Why A Double Vanity Needs More Sign-Off Than A Single One

A Santerson double vanity is not a single unit with two taps bolted on. Two basins, two sets of waste and trap connections, two mirror zones and a shared run of cabinetry mean every dimension that was "close enough" for a single basin suddenly has to be exact. That is why we recommend project teams treat the double vanity as a coordinated assembly rather than one catalogue line, and confirm the whole package before approval — exactly the approach we use on turnkey interior project solutions, where bathrooms are specified alongside flooring, joinery, lighting and wall finishes instead of in isolation.

Before you approve production, six things should be closed out: overall width and projection against finished wall lines; basin type and set-down; storage layout for each side; the mirror and lighting package; the substrate and finish schedule; and the wall support and service routes behind the unit. Each one is cheap to change on paper and expensive to change on site.

1. Confirm Dimensions Against Finished Wall Lines

Our vanities in this range are made to measure, so the width you send us is the width we build. The trap for project teams is sending the architectural dimension instead of the built dimension. Tiling, waterproofing, plasterboard and skirting all consume depth and length, and a double vanity has far less tolerance than a single one because both basins and both seating positions have to sit inside the same run.

Before sign-off we ask for:

  • The clear opening width measured to finished faces, not structural lines, with the number of millimetres lost to wall finishes stated.
  • Projection from the finished wall face, checked against door swings, shower screens and the circulation space in front of the basin.
  • Clearance at each end — where the unit meets a corner, a robe return, a towel rail or a hinged door.
  • The height of the completed top surface, cross-checked with mirror zones, tap spouts and any wall-hung fittings above.

For a wall-hung configuration, add the position of the carrier frame and the fixing points to that list. The carcass is built around what the wall can actually carry, so the support system has to be known before the carcass is drawn.

2. Fix The Basin Type And Set-Down Early

The vanity unit and the countertop are separate decisions, and they have to be reconciled before either is released. A double basin countertop can be specified with undermount basins, vessel bowls sitting above the counter, or an integrated top where the basin and surface are one piece — as in our integrated countertop vanity. Each option changes the cut-out, the height of the finished surface, the tap reach required, and whether the mixer sits on the deck or on the wall.

What we need confirmed in writing:

DecisionWhy it must be closed before approval
Basin style (undermount, vessel, integrated)Determines cut-out size and position, deck thickness and finished counter height.
Basin-to-basin spacingSets mirror positions, tap locations and the elbow of each waste run; too little spacing causes splash overlap between users.
Tap mounting (deck, wall or integrated)Wall-mounted mixers need in-wall bodies set out before tiling; deck-mounted needs holes drilled to the final template.
Waste and trap typeBottles traps, swan-neck traps and concealed wall wastes each need different clearance inside the carcass.
Overflow provisionBasins with and without overflows take different waste bodies; mixing them up mid-production causes delays.

3. Decide The Storage Layout Separately For Each Side

A double vanity is usually used by two people with different storage habits, and the trap is specifying one mirrored layout when one side needs drawers and the other needs shelving for taller bottles. Because the carcass is built to the project rather than picked from a shelf, we can split it — but only if the split is drawn before cutting.

Typical decisions to record per side:

  • Drawers versus hinged doors versus open shelving, and how many of each.
  • Whether the trap and waste occupy one bay, which removes that bay from storage use.
  • Internal fitments — shallow trays for daily items, deep drawers for linen, hamper provisions below.
  • Whether integrated lighting is required inside the carcass, since wiring has to be routed before assembly.

If floor space is tight and you want the cabinet off the floor, compare the wall-hung option in the same collection: the Santerson floating vanity exposes the floor, which makes cleaning easier and keeps plinth height out of the equation, but it puts the whole load into the wall structure. That trade-off belongs in the approval pack, not in a site variation.

4. Sign Off The Mirror And Lighting Package With The Unit

The most common on-site problem we see with double vanities is a mirror package approved after the vanity: two zones above one unit, but electrical points set for one centred fitting. Vanity mirrors and lighting are made to the same project dimensions as the cabinet, so they should be drawn together.

