout, the drainage detail and the access route for delivery. The following is how we line it up with design drawings and real site conditions before anything is manufactured.
Start With the Catalogue Envelope, Not the Picture
The first thing the architect or landscape designer needs is a footprint they can trust. The published catalogue dimensions for WS-S38 are 3760 × 2080 × 1110 mm. Those numbers go onto the plan as the unit itself, and then the design team adds its own clearances around it: space for the steps at the entry end, room to reach the equipment and control system for servicing, and a margin where the coping, decking or cladding will be built up.
We ask for the drawing in the same units we work in — millimetres, with the finished deck level marked — because a 1110 mm shell depth interacts directly with how deep the surrounding platform sits and with the height of the steps specified for it. A plan that only shows a rectangle floating in a garden is not enough to price or build.
Confirm the Configuration Before the Drawings Are Frozen
WS-S38 is listed with water jets, LED lighting, ozone and a waterfall. The specification sheet shows one control set, three water pumps, one filter pump, 51 jets in total including six water columns, four main LED lights plus twelve small LEDs, and a total power figure of 14.05 kW.
That last number matters far more than it looks. Total connected load is the figure an electrical consultant uses to size the circuit, the protection device and the cable run from the switchboard — and it changes as soon as options are added or removed. The catalogue also lists optional items such as UV sterilisation, additional water pumps, heat pumps, sand filtration, insulation and steps, and availability differs by configuration. Our practice is to lock the option list with the client first, then issue the electrical schedule, rather than assuming a base load and revising it after the electrician has already ordered cable.
What We Send to the Design Team
- A dimensioned outline for the plan, with the entry end and steps identified so the deck layout can be arranged around them.
- The equipment list with pump quantities and jet counts, so hydraulic and acoustic decisions are made knowingly.
- Total power for the selected configuration, together with a request that supply, protection and isolation be confirmed by the local electrical engineer to their own code.
- Service access notes: clear reach to pumps, filter and control system, not just a sealed surround.
- An open question list — options included or excluded, filtration route, insulation, step type — that must close before production starts.
Site Requirements That Decide the Detail Design
Support and sub-base
A filled spa is heavy, and the load path runs through the slab or pedestal system beneath it. The structural engineer needs the installed position on the plan early enough to design a supporting base that carries the full shell footprint evenly; partial support under the perimeter only is a common cause of later cracking in the surrounding platform.
Drainage and overflow
Where the discharge and any overflow are going has to appear on the drainage drawing, not be discovered during installation. On terraces and podium decks this interacts with existing falls and gullies; at ground level it interacts with the surrounding paving level.
Waterproofing and thresholds
Where decking meets the shell, the detail should be drawn rather than improvised on site. Deck boards, coping and any timber or stone edge need a defined junction so water runs away from the platform and the access panel remains removable.
Delivery route and lifting
This is the item most often left out of the programme. A shell of this size has to reach its position — through a gate, over a finished surface, or by crane over a boundary. Site access should be checked against the delivery drawings before shipping is arranged, and any lifting or route protection written into the site works package.
Where Customisation Actually Helps
Not every plot takes a rectangular shell comfortably. Where the terrace is curved, set into an alcove, or aligned to an irregular boundary, our Customizable Shape Outdoor Spa covers square, round, oval and curved layouts on an acrylic shell with structural reinforcement. For villa and resort schemes that need the spa to read as part of a designed outdoor room rather than an added appliance, that route is usually easier to detail than forcing a standard outline into a tight corner.
For larger terraces where swimming length and soaking are wanted in separate zones, our Long Outdoor Swim Spa with Hydrotherapy & Relaxation Pool pairs an extended swim channel with a dedicated relaxation area. It is a different coordination job — longer deck runs, more plant capacity — but it solves a spatial problem WS-S38 alone does not.
For hospitality schemes and high-end villas where the water feature carries the visual weight of the space, the Luxury Outdoor Swim Spa with Massage Jets, LED & Water Features is specified on similar principles: envelope first, then lighting and water-feature control integrated into the exterior lighting layout.
Coordination Checklist Before Order
- Plan drawing with finished deck levels, clearances and step position marked.
- Structural note confirming the supporting base under the full footprint.
- Electrical schedule for the confirmed configuration, signed off by the local engineer.
- Drainage and overflow routing shown on the drainage drawing.
- Service access panel or removable deck section identified.
- Delivery route, lifting method and any route protection agreed with the site contractor.
- Option list closed in writing: filtration, sanitation, heating, insulation, steps.
How Our Team Fits Into the Process
SANTERSON works as a one-stop furniture and building materials supplier for villa, hospitality and office projects, so the swim spa is usually ordered alongside the decking, outdoor furniture, lighting and interior fixtures around it. That is the practical advantage: one team reconciles the spa envelope with the rest of the package instead of three separate suppliers exchanging drawings that never quite agree. Our services cover design coordination, production and quality control, freight and door-to-door delivery, then installation support on site.
If you have drawings for a project and want the spa checked against them, send the plan with the intended location and the option list you are considering. We will come back with the confirmed configuration, the coordination points that need closing, and an itemised quotation.