A quotation for mahogany solid wood wardrobes arrives with a price, a lead time and a few lines of specification. Two suppliers can quote the same bedroom or guest-room run and produce documents that are impossible to compare side by side. The problem is rarely the number at the bottom of the page — it is that the proposal does not yet contain enough information for you to judge what you are buying, what is included, and where the cost will grow during production.
The checklist below follows the order in which a made-to-measure wardrobe proposal actually gets built up: material definition first, then construction and joinery details, then configuration and tolerances, then commercial scope. Use it as a review sheet before you sign anything, from either an overseas factory or a local joiner.
1. Confirm what "mahogany" means in this quotation
Solid wood wardrobe listings are frequently described by a species name that covers several commercially different timbers. Before you compare prices, ask the supplier to state the exact botanical species, the board construction, and whether every visible component is the same material.
- Species and origin. Ask for the botanical name rather than a trade name such as mahogany, sapele or khaya. Two boards sold under one trade name can differ in colour stability, density and price.
- What is actually solid. A "solid wood" wardrobe may combine solid frames with engineered core panels, or solid carcass with veneered door faces. Neither choice is wrong, but the proposal should say which parts are solid, which are engineered, and which are veneered.
- Matching components. Confirm that doors, drawer fronts, shelves, interior boxes and any applied mouldings are specified as the same species and grade, so ageing and colour change stay consistent across the unit.
- Grade and grain direction. Ask whether the doors use vertical or horizontal grain, and whether sapwood and mineral streaks are accepted or excluded. These decisions change both appearance and cost.
2. Read the construction specification, not just the finish
Solid timber moves with seasonal humidity. A well-drafted proposal shows how that movement has been designed for; a thin one lists a colour and stops there. Ask to see these details in writing:
| Detail to check | What a complete answer looks like |
|---|---|
| Panel construction | Frame-and-panel or solid-panel doors with an explicitly stated movement allowance, floating panel fit and panel thickness. |
| Carcass build | Side, top and back panel materials and thicknesses, plus how the carcass is fixed to the wall and whether a scribe or filler for out-of-plumb walls is included. |
| Joinery | Dovetailed, dowelled or cam-locked construction stated per joint type, with soft-close hinges and runners named by brand or series. |
| Finish system | Number of coats, sanding stages, primer/undercoat, top-coat type (lacquer, lacquer sheen level, oil, varnish) and whether interior surfaces are sealed as well as exterior faces. |
| Edge treatment | Solid timber edges on visible components; how edges on any engineered component are finished. |
Sheen level matters more than people expect. A high-gloss finish on a dark mahogany-toned door shows fingerprints and every grain filler imperfection, while a matte or satin system is more forgiving in a heavily used bedroom. Ask for the sheen to be quoted per surface rather than assumed.
3. Check that the configuration matches the room
Made-to-measure work should reflect the space, not a catalogue width. Compare the proposal against your own measured drawings and look for:
- Overall external dimensions versus the clear opening, including skirting, architraves, cornices, ceiling irregularities and any services running down the wall.
- Internal layout: hanging heights, shelf depths, drawer counts, trouser or jewellery trays, lighting provisions and whether the interior layout was designed by you or defaulted by the supplier.
- Door type and clearance. Hinged doors need swing clearance; sliding doors need track depth and a level floor. If neither suits the room, an open wardrobe or freestanding system may be the better answer, and a good supplier will say so.
- Adjacent work. Where the wardrobe meets veneer panelling, wall cladding or an integrated door, ask who supplies and installs the interface detail.
For a villa or hotel room block, also confirm whether one configuration applies to every unit or whether variations exist by room type. A single specification repeated across units is easier to price and to quality-control; three variations multiply both.
4. Test the supplier's sample and approval process
The most reliable signal in a proposal is how the supplier proposes to get sign-off before mass production. A manufacturer working on custom and OEM projects should be able to describe, unprompted:
- A physical finish sample or door section in the specified species and finish, sent for approval.
- Shop drawings or 3D renders showing elevations, internal layout and hardware positions, with your comments recorded in a revision log.
- A first-article or prototype unit for larger orders, with inspection points defined before it ships.
- Written confirmation of dimensions and selected specifications at each approval stage, signed by both sides.
If the supplier will not commit to any of these, you are accepting the risk that the finished wardrobes will be judged only after delivery. For multi-unit projects, insist on a documented approval sequence; it is far cheaper than rework.
5. Compare commercial scope line by line
Wardrobe price differences usually hide in scope, not in timber. Put every quotation into one table and check the same items:
| Scope item | Question to ask |
|---|---|
| Pricing basis | Is the price per linear metre, per square metre of elevation, or per unit? Does it include plinths, scribes and internal fittings? |
| Incoterms | Factory gate, FOB, CIF or delivered to site. Freight, insurance and duties change the real comparison. |
| Packaging | Flat-packed or assembled, crating standard, corner protection, and who bears damage in transit. |
| Lead time | Time from approved drawings to despatch — not from enquiry — plus what restarts the clock if you revise a layout. |
| Payment terms | Deposit, stage payments against approved milestones, and retention or balance held until inspection. |
| After-sales | What is covered, for how long, who supplies replacement doors, hinges and runners, and how claims are handled at destination. |
A supplier offering design, production, freight and installation under one contract reduces interface risk, but only if the interfaces are still documented. Ask which party is responsible for site measurement, wall preparation, final fixing and snagging, and get those responsibilities named in the contract.
6. Red flags worth walking away from
- A price given before drawings or a site dimension sheet exists.
- Vague species wording, or one trade name used for several different components.
- No movement allowance for solid panels in a humid or heated climate.
- No finish sample offered, and no prototype option for larger orders.
- Scope gaps filled with "to be confirmed later" on freight, installation or hardware.
None of these checks require specialist knowledge — they require writing the questions down and insisting on written answers. Suppliers who work regularly on villa and hospitality fit-outs answer them quickly, because their own production process already depends on that information.
Frequently asked questions
Should I ask for a prototype wardrobe before ordering a whole room block?
For orders covering several units, yes. Ask what the supplier charges for a first article, how long it takes, and whether that cost is credited against the production order.
Is solid wood always better than veneer for wardrobes?
Not always. Solid timber suits applied mouldings and traditional profiles; engineered boards with a wood veneer are more dimensionally stable for large flat doors. Compare them by application, not by prestige.
What document protects me if the delivered wardrobes do not match?
The approved shop drawings, finish sample reference and signed specification sheet. Keep every revision in one dated set; a proposal without those attachments is difficult to enforce.
If you want a second opinion on an existing quotation, send us the drawings and specification and we will mark up the gaps — material definitions, construction details and scope items that are missing or left open. That review costs nothing and often changes the comparison between suppliers more than a renegotiated price would.