Confirm:

  • Whether each user gets their own mirror or one wide mirror spans both positions — this drives both the electrical set-out and the perceived symmetry of the wall.
  • The vertical position of the mirror relative to the finished counter height, checked against the tallest user profile in the brief.
  • Vanity lighting type and placement: above-mirror sconces, an integrated LED strip, or a LED mirror cabinet that combines storage with the light source.
  • The electrical rating and IP zone for any fitting within reach of the basin, plus who is signing off that specification locally.

We supply the fixture and set it out to your drawings; the local electrical compliance decision stays with the project's licensed electrician and certifier. We would rather that boundary be stated in the approval pack than assumed.

5. Lock The Material And Finish Schedule

Bathrooms are the hardest room in the building for finishes: constant humidity, cleaning chemicals, and hands on every surface several times a day. A finish approved from a small sample board can behave differently across a 1,600 mm door front. Before approval we ask teams to confirm:

  • The substrate specified for wet-area use, and the sealing detail at the base and sides.
  • Door and carcass colour, sheen level and grain direction — with a note on whether grain runs vertically or horizontally across paired doors.
  • Edge treatment on visible ends, since a double vanity often shows a return to the room.
  • Hardware: handle or handleless, hinge type, soft-close provision, and the finish of taps and waste trims so metals match across the room.
  • The countertop material and edge profile, with a physical sample signed against the drawing.

Where a project needs the bathroom joinery to match cabinetry elsewhere in the building, say so at the enquiry stage. Matching a lacquer or veneer across interior fixtures and built-in furniture is a production decision, not a finishing trick.

6. Resolve Wall Support And Services Before Production

For wall-hung double vanities the structure behind the unit has to be resolved before we build around it. The carrier and fixing system determines the carcass depth, the drawer runners available, and whether the design can carry two people leaning on it. At the same time, water and waste set-out is fixed once tiling is done.

Items to close out:

ItemConfirm withLatest safe moment
Carrier frame position and load ratingStructural designer / installerBefore wall lining is closed up
Cold and hot supply locationsPlumbing contractorBefore tiling
Waste outlet position and fallPlumbing contractorBefore tiling
Electrical points for lighting and mirrorsElectricianBefore tiling
Tank / cistern position if the WC is adjacentPlumbing contractorBefore wall framing

The Approval Checklist We Work To

Run this list before you release the order, and each line should have a name and a date against it:

  • Finished dimensions confirmed on site, not from drawings alone.
  • Basin type, spacing and set-down fixed; countertop cut drawing signed.
  • Carcass layout per side agreed, including the bay occupied by plumbing.
  • Mirror and lighting layout drawn to the same elevations as the vanity.
  • Finish schedule signed against physical samples, including edge and hardware.
  • Wall support, water, waste and electrical routes resolved and documented.
  • Delivery route checked — stair widths, lift dimensions and turning space at the bathroom door.

That last line matters more than teams expect. A double vanity is a long, heavy unit, and if it cannot pass the lift or the corridor it gets crated back or cut on site. Tell us the access route at the same time you send dimensions, and we will confirm whether the unit should arrive assembled or in sections that join on site.

How This Fits Into A Single Procurement Package

Bathrooms rarely fail as individual products; they fail as coordination gaps between trades. Sourcing basins, vanities, showers, lighting and finishes from one manufacturer removes the arguments about whose drawing is authoritative — which is the point of bathroom sanitary fixtures procurement under one supplier, backed by custom furniture manufacturing when a standard configuration does not fit the space.

Send us the bathroom elevations and we will return a specification for review: carcass construction, storage layout, countertop cut-out drawing, mirror and lighting set-out, and a finish schedule. Once you sign it, that signed pack becomes the production reference — so the number of open questions at approval is the number of variations you avoid on site.

Planning a bathroom package for a villa or hospitality project? Send your elevations and finish schedule to PHILLIP by email at santerson@qq.com, or reach us on phone/WhatsApp +86-13928214007. Include clear opening dimensions, basin preference and access route, and we will come back with a specification you can circulate for sign-off.

Note: configurations in this range are made to order, so the specifications above are the items each project must confirm rather than fixed catalogue values. Local building, plumbing and electrical compliance is the responsibility of the appointed local contractors and certifiers; we supply to your approved drawings.