A swim spa quotation only works when the specification behind it is unambiguous. Two buyers can ask for the same model and receive very different packages, because shell size, jet count, pump arrangement and water treatment are usually settled line by line rather than in one sentence. The following guide uses Outdoor Swim Spa WS-S06M to show how a purchaser, specifier or project coordinator can write a specification that a factory can price accurately and that the site team can install without rework.

Start With the Space, Not the Model Number

Model codes are convenient shorthand, but they do not describe the room. Before you list any equipment, record what the installation position actually allows:

  • Clear opening and access route. The catalogue shell for WS-S06M is 5900 × 2200 × 1610 mm. Measure the gate, doorway, side setback and turning space on the delivery route, not only the final footprint on the plan.
  • Support structure. Note whether the spa sits on a ground slab, a suspended timber or concrete deck, or a plinth with an access pit. State the allowable load and who designs the supporting structure.
  • Water supply, drainage and overflow. Identify where the fill line, the drain and any pump-out discharge connect, and whether a primer or service valve is required locally.
  • Electrical position. Record the available supply arrangement and where the isolating device will sit relative to the control panel location on the shell.

Writing these five items first prevents the common sequence in which a model is chosen, then quietly re-specified once the site constraints appear.

State the Catalogue Baseline for WS-S06M

A usable specification begins with the published baseline and then marks every deviation from it. For this model, the product page lists the configuration below. Treat these as catalogue values to be confirmed against your quotation, not as fixed guarantees for a specific order.

Specification itemCatalogue entry for WS-S06MWhat to confirm on the quotation
ModelWS-S06MExact model code, including any suffix that denotes a variant
Catalogue dimensions5900 × 2200 × 1610 mmWhether the figure is shell outer size and how coping or cladding affects it
Control system1 setPanel type, mounting position and who supplies the final circuit connection
Water pump2 pcsPump duty for each circuit and whether either pump serves a jet or feature circuit
Filter pump1 pcFiltration cycle, run time control and filter element size
Jet total48 pcsAdjustable versus fixed jets, and the jet layout in seating versus lying positions
LED lighting17 lights; 17 small LED lightsColour mode, control method and how fixtures are sealed and accessed
Total power6.95 kWWhether the figure covers the selected options, and the local supply arrangement required
Features shownWater jets, LED lighting, Ozone, 4 water columnsWhich of these are included in your package and which are priced as extras
Swim training systemNot listed for this model in the catalogue specificationIf you want swim exercise, ask explicitly whether it can be added to WS-S06M or whether a different model is required
The most expensive misunderstandings come from silent assumptions. If the swim training system is not on your quotation and you expected continuous swimming, raise that in writing before production starts.

Separate Included Equipment From Options

Catalogue-listed options for this range include control systems, UV sterilisation, water pumps, heat pumps, sand filtration, insulation and steps. Each one changes price, power draw and the space needed for servicing, so list them as numbered lines with a clear status of included, optional or excluded:

  • Heat pump. State the target water temperature and the ambient conditions the spa will face. Confirm whether the heat pump is supplied with the spa or sourced locally.
  • Ozone versus UV sterilisation. Both appear in this range. Specify which one you are buying and how consumables are replaced.
  • Sand filtration versus cartridge filtration. Note the service access required, because a filter buried behind fixed coping is difficult to maintain.
  • Insulation. Relevant where the spa operates in cool conditions or where energy running cost matters; ask what is insulated and to what thickness.
  • Steps and access. Confirm whether steps are fixed to the shell, deck-mounted, or provided as loose items.

Write the Verification Points Into the Specification

Close the document with a short list of confirmations that must be settled before order confirmation. This is where a buyer protects both budget and programme:

  • Included equipment list, itemised, with quantities matching the catalogue baseline above.
  • Electrical requirements for the selected configuration, including total connected load and any local supply work outside the supplier's scope.
  • Coping, cladding and finish colour as shown on an approved sample or drawing.
  • Responsibility split for structural support, water connections, drainage and final electrical connection.
  • Packaging, shipping method and delivery address, with door-to-door delivery arranged where the project requires it.
  • Spares list, warranty terms and the after-sales contact who handles spare parts and replacement.

Coordinate the Swim Spa With the Wider Project Package

A swim spa rarely sits alone. Poolside loungers, shade structures, wet-area flooring and lighting all need to match the shell finish and the deck levels, which is easier when one supplier holds the full schedule. SANTERSON works as a one-stop furniture and building materials supplier, covering product specification, manufacturing and project coordination for villas, hospitality and office projects, so the spa area can be specified alongside outdoor furniture for villas and resorts in a single package.

Where a project needs an alternative footprint instead of the WS-S06M shell, the range also includes swimming pools and swim spas in other sizes, plus customised shapes for terraces and garden settings. Specify the space first and let the model follow it.

Send us your dimension sketch, supply arrangement and the option list above, and we will return an itemised specification for Outdoor Swim Spa WS-S06M with the included equipment confirmed line by line. Contact SANTERSON to start the specification review